14 October 2026
ASX: CXO Announcement
September Quarterly Activities Report
Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide its quarterly activities report for
the quarter ended 30 September 2026 (Quarter).
Highlights
• Core continued to execute at the Finniss Lithium Operation (Finniss) during the Quarter,
delivering several key commissioning, development and exploration milestones.
• First spodumene concentrate was produced, marking a major milestone in the staged
restart at Finniss, with plant commissioning and optimisation activities continuing and first
shipment on target for the December quarter.1
• First production followed the successful completion of targeted brownfields upgrades to the
processing plant, expected to increase throughput capacity by approximately 20% to 1.2
million tonnes per annum.2
• Underground development at BP33 advanced, supporting the planned delivery of first
development ore in mid-CY27.
• Extensional drilling at BP33 returned 34.08 m at 2.09% Li2O from 578.7 m in NMRD100,
providing further evidence of high-grade mineralisation beyond the current Mineral
Resource.3
• Completed sale of remaining ~25,000 tonnes of lithium fines to Glencore, bringing total
revenue from stockpile sales to approximately A$38.5 million in CY26.4
• Strong funding position with the receipt of Tranche 2 Convertible Note funds of US$44
million (~A$62 million) following FIRB approval, completing the funding package for
Finniss, which is fully funded through to steady-state production in 2028.5
• Cash balance of A$200 million at 30 September 2026 (30 June 2026: A$182 million).
1 Refer to ASX announcement “First Spodumene Concentrate Produced at Finniss” on 8 September 2026.
2 Refer to ASX announcement “FID Approved and Funding Secured for Finniss Restart” on 18 March 2026. Installation of the reflux classifier circuit, the final brownfields
upgrade, is expected to be completed in FY27.
3 Refer to ASX announcement “New High-Grade Lithium Drill Results at BP33” on 11 August 2026.
4 Refer to ASX announcement “Sale of Remaining Lithium Fines Stockpile” on 4 September 2026.
5 Refer to ASX announcement “Receipt of Tranche 2 Convertible Note Funds” on 4 August 2026.
corelithium.com.au
2
Commenting on the September Quarter 2026, Core Managing Director, Paul Brown, said:
“The September Quarter marked another significant milestone for Core, with first new spodumene concentrate
produced at Finniss less than six months after our Final Investment Decision. This achievement reflects the
disciplined execution of our team and the significant progress made across mining at Grants and the upgrade and
recommissioning of our processing plant.
“Development at BP33 continued in parallel and remains on schedule for delivery of first development ore in mid-
CY27. Our exploration program has delivered strong results at BP33, reinforcing the scale and growth potential
of the deposit and our confidence in the long-term opportunity at Finniss.
“During the Quarter, we also completed the monetisation of our lithium fines stockpile with a third sale to Glencore,
bringing total stockpile revenue generated from lithium stockpile sales in this calendar year to approximately
A$38.5 million. These sales have strengthened our liquidity and demonstrate our ability to generate cash from
existing inventory while ramping up operations.
“The receipt of our Tranche 2 Convertible Note funds in August, completed the funding package announced earlier
this year, leaving Finniss fully funded through to steady-state production in 2028. Importantly, this funding position
has been established before receipt of any cash flows from near term production at Grants.
“We enter the December quarter with strong momentum, a strong balance sheet and a clear path to sustained
production. Our focus remains on safe, reliable and disciplined execution as we progress toward first shipment
and continue advancing Finniss toward nameplate production.”
Operations
Mining
Open pit mining operations at Grants Open Pit (Grants) continued during the Quarter, with load and haul volumes
increasing to build ore stocks on the run of mine (ROM) pad during the quarter.
Figure 1 Mining activities at Grants
corelithium.com.au
3
Figure 2 Crusher ore stockpile with ROM pad in the background
Grants provides the near-term ore source for the Finniss processing plant and is expected to support initial product
sales and cash generation while development of the longer-life BP33 underground mine continues in parallel.
Processing
Core achieved a significant milestone in the staged restart of Finniss with the production of first spodumene
concentrate at Finniss from the upgraded dense media separation (DMS) processing plant. It follows the
recommencement of mining activities at Grants in May and the recommissioning of the crushing circuit in August
to establish sufficient crushed ore stockpiles for processing. First concentrate was produced on schedule and
within six months of the Final Investment Decision (FID).
The processing plant remains in the commissioning and optimisation phase. Prior to recommissioning, targeted
upgrades were completed to debottleneck the processing circuit, optimise recoveries, and support increased
throughput including:
• screen refurbishments;
• enhancements in the rolls crusher and tails thickener circuits;
• improvements to the ferrosilicon distribution system; and
• consolidation of crushing and DMS plant operations into a single control room.
These upgrades are expected to increase plant throughput capacity by approximately 20% to 1.2 million tonnes
per annum. Installation of the reflux classifier circuit is the final brownfields upgrade and is expected to be
completed in FY27. The reflux classifier is a long lead item with delivery scheduled for the March quarter of CY27.
In preparation, enabling works are progressing, including civil, structural and infrastructure modifications to
support installation and commissioning of the circuit. Upon installation, the reflux classifier is expected to further
enhance recoveries.
corelithium.com.au
4
Figure 3 Spodumene production
Figure 4 DMS plant brownfields modifications (Left to right) 1. Upgraded rolls crusher screen. 2. Reflux classifier
pad. 3. New middlings conveyor
corelithium.com.au
5
Development
BP33
Construction and underground development at BP33 continued to advance during the Quarter, with progress
made across key infrastructure and development workstreams.
Construction
Key construction activities during the Quarter at BP33 included:
• Progression of critical ventilation infrastructure works, with piling activities for the fresh air and return air
rises advancing.
• Significant advancement of site water management infrastructure, including construction of water storage
facilities, installation of water distribution pipelines and commissioning of operational water supply
systems.
• Completion of wet season preparedness works including erosion and sediment control infrastructure.
• Commencement of earthworks associated with the ROM pad.
• Completion of additional dust suppression infrastructure and associated pipeline installation.
• Completion and commissioning of key site infrastructure including offices, ablutions and contractor mobile
maintenance facilities.
• Mobilisation of civil contractor for intersection and access road upgrades.
Figure 5 Infrastructure works at BP33 (clockwise from top left) 1. Contractor laydown area with mobile
maintenance facility 2. Site offices 3. Completed mine water dam cells 4. Ventilation shafts development works
corelithium.com.au
6
Underground Development
Underground development at BP33 continued to progress during the Quarter, and key activities included:
• Completion of the underground portal construction, including steel headcover installation.
• Shotcreting of boxcut bench surfaces 50% complete.
• Installation and commissioning of:
o temporary mine power generators and transformer;
o mine services including HV cable, process water and dewatering; and
o temporary ventilation fan and ducting.
Figure 6 BP33 underground development progress, including box cut remediation, completed portal and
temporary ventilation fan
corelithium.com.au
7
Figure 7 BP33 site overview with ventilation shaft development including piling works in the foreground
Figure 8 BP33 underground decline development
corelithium.com.au
8
Sales and Marketing
Core completed the monetisation of its lithium fines stockpile during the Quarter, generating additional cash to
enhance financial flexibility during the operational ramp-up phase. The Company announced the sale of the final
portion of its lithium fines stockpile of approximately 25,000 tonnes to Glencore International AG (Glencore) at a
base price of ~US$285/t (~A$400/t) CIF, subject to customary adjustments6.This transaction completes the
monetisation of all existing lithium fines stockpiles, contributing to total stockpile sales revenue of approximately
A$38.5 million in 2026.
The established Finniss logistics chain continued to support the efficient transport and export of product via Darwin
Port. With the Finniss logistics chain fully recommissioned and operating as intended, Core is well positioned to
deliver its first shipment of newly produced spodumene concentrate in the December quarter.
Core continued to progress its offtake process during the Quarter, assessing proposals and strategic options to
leverage its unencumbered offtake position. The Company’s 5-year marketing agreement with Glencore provides
flexible arrangements for shipping and planning, customer referral provisions, and a structured and transparent
marketing framework, including the ability to strike offtake agreements directly and refer customers to Glencore7.
Exploration
Exploration expenditure during the Quarter (excluding tenement acquisition), was A$2.8 million across the BP33
and Blackbeard drilling programs. Diamond drilling advanced at both the BP33 extensional and Blackbeard
programs, with several rigs active across the two prospects.
BP33
Core reported excellent new high grade lithium results from extensional drilling at the BP33 project, strengthening
confidence in the quality and continuity of the orebody, while continuing to demonstrate the potential for
mineralisation beyond the current Mineral Resource.
The first exploration diamond drill hole (NMRD100) at BP33 intersected a wide high-grade zone of mineralised
pegmatite, including 34.08m @ 2.09% Li2O from 578.7m and 3.43m @ 2.44% Li2O from 616.54m. 8 NMRD100
was designed to target potential extensions to mineralisation outside the existing BP33 MRE identified in
NMRD085, which intersected 90.17m @ 1.80% Li2O from 568.83m.9
Drilling at BP33 is ongoing, with an additional three holes planned targeting extensions to mineralisation down dip
and along strike from NMRD085 and NMRD100.
BP33 hosts an existing Mineral Resource Estimate of 10.5Mt 1.53% Li2O, as well as a previously reported
Exploration Target of between 3.9Mt and 6.5Mt at a grade of between 1.5% and 1.6% Li2O10, located down-plunge
of the current MRE. Together, these highlight the scale of the mineralised system at BP33 and the potential for
continued growth beyond the current Resource base.
The Exploration Target is supported by historical drilling, trenching and exploration results. The potential quantity
and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a
Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
6 Refer to ASX announcement “Sale of Remaining Lithium Fines Stockpile” on 4 September 2026.
7 Refer to ASX announcement "FID Approved and Funding Secured for Finniss Restart” on 18 March 2026.
8 Refer to ASX announcement “New High-Grade Lithium Drill Results at BP33” on 11 August 2026.
9 Refer to ASX announcement “Exploration Update” on 25 January 2024.
10 Refer to ASX announcement "Updated Finniss Lithium Project Reserve and Resource” on 14 May 2025.
corelithium.com.au
9
Figure 9 Geological Cross Section – NMRD085 and NMRD100 at BP33 (left) and BP33 Resource and
Exploration Target outline (right)
Blackbeard
The Blackbeard exploration program continued during the period, designed to support a maiden Mineral Resource
Estimate and further assess its potential as a future source of high-grade ore feed for Finniss.
The staged and gated diamond-drilling campaign totaling 12,150 metres continued and is expected to be
completed in the December quarter. The Blackbeard Exploration Target is estimated at 7.0 to 10.0Mt at a grade
of 1.5% to 1.7% Li2O11, defined by ten existing RC holes drilled by Core, with a best previous intersection of 63m
1.67% Li2O in NRC26912. The potential quantity and grade of the Exploration Target is conceptual in nature. There
has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result
in the estimation of a Mineral Resource.
11 Refer to ASX announcement "Updated Finniss Lithium Project Reserve and Resource” on 14 May 2025.
12 Refer to ASX announcement “New High-grade Lithium Drill Results within 20km of Grants” on 6 November 2024.
corelithium.com.au
10
Figure 10 Drilling program underway at Blackbeard
Sustainability
Core remained focused on its people, safety and environmental responsibilities during the Quarter as mining and
development activities continued across Finniss.
The workforce build required for the operation of Finniss was completed during the Quarter, maintaining a strong
focus on local recruitment. Approximately 90% of Core's site-based workforce has either been recruited locally or
relocated to Darwin, reflecting the Company's local-first recruitment strategy.
During the Quarter, Core continued to advance its safety improvement initiatives as operations ramped up. Key
areas of focus included strengthening contractor mobilisation and assurance processes, enhancing emergency
management and health monitoring frameworks, and improving safety reporting and data integrity to support
operational decision-making and continuous improvement. Incident management protocols and site-based
emergency response capability remained in place across operational work fronts, supporting a proactive approach
to risk management and incident preparedness.
Water and land management remained a key focus during the Quarter as mining, construction and underground
development activities progressed at Grants and BP33, with routine environmental inspections, regulatory
monitoring and water quality programs completed in accordance with environmental approvals, resulting in no
material environmental incidents or exceedances being reported.
Corporate
Funding Package
During the Quarter, Core received Tranche 2 Convertible Note funding of US$44 million (~A$62 million), as part
of the Strategic Funding Package (Funding Package) following Foreign Investment Review Board (FIRB)
approval.13 FIRB approval satisfied the final outstanding condition to the funding package announced on 18
March 2026.14
The Tranche 2 Convertible Notes comprise US$44 million of the US$70 million total Convertible Note facility
provided by InfraVia CMF Invest S.a r.l and Glencore Australia Holdings Pty Limited.
13 Refer to ASX announcement “Receipt of Tranche 2 Convertible Note Funds” on 4 August 2026.
14 Refer to ASX announcement "FID Approved and Funding Secured for Finniss Restart” on 18 March 2026.
corelithium.com.au
11
With receipt of the Tranche 2 proceeds, the Funding Package (before costs) is now complete and comprises:
• A$120 million equity raising;
• US$70 million Convertible Note facility; and
• US$50 million senior secured debt facility, with only tranche 1 of US$25 million currently drawn.
The Convertible Note Tranche 2 proceeds are to be applied to BP33 underground development and targeted plant
and site upgrades, as previously disclosed. Finniss is now fully funded through to steady-state production in 2028.
Financial Position and Capital Management
Core ended the Quarter with A$199.7 million cash at bank (30 June 2026: A$181.8 million).
Cash flows reflect the transition to operations, with operating costs incurred ahead of cash receipts from
production. No revenue from Grants was recognised in the Quarter, with the first spodumene shipment and sales
revenue expected in the December quarter.
Cash flows were in line with expectations, noting the following:
• A$62.2 million (net of costs) was received from Tranche 2 of the Convertible Notes.
• A$35.7 million (net of costs) was received from Tranche 1 of the Senior Debt Facility drawdown.
• Non-recurring transaction costs of ~A$11.1 million, relating to advisor and financing fees associated with
securing the funding package.
• Proceeds of A$7.7 million from the second sale of stockpiled lithium fines and receipt of final adjustments
on the shipment made in the prior quarter.
• Finniss site capital works of A$50.8 million, primarily related to BP33 underground development and
supporting surface infrastructure works, DMS plant upgrade works and deferred stripping.
• Operating costs of related to Grants operation and corporate related expense of A$19.4 million.
• Exploration expenditure of A$2.8 million, primarily related to drilling programs at Blackbeard and BP33,
exploration salaries and tenement rents.
• Tenement acquisition cost relating to the Bynoe tenement of A$3.8 million.15
Divestment of Gold Exploration Assets – Axiant Resources
During the Quarter, the Company completed the divestment of its gold and non-lithium exploration assets to Axiant
Resources Limited (ASX:AXR) (Axiant).
On 2 September 2026, Axiant listed on the ASX following the completion of an A$8 million IPO (before costs). A
total of 40,000,000 shares were issued at A$0.20 per share, with A$6.4 million raised through the Priority Offer to
eligible Core shareholders.
The transaction marks the successful completion of Core’s strategic spinout of its non-lithium exploration assets
into a dedicated, independently funded gold-focused exploration company. Core retains significant exposure to
the divested assets through its 33% interest in Axiant, comprising 20 million ordinary shares with an additional 20
million performance rights linked to defined resource growth and share price milestones16. Both the shares and
performance rights held by Core are escrowed for 24 months.
The spinout enables Core to maintain its focus on the Finniss while retaining exposure to the gold sector through
its shareholding in Axiant.
15 Refer to ASX announcement "Finniss Exploration Program Commenced and Bynoe Tenement Acquired” on 19 June 2026.
16 Refer to ASX announcement "Axiant Lodges IPO Prospectus" on 16 July 2026.
corelithium.com.au
12
Board Changes
On 24 July 2026, the Company appointed Ms Anna Neuling as an independent Non-Executive Director and Chair
of Core’s Audit Committee. Ms Neuling has over 20 years of resources sector experience, including corporate
finance, governance, and commercial strategy. This appointment builds on Core’s Board and governance
capabilities as the Company continues to execute its operational and development plans and pursue future growth
opportunities at Finniss.
Mr Heath Hellewell retired from the Board on 31 July 2026 after nearly 12 years of service. Mr Hellewell was Chair
of the Company’s Nomination and Remuneration Committee since its establishment in December 2021. In
addition, he provided considerable guidance and strategic direction on the development of Core’s Mineral
Resource and Ore Reserves to support the BP33 underground development, as well as its broader exploration
portfolio. The Board thanks Mr Hellewell for his contribution to the Company over his long tenure.
Other disclosures
As at 30 September 2026, Core had the following capital structure
• 3,236,801,664 ordinary shares
• 32,912,688 unquoted performance rights
• 6,500,000 unquoted options
• 70,000,000 unquoted convertible notes
Core’s Appendix 5B includes an amount of A$184k in item 6.1. The amount in item 6.1 represents director fees
paid to entities nominated by the Company’s directors.
The BP33 Mineral Resource Estimate was reported in Core Lithium's ASX announcement titled “Mineral Resource
at BP33 increased to 89% Measured and Indicated” dated 16 October 2023. The BP33 MRE of 10.5Mt @ 1.53%
Li2O is comprised of 2.85Mt @ 1.44% Li2O Measured MRE, 6.51Mt @ 1.55% Li2O Indicated MRE and 1.14Mt @
1.59% Li2O Inferred MRE. Core confirms that it is not aware of any new information or data that materially affects
the exploration results, exploration targets, Mineral Resource Estimate (MRE) and Ore Reserve Estimate (ORE)
included in this announcement as cross referenced in the body of this announcement, and that all technical
parameters and material assumptions underpinning the MRE, ORE and production target and forecast financial
information derived from the production target continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original announcements.
Important Information
This announcement may reference forecasts, estimates, assumptions, and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
Webcast
The Company will host an accompanying webcast on 14 October 2026, commencing at 8:30am (AWST) /
11:30am (AEST).
To listen to the webcast presentation live, please click the link and register your details: Webcast Registration
A recording of the webcast will be available on the Company’s website www.corelithium.com.au following the
conclusion of the webcast.
corelithium.com.au
13
Tenements
Tenement number Tenement name Interest at the end
of Quarter
Changes during
the Quarter
South Australia
EL 6038 Mt Freeling 0% AXR
EL 6111 Yerelina 0% AXR
Northern Territory
EL 26848 Walanbanba 100% None
EL 28029 White Range East 0% AXR
EL 28136 Blueys 0% AXR
EL 29580 Jervois East 0% AXR
EL 29581 Jervois West 0% AXR
EL 29698 Finniss 100% None
EL 29699 Bynoe 100% None
EL 30012 Bynoe 100% None
EL 30015 Bynoe 100% None
EL30897 Bynoe 100% CHR
EL 31058 Barrow Creek 100% None
EL 31126 Zola 100% None
EL 31127 Ringwood 100% None
EL 31139 Anningie West 100% None
EL 31140 Anningie South 100% None
EL 31145 Barrow Creek North 100% None
EL 31146 Barrow Creek South 100% None
EL 31271 Bynoe 100% None
EL 31279 Sand Palms 100% None
EL 31407 Shoobridge 0% AXR – Lithium rights retained
EL 31886 Adelaide River 0% AXR
EL 32205 Finniss Range 100% None
EL 32392 Ivy 100% None
EL 32396 Murray Creek 100% None
EL 33932 Bloodwood 100% None
EL 33933 West Dam 100% None
EL 34075 Douglas 0% AXR – Lithium rights retained
.
corelithium.com.au
14
Tenements(cont.)
Tenement number Tenement name Interest at the end
of Quarter
Changes during
the Quarter
Northern Territory
EMP 28651 Observation Hill (Extractive Lease) 100% None
ML 29912 Saffums 100% None
ML 29914 Labelle 100% None
ML 29985 Angers North 100% None
ML 31654 Annie/Old Crusher 100% None
ML 31726 Grants Mineral Lease 100% None
ML 32074 Observation Hill (Ancillary Lease) 100% None
ML 32278 Grants Dam (Ancillary Lease) 100% None
ML 32346 BP33 Mineral Lease 100% None
MLN16 Bynoe 100% None
MLN813 Bilatos 100% None
MLN1148 Centurian 100% None
Note: “AXR” denotes tenements transferred to Axiant Resources Limited (ASX: AXR) as part of the spin-out of Core’s assets to Axiant and
no longer form part of Core’s tenement holdings. Where applicable, Core has retained lithium rights as indicated in the tenement listing.
“CHR” denotes the Charger Metals NL (ASX:CHR) tenement acquired during the Quarter. The tenement now forms part of Core's tenement
holdings and is included in the tenement listing above.
This announcement has been approved for release by the Core Lithium Board.
For further information, please contact:
Investor enquiries
Paul Brown
Managing Director
Core Lithium Ltd
+61 8 8317 1700
info@corelithium.com.au
Media enquiries
Cameron Morse
Senior Managing Director
FTI Consulting
+61 433 886 871
cameron.morse@fticonsulting.com
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au.
corelithium.com.au
15
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Core Lithium Ltd
ABN
Quarter ended (“current quarter”)
80 146 287 809 30 September 2026
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers 7,734 7,734
1.2 Payments for
exploration & evaluation - -
development - -
production (11,675) (11,675)
staff costs (5,313) (5,313)
administration and corporate costs (3,357) (3,357)
royalties (784) (784)
1.3 Dividends received (see note 3) - -
1.4 Interest received 2,226 2,226
1.5 Interest and other costs of finance paid (133) (133)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(11,302) (11,302)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
entities - -
tenements (3,753) (3,753)
property, plant and equipment (229) (229)
exploration & evaluation (2,832) (2,832)
investments - -
other non-current assets - mine
development
(50,535) (50,535)
2.2 Proceeds from the disposal of:
entities - -
tenements - -
property, plant and equipment - -
investments - -
other non-current assets - -
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3) - -
2.5 Other - Net (payments) for security bond (36) (36)
2.6 Net cash from / (used in) investing
activities
(57,385) (57,385)
corelithium.com.au
16
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
- -
3.2 Proceeds from issue of convertible debt
securities
97,903 97,903
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(11,082) (11,082)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other - payment of lease liabilities (347) (347)
3.10 Net cash from / (used in) financing
activities
86,474 86,474
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
181,827 181,827
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(11,302) (11,302)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(57,385) (57,385)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
86,474 86,474
4.5 Effect of movement in exchange rates on
cash held
69 69
4.6 Cash and cash equivalents at end of
period
199,683 199,683
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 199,683 181,827
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
199,683 181,827
corelithium.com.au
17
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
184
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a
description of, and an explanation for, such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the
entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 70,223 35,111
7.2 Credit standby arrangements - -
7.3 Other (convertible note) 99,824 99,824
7.4 Total financing facilities 170,047 134,935
7.5 Unused financing facilities available at quarter end 35,112
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
1. Core has issued 6-year convertible notes for A$99 million before costs (Convertible
Note). Tranche 2 of the Convertible Notes was issued during the quarter and
recognised in 7.3.
2. Core has a 4-year senior secured loan facility of A$71