2 September 2024
ASX: CXO Announcement
Exploration Update – Napperby Uranium Project
Summary
•
Approvals process underway to conduct Resource extension drilling at the Napperby
Uranium Project in the Northern Territory
•
Napperby has a current JORC Mineral Resource1 containing 8.03Mlb U3O8 within ~6km of
an estimated ~20km of a prospective paleochannel system
•
Geophysical survey has identified additional multi-commodity targets within the Project
area which will also be advanced
•
Napperby exploration forms part of Core’s FY25 exploration program focused on low-cost
target generation and resource extension in lithium, gold, uranium and critical minerals
•
Entia and Fitton uranium projects also being reassessed
Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide an update on its exploration activities at its
100%-owned Napperby uranium project (Napperby or Project) in the Northern Territory (Figure 1).
Uranium Mineral Resource extension potential
Core’s 100% owned Napperby project has a current JORC (2012) Inferred Mineral Resource Estimate of 9.54Mt @
382ppm U3O8 containing 8.03Mlb U3O8 at a 200ppm U3O8 cut-off with a top cut of 2,500ppm U3O8 applied1. The
calcrete-associated uranium mineralisation occurs within 3 to 8 metres of the surface in semi and unconsolidated
sediments along a Tertiary palaeochannel system.
The area covered by the Mineral Resource represents a fraction of the extensive zone of anomalous mineralisation
identified along the ~20km palaeochannel system outlined by historic drilling activities1 (Figure 2). After a recent site
visit by Core exploration geologists, preparations commenced to undertake further drilling during FY25 with the aim
of extending the Mineral Resource within the prospective palaeochannel.
Core has submitted the requisite approval applications over the areas of interest and expect drilling to commence
later this year.
The Project is one of the few undeveloped uranium deposits in Australia within a favourable jurisdiction. Napperby
consists of 713.6km2 of exploration tenure and is strategically located approximately 120km northwest of Alice
Springs with access to rail, gas and bitumen highways.
1 Refer to ASX announcement, “Napperby Uranium Resource Update and Increase” dated 12 October 2018. Core confirms that it is not aware of any new information or
data that materially affects the information included in previous announcements and that all material assumptions and technical parameters underpinning the Mineral
Resource Estimate continue to apply and have not materially changed.
corelithium.com.au
Figure 1
Napperby Uranium Project Location
Figure 2
Napperby Uranium Mineral Resource Estimate with uranium and geophysical target areas
corelithium.com.au
2
Multi-commodity targeting at Napperby
Consistent with the strategy across the Company’s exploration assets, Core’s technical team has been examining
the potential for other styles of mineral deposits at Napperby. An independent consultant was recently engaged to
undertake a review of existing geophysical datasets over the tenement. In particular, two areas with coincident
positive magnetic and gravity anomalies have been investigated and modelled (Figure 3).
The western anomaly is defined by a peak 6mGal gravity anomaly associated with an 832nT magnetic peak.
Economically, the possible interpretations of this body include a folded Banded Iron Formation (BIF) unit, which
would be prospective for orogenic gold mineralisation, or a north-tilted magnetic intrusive pipe, such as a carbonatite,
which would be prospective for niobium and rare earth elements (REE).
The eastern anomaly is defined by a peak 3mGal gravity anomaly associated with 660nT magnetic peak. The
anomaly appears to be a composite feature, possibly representing a series of vertical dykes or veins which are
denser than typical mafic or ultramafic lithologies, with significant magnetite. Possible explanation of the anomaly
includes carbothermalite veins, iron oxide copper gold (IOCG) alteration, or some style of mineralisation between
these.
In both cases, depth to the top of the anomalous features is interpreted to be shallow, well within the reach of
reconnaissance geochemical programs.
The modelling of these geophysical anomalies is very encouraging. Both targets require further investigation and
follow up that will include field investigations in the first instance that may then lead to testing via shallow RAB and/or
RC drilling.
Figure 3 Napperby geophysical target areas, Western target left and Eastern target right. Both images show VRMI
(Vector Residual Magnetic Intensity) contours on coloured RTP magnetic image.
Entia and Fitton Uranium Projects
In addition to Napperby, Core is also reassessing its 100% owned Entia and Fitton uranium projects.
Between 1992 - 1997 PNC Exploration Pty Ltd explored the area covered by Core’s Entia Project, primarily in the
search for uranium. Assessment of the geology by Core’s exploration team has further highlighted the uranium
prospectivity of the Entia tenure. Entia is located approximately 200km from Napperby (Figure 1).
The Fitton project is located in South Australia, approximately 500km north of Adelaide. The project area is
considered highly prospective for uranium mineralisation given that it is located in close proximity to a number of
existing mines and deposits including Beverly, Four Mile and Mount Gee. Core has previously undertaken
exploration on the project throughout 2012-13.
corelithium.com.au
3
Commenting on the Napperby update, Core CEO Paul Brown said:
“Napperby is one of the few uranium projects with an existing Mineral Resource located in a jurisdiction favourable
to uranium mining in Australia. When combined with the significant exploration potential within the known
paleochannel system, there is potential to grow and ultimately realise value from Napperby as uranium becomes
an increasingly important part of the global energy transition.
We plan to extend the current uranium Mineral Resource at Napperby through targeted drilling when we receive
the necessary approvals. This will proceed in parallel with field investigations into potential for other minerals
within the tenement which have seen minimal previous exploration.
As drilling continues at our Finniss lithium project in support of our restart studies, we will continue to progress
opportunities like Napperby where we believe we can create value for Core shareholders through low cost,
targeted exploration in prospective areas.”
This announcement has been approved for release by the Core Lithium Board.
For further information, please contact:
Investor Enquiries
Media enquiries
Paul Brown
Michael Vaughan
CEO
Executive Director
Core Lithium Ltd
Fivemark Partners
+61 8 8317 1700
+61 422 602 720
info@corelithium.com.au
michael.vaughan@fivemark.com.au
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au
Important Information
This announcement may reference forecasts, estimates, assumptions and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
Competent Person Statement
The information in this release that relates to Exploration Results has been compiled by Dr Graeme McDonald.
Dr McDonald is the Resource Manager for Core Lithium Ltd. Dr McDonald is a member of the Australasian Institute
of Mining and Metallurgy and the Australian Institute of Geoscientists. He has sufficient experience with the style
of mineralisation, deposit type under consideration and to the activities undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (The JORC Code). Dr McDonald consents to the inclusion in this report of the
contained technical information relating to the Exploration Results in the form and context in which it appears.
corelithium.com.au
4
JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code Explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material
to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases, more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g.
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if
so, by what method, etc).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• No drilling results are being reported
Drilling
techniques
Drill sample
recovery
corelithium.com.au
• No drilling results are being reported
• No drilling results are being reported
Criteria
JORC Code explanation
Commentary
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
• No drilling results are being reported
Sub-sampling
techniques and
sample
preparation
Quality of
assay data and
laboratory
tests
• No drilling results are being reported
•
•
•
•
•
•
•
•
•
•
No assay results are being reported
Gravity measurements were made using a Scintrex CG-5 Autograv instrument.
Gravity base station readings were taken at the beginning, middle and end of
each day. Two base stations were established in the survey area.
Gravity readings of 40 seconds were taken at base stations and all survey points.
Gravity drift corrections were applied between stations and post processing.
There were 41 repeat gravity observation for quality control purposes (7%).
Magnetic survey was undertaken in 2007 via a UTS fixed wing Fletcher FU24
aircraft along N-S flight lines 100m apart and with a sensor height of 30m.
E-W tielines were flown every 1000m.
A Scintrex or Geometrics cesium vapour magnetometer with a 0.001nT resolution
and 10Hz sampling rate was used.
A Proton Precession magnetometer with a 0.1nT resolution and a 0.2Hz sampling
rate was used as a base station.
corelithium.com.au
6
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
• The measures taken to ensure sample security.
• No drilling results are being reported
• The results of any audits or reviews of sampling techniques
and data.
• No audits or reviews of the data have occurred.
Location of
data points
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
• The grid system is MGA_GDA94, zone 53 for easting and northing.
• Gravity station spacing varied but was approximately 100m along the lines.
• Three gravity lines cross the western anomaly and only a single line crosses the
eastern anomaly.
• The Napperby gravity survey was carried out by OZ Minerals Ltd on behalf of Toro
Energy Limited in April 2009.
• Gravity survey comprised 565 stations along 12 N-S oriented lines. This is
perpendicular to the geological trends that are in an E-W direction.
• Magnetic flight line orientation and spacing is deemed appropriate for the
geological terrane covered.
• No sample results are being reported
corelithium.com.au
7
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• Acknowledgment and appraisal of exploration by other parties.
• EL31449 is held by Uranium Generation Pty Ltd, a 100% owned subsidiary of Core
Lithium Ltd.
• There are no related royalty arrangements, contracts or caveats.
• The tenements are in good standing with the NT DPIR Titles Division.
Exploration
done by other
parties
•
All modern exploration to date was carried out by Deep Yellow and Toro (2005–
2009). Prior to 2005, exploration was carried out by Paladin and Uranerz. All
exploration was focused on uranium mineralisation.
• The Napperby (New Well) deposit was first discovered and explored by CRA
Exploration and Uranerz in the late 1970s and early 1980s. They drilled wide-spaced
auger and aircore holes and defined a ‘mineralised area’, but did not publish a
mineral resource.
• The deposit remained dormant for over a decade until Paladin applied for the ground
in the early 2000s. Deep Yellow subsequently acquired the Project from Paladin in
2005, then after undertaking drilling, secured an option to purchase with Toro Energy
Ltd.
• In 2007, Toro Energy drilled 515 sonic core holes, 123 auger holes and 814 aircore
holes, followed in 2008 by a further 333 sonic core holes and 784 aircore holes.
• Following that work, in 2009, Toro Energy expanded the historic Napperby resource.
Only 50% of the known mineralised area was included in the 2009 Mineral Resource.
• This option to purchase was not executed following Scoping Studies that concluded
the Project was uneconomic at the current scale/ grade. In 2010, the Project fell
100% back into the hands of Deep Yellow. No further exploration took place. The
Napperby deposit and a small part of the original EL24246 was relinquished in
October 2016.
• Core has inherited an excellent database that includes 2,308 auger, sonic core and
aircore drillholes from Toro/Deep Yellow, downhole gamma and assay data, PFN and
disequilibrium data, metallurgical test-work, scoping study, airborne electromagnetics
and high-resolution magnetics/ radiometrics, gravity, and baseline groundwater
environmental monitoring data. Core has also digitised the 820 Uranerz drillholes,
corelithium.com.au
8
Criteria
JORC Code explanation
Commentary
including assay and gamma data.
• Toro undertook metallurgical test-work from bulk representative samples derived from
Napperby in 2008 and 2009, aimed at characterising the ore and gangue,
determining how suitable the mineralisation is for beneficiation and the optimal
conditions for leaching.
• Toro proceeded to a Scoping and Conceptual Study conducted by URS Australia,
which examined various conventional mining and processing options available at the
time, such as heap leach, agitated leach, direct precipitation and resin-in-pulp.
• Alternative mining cut-off grades and the potential for nearby deposits were also
considered, as was initial up-front beneficiation. A high-level review of infrastructure
requirements, environmental management and CAPEX and OPEX scenarios was
also undertaken.
• Recent geophysical modelling commissioned by Core and reported in this release
was performed by Mitre Geophysics, who undertook forward modelling of two
coincident gravity and magnetic anomalies
Geology
• Deposit type, geological setting and style of mineralisation.
•
The Napperby Project (historically known as the New Well deposit) comprises an
extensive, consistently mineralised zone within 2–8 m of the surface in semiconsolidated and unconsolidated sediments within a Tertiary paleochannel over a
20 km length (striking NNE) in the Arunta Region in the Northern Territory.
• Carnotite mineralisation resides mostly in sands and sandy clays as finely
disseminated particles and blobs up to 5 cm long, but can also be found in overlying
calcrete as joint coatings.
• The current geological model has it that uranium is released from basement rocks
into the aquifer system due to the presence of acidic-oxidised surface waters.
Uranium is carried in solutions with vanadium until it reaches a critical point of
supersaturation, caused by evaporation. Uranium precipitates as a vanadate, along
with carbonate and silica within the paleochannel system. It is thus effectively
controlled by the modern groundwater regime.
• Geophysical targets identified require further work, however possible models for the
western anomaly include folded Banded Iron Formation (BIF) unit, which would be
prospective for orogenic gold mineralisation, or a north-tilted magnetic intrusive pipe,
such as a carbonatite, which would be prospective for niobium and rare earth
elements (REE). Possible explanation of the eastern anomaly includes
carbothermalite veins, iron oxide copper gold (IOCG) alteration, or some style of
mineralisation between these.
corelithium.com.au
9
Criteria
JORC Code explanation
Commentary
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of highgrade results and longer lengths of low-grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
•
No drilling results are being reported
•
No drilling results are being reported.
•
No drilling results are being reported.
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
• These relationships are particularly important in the reporting
of Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional
views.
• Refer to Figures in the release.
corelithium.com.au
10
Criteria
JORC Code explanation
Commentary
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
• Only significant geophysical anomalies within the tenement area have been modelled
and discussed in detail.
Other
substantive
exploration
data
Further work
• All other meaningful and material exploration data has been previously reported as
referenced in the release.
• Follow up field work including drilling is being planned at the Napperby Project.
• Areas of interest within the tenement area are shown on Figures included within the
release.
corelithium.com.au