10m wide gossan found at Yerelina Zinc Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX : CXO
2nd June 2015
10m wide gossan found at Yerelina Zinc Project
HIGHLIGHTS
10m wide gossan found to be high in zinc, lead and silver as part of
2km long mineralised shear zone
Up to 14.7 % zinc, 11.7% lead, and 567 g/t silver assays in previous rock
chips from sampling of old workings and gossans discovered by Core on
EL 5015 in S.A.
High grade mineralisation identified in at least 5 individual structures
to date interpreted to be up to 1.5km long.
Further sampling and soil results expected during the next three weeks
Core awarded SA government co‐funding towards the cost of planned
diamond drilling program
Drilling approvals submitted to fast track the project
Core Exploration Limited (ASX:CXO) is pleased to announce new zinc results from a new 10m wide
gossan found at the Company’s Yerelina zinc project in northern South Australia.
Representative sampling across the newly identified wide, metal rich gossans on Yerelina Zinc
Project in South Australia has identified zones over 10m wide at Big Hill and zinc values up to 5% zinc
(XRF refer Section 1) at Great Gladstone.
The 10m wide sub‐cropping gossan at Big Hill is the surface expression of the Big Hill mineralised
shear zone, which has highly anomalous zinc, lead and silver over at least 2km in sampling to date
(Figure 2).
5km to the east of Big Hill, Core’s previous mapping campaigns have discovered high grade zinc, lead
and silver mineralisation extending over 1 kilometre at Great Gladstone. Of the 38 samples taken
along a 1 km section of fault zone at Great Gladstone, 34 returned combined lead and zinc assays in
excess of 10,000ppm and over 1 g/t silver with the best assay at 14.7% zinc. Lead values peaked at
12.7% and silver at 567 g/t (Figure 1).
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Channel sampling at Great Gladstone indicates grades of 2.5‐3% zinc and up to 109g/t silver and
4.9% lead in channel sampling over 300m apart (Table 1).
Core’s surface mapping, detailed magnetic surveys and remote sensing imagery shows clear
evidence of numerous historical workings and outcropping mineralisation that can be mapped over
hundreds to thousands of metres in repetitious gossanous vein sets over a very broad 8km wide and
2 km long area. The Yerelina project is highly prospective for shallow zinc mineralisation as
evidenced by high grade mineralisation identified on at least five separate north‐south structures
identified by Core.
Further channel and rock chip sampling along with regional and infill soils are currently underway on
the Yerelina Zinc project to test extensions to and potentially discover additional mineralised shear
zones.
Prospect
Big Hill
Big Hill
Great Gladstone
Great Gladstone
East
335193
335202
330138
330167
North
6671840
6671895
6673585
6673908
Interval (m)
10m
11m
2m
2.5m
Ag g/t
25
20
109
33
Pb%
0.25
0.80
4.90
0.50
Zn%
0.39
0.30
2.50
3.00
Pb+Zn%
0.64
1.20
7.40
3.60
Table 1. XRF channel surface gossan sampling results, EL 5015, SA.
Great
Gladstone
Big Hill
Figure 1. RTP Magnetic Imagery showing structural interpretation, zinc grade in rock chips and channel locations.
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Exploration to date
High‐grade silver‐lead‐zinc mineralisation within Tapley Hill Formation was historically mined 100
years ago at Yerelina in the northern Flinders Ranges. Whilst there remains clear evidence of
numerous historical workings and outcropping mineralisation that can be mapped in repetitious,
kilometre long vein sets over a very broad area, no systematic modern exploration has been
undertaken and the area has never been drill tested.
Core’s analysis of modern satellite imagery and the Company’s detailed heli‐borne magnetic and
radiometric survey data have identified that these workings are hosted by a large scale system of
repeated north/south regional structures. The Company identified that potential gossanous outcrop
and host structure could be seen in the landscape to both the north and the south of the historical
workings and multiple potential repeats of the known mineralised faults have been identified as
magnetic lows (Figure 2).
The Company then undertook a series of reconnaissance sampling and mapping programs at
Yerelina during 2012, 2013 and 2014 that identified extensions to the previously identified
mineralisation at historical workings.
Core’s mapping located and sampled 23 historical mining areas (shafts, drives and trenches) along
five separate mineralised faults. To date at total of 118 rock chip samples have been collected from
both in situ gossans and mullock heaps adjacent to historic workings (Figure 1). Core is excited by
the consistency of grade and scale of the mineralisation identified thus far at the project.
Figure 2. Representative channel sampling of Big Hill gossan material, EL 5105
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Future Work Program
The finely ground rock material from representative channel samples will be submitted for assay and
laboratory results are expecting in the next 3 weeks.
Further channel sampling results are expected form other shear zones as the current field work
progresses.
Reconnaissance and infill soil sampling is also underway at Yerelina to test for extensions of
currently known shears and discover additional mineralised shears with in the 8km x 2km
prospective area.
Core has also been recently awarded a grant of $75,000 as part of the SA Government’s PACE
Discovery Drilling 2015 program. The proposed PACE assisted drilling project comprises a total of six
angled diamond core holes (total of approx. 1000m) targeted under the known outcropping
mineralisation to better understand grade distribution, mineralisation potential and geological
controls.
Preparation for drilling at Yerelina including submission of a Program for Environmental
Management and Rehabilitation (PEPR) and Cultural Heritage Clearances has commenced to fast
track the project for drilling.
For further information please contact:
Stephen Biggins
Managing Director
Core Exploration Ltd
info@coreexploration.com.au
John Field
Field Public Relations
08 8234 9555
john@fieldpr.com.au
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
by Stephen Biggins (BSc(Hons)Geol, MBA) as Managing Director of Core Exploration Ltd who is a member of the
Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s codes and recommended
practices. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Biggins consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
This report also includes exploration information that was prepared and first disclosed by Core under the JORC Code 2004. It
has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially
changed since it was last reported. The information in all previous announcements has been compiled by Mr Stephen
Biggins as the Competent Person and who provided his consent for all previous announcements. The information that was
reported in announcements previously released under JORC Code 2004 is the announcement dated 19/03/2013 titled “High
Grade Lead‐Zinc‐Silver Assays from S.A. Project”
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Yerelina – May 2015– JORC 2012
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Rock samples collected as ground powder from channels cut using a
handheld diamond saw. Depth of cut ~2cm. Fine grained rock
material collected in a container behind the cutting disk and bagged.
Individual sampling over 0.5 and 1 metre intervals composited to one
reportable intersection across each outcropping gossan
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
Drilling
techniques
Drill sample
recovery
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘RC drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, RC, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Outcrop rock cuttings only
Outcrop rock cuttings only
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
JORC Code explanation
Commentary
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
Subsampling
techniques
and sample
preparation
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Various sample site parameters are recorded for each site including:
Terrain, Cover Characteristics, Presence of organics, soil type, lag
type, sub-crop type, and vegetation.
Rock chips photographed
See Sampling section above for a description of sampling and subsampling techniques.
Sample sizes are considered appropriate for the expected grainsize
of mineralisation.
Every twentieth sample collected for analysis was duplicated. A
certified standard was analysed in sequence every 25 analyses.
Subsampling techniques are undertaken in line with standard
operating practices in order to ensure no bias associated with subsampling.
The nature, quality and appropriateness of the sampling technique is
considered adequate for the type of mineralisation and confidence
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
JORC Code explanation
Commentary
level being attributed to this initial sampling.
Quality of
assay data
and
laboratory
tests
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Analysis was undertaking using Core Exploration’s Niton XL3t 950
GOLDD+ handheld XRF (SN:61847) in “SOIL” mode
Analysis was undertaken under controlled conditions using a Niton
Portable Stand and the analyser directly connected to a computer
The Niton has a new XRF tube and was calibrated by Portable
Analytical Solutions in March 2015
Analysis time was 90 seconds (30 seconds for each window)
No other calibration adjustments were made.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
the use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Samples were wrapped in a single layer of cling film for analyses and
standards when used were also wrapped in a single layer of cling
film. Only negligible attenuation was observed analysing standards
with or without the cling film wrap
Duplicates and a certified standard (Niton RCRApp which was
considered appropriate for silver and base-metals) were inserted in
sequence as detailed above.
9 samples have been submitted to Intertek Genalysis for check assay
using method 4AOM10 (ICP-OES and ICP-MS)
Primary data is captured directly into an in-house referential and
integrated database system designed and managed by the
Exploration Manager. All analysis data is cross-validated within the
database by various integrity scripts.
Analysis data is not adjusted.
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
Commentary
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques and data.
All coordinates are recorded in GDA 94 MGA Zone 53.
Surveys were undertaken by Core Exploration staff using a hand-held
GPS this tool has an accuracy of approximately 3m.
Initial reconnaissance outcrop sampling only.
Initial samples collected at 0.5 to 1m spacing across outcropping
gossans
Individual samples were composited using weighted average to
generate one composite result per traverse
Initial reconnaissance outcrop sampling only.
Samples are retained by the company for future reference and are
stored in CXO’s Adelaide office
No audits or reviews have been undertaken
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Yerelina is contained within EL 5015 that is 100% held by Sturt
Exploration Pty Ltd a wholly owned subsidiary of Core Exploration
Ltd.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration by other parties.
Geology
Deposit type, geological setting and style of mineralisation.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
Core Exploration manages EL 5015.
EL 5015 is located on Mt Freeling Station.
All drilling was undertaken outside of Heritage, Conservation or
National Parks on EL 5015.
Modern exploration is very limited in the Yerelina area however
extensive historical workings dating back to 1908 are evident as a
number of shafts and drives
The mineralisation style targeted is silver and base-metal veining
within an antiformal structure of Tapley Hill Formation
Initial reconnaissance outcrop sampling only.
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
JORC Code explanation
Commentary
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
A weighted average of individual 0.5 or 1 m samples was composited
to generate an average grade across each outcrop.
Initial reconnaissance outcrop sampling only.
See attached plans showing sample density.
All rock cutting analyses are reported
Exploration activity is very limited at Yerelina however CXO collected
heli-magnetic and radiometric data in 2012, undertook previous rockchip sampling of anomalous gossans / historical mullock piles and
submitted a limited number of samples for petrology.
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
Further work
JORC Code explanation
Commentary
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Subject to Board approval drilling may be undertaken
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
A Level 2, 143 Hutt St, Adelaide SA 5000 | T (08) 7324 2987 | F (08) 8312 2002 | E info@coreexploration.com.au
www.coreexploration.com.au
Share your feedback