Summary
•
Grants Reserve increased by 100% to 1.15 million tonnes (Mt) with a move to underground
mining to access greater material and reduce costs
•
When combined with the updated BP33 Ore Reserve, the total Finniss Ore Reserves now
increase to 10.73Mt @ 1.29% Li2O
•
The Ore Reserve represents the first 10 years of the Restart Study1 mine plan
Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide an update to the Mineral Resources
Estimate and Ore Reserves at its wholly owned Finniss Lithium Project (Finniss, Project or Operation) in the
Northern Territory. Finniss is located within the Bynoe Pegmatite Field and is ~88km by road from the Darwin Port
(Figure 1).
The updated Finniss Ore Reserve is the culmination of study work undertaken alongside the Restart Study (Study)1.
The Ore Reserve Estimate and related assumptions were developed and supported by various independent
consultants in conjunction with Core’s Competent Persons.
Commenting on the updated Ore Reserve, Core CEO Paul Brown said:
"The updated Ore Reserve reflects the revised operating strategy adopted in the Study and underpins the first ten
years of production at Finniss. Together with identified exploration targets, it supports the potential for a longer mine
life and highlights the significant resource across our broader tenement package.”
1 Refer to ASX announcement "Finniss Repositioned as a Highly Attractive Low-Cost Operation with a 20-Year Life“ on 14 May 2025
corelithium.com.au
Figure 1
Location of Grants and BP33 relative to Core’s existing processing plant
Tenements and Ownership
The Finniss Lithium Project covers an area of over 500km2. It is made up of a number of Exploration Licences (ELs)
and Mining Leases (MLs) including: EL29698, EL29699, EL30012, EL30015, EL31126, EL31127, EL31271,
EL31279, EL32205, ML29912, ML29914, ML29985, ML31654, ML31726, ML32074, ML32278, ML32346, MLN16,
MLN813 and MLN1148. All ELs and MLs are 100% owned by Core Lithium.
Mineral Resources
The overall Project Mineral Resource Estimates have increased by 0.6% to 48.5Mt @ 1.26% Li2O (Table 1). There
has been no change to the In Situ Mineral Resource, however the overall Project Mineral Resource now includes
an additional 310kt @ 0.66% Li2O estimated for the Mineralised Material within the Tailings Storage Facility (TSF)
and coarse rejects stockpiles located throughout the Operation. This material has been classified as an Indicated
Mineral Resource. These additional Mineral Resources are based on estimated tonnages and grades determined
from production records.
corelithium.com.au
2
Table 1 Finniss Project Mineral Resources
Resource Category2
Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Measured
6.3
1.41
89
Indicated
21.9
1.29
283
Inferred
20.3
1.18
239
Total
48.5
1.26
610
Ore Reserves
The overall Project Ore Reserve has increased by 15.9% with an 8.4% increase in contained metal. The BP33
Ore Reserve has increased by 7.0% from 8.7Mt to 9.29Mt as a result of the updated modifying factors. Grants
Ore Reserve has increased from 0.57Mt to 1.15Mt by changing to an underground mining method from an open
pit.
Proved and Probable Ore Reserves were estimated for the Grants and BP33 underground deposits. Measured
Mineral Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were converted to
Probable Ore Reserves with the application of modifying factors. The effective date of the Ore Reserves is 30
April 2025.
Table 2 Ore Reserve Estimate including contained metal
Deposit3
BP33 Underground
Grants Underground
TSF/Stockpiles
Total
1.
2.
3.
4.
5.
6.
7.
8.
Category
Ore Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Proved
2.55
1.27
32.4
Probable
6.74
1.32
88.8
Total
9.29
1.31
121.2
Proved
0.87
1.29
11.2
Probable
0.28
1.36
3.8
Total
1.15
1.31
15.1
Proved
-
-
-
Probable
0.28
0.68
1.9
Total
0.28
0.68
1.9
Proved
3.42
1.28
43.6
Probable
7.30
1.3
94.6
Total
10.73
1.29
138.2
Effective date of the Ore Reserves is 30 April 2025.
Ore Reserves are the total for the Grants, BP33 Mines and the Mineralised Material within the TSF/Stockpiles.
The long-term Spodumene price used for calculating the financial analysis is US$1,330/t. The analysis has been
estimated with assumptions for crushing, processing and treatment charges, deductions and payment terms,
concentrate transport, metallurgical recoveries, and royalties.
The breakeven Net Smelter Return (NSR) cut-off for underground mining is $110/t.
Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated Mineral Resources were used to
estimate Probable Ore Reserves.
Tonnage and grade estimates include dilution and recovery allowances.
The Ore Reserves reported above are not additive to the Mineral Resources.
Totals within this table are subject to rounding.
2. The In Situ mineral resource was announced as “Finniss Mineral Resource Increased by 58%” on 11 April 2024 and included an indicated MRE of 21.6Mt @
1.30% Li2O.
3. The previous ORE was announced as “Lithium Ore Reserve Update” on 25 September 2024 and included a BP33 ORE of 2.43Mt @ 1.33% Li2O Proved
ORE and 6.25Mt @ 1.40% Li2O Probable ORE.
corelithium.com.au
3
Insufficient work has been completed at Carlton to report an Ore Reserve. Core has commenced further study
work capturing the outcomes from the Grants and BP33 Ore Reserves and the Study.
Core will be targeting an updated Ore Reserve for Carlton however there is no certainty this work will result in the
reporting of an Ore Reserve for Carlton.
Further commentary on the updated Ore Reserve Estimate is provided in the Supporting Information Section
below, followed by the required JORC Table 1.
Exploration Target
Core has defined an Exploration Target of 10.9 to 16.5Mt at a grade of between 1.5 and 1.7% Li2O across two
different deposits. Exploration Targets have been defined at the existing BP33 Mineral Resource (ML32346) and
at the Blackbeard deposit within MLN1148 (Figure 1).
Cautionary Statement: The potential quantity and grade of the Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
The new Exploration Target is in addition to the Mineral Resource Estimate of 48.5Mt @ 1.26% Li2O already
defined by Core at Finniss and is summarised in Table 3.
Drilling to test the Exploration Targets will be undertaken as soon as is practicable. Planning has already
commenced to test Blackbeard as shown in Figure 3.
Table 3 Exploration Target
Exploration Target
Tonnage (Mt)
Li2O (%)
Low
High
Low
High
Blackbeard
7.0
10.0
1.5
1.7
BP33
3.9
10.9
6.5
16.5
1.5
1.5
1.6
1.7
Total
The Exploration Target has been determined after a review of existing exploration results and consideration of the
outcomes of the Study. Details for the Exploration Target defined at each deposit is outlined below.
Blackbeard
The target at the Blackbeard prospect is defined by 10 existing RC holes drilled by Core. The best intersection of
63m @ 1.67% Li2O in NRC2694 provides encouragement that a large mineralised system may be present. Drilling
has indicated that a continuous pegmatite body exists with a strike length of approximately 320m and a subvertical
dip (Figure 2). The Blackbeard pegmatite is located 20km from BP33 and has many similarities including size, dip
and high-grade potential.
An Exploration Target for Blackbeard has been determined by extrapolating a shape around the known drilling
results to a depth of approximately 800m below surface (Figure 3). This depth is similar to the depth extent of the
current BP33 Mineral Resource and is therefore considered reasonable. The drilling to date at Blackbeard has
indicated that there may be some significant zonation of lower and higher-grade material. Using the exploration
drilling results it is therefore possible to define an Exploration Target. This high-grade pegmatite zone is estimated
to have a strike extent of 170m and a true thickness variation of between 20 to 30m. Applying an average specific
gravity of 2.72gm/cm3 (typical for higher grade pegmatite) results in a tonnage estimate of 7 to 10Mt. The average
grade for the known assay results from the high-grade intersections is 1.63% Li2O and based on this a grade
range for the Exploration Target is estimated to be between 1.5 and 1.7% Li2O.
4. Refer to ASX announcement “New high-grade Lithium drill results within 20km of the Grants processing facility” on 6 November 2024
corelithium.com.au
4
Figure 2
Blackbeard cross section showing geological continuity of drilling intersections.
Figure 3 Blackbeard Exploration Target defined based on previous Core drillholes5 (white) with planned drillholes
(yellow) also shown.
5. Refer to ASX announcement “Significant Increase to Finniss Mineral Resources” on 18 April 2023 and “New high-grade Lithium drill results within 20km of the
Grants processing facility” on 6 November 2024
corelithium.com.au
5
BP33
There is an existing Mineral Resource at BP33 of 10.5Mt @ 1.53% Li2O6 that remains open at depth. Based on
the outcomes of the current Study, it is likely that mining operations could extend below the current limits of the
Mineral Resource. Therefore, an Exploration Target has been defined down plunge of the current Mineral
Resource (Figure 4).
A shape has been defined that is extrapolated from the base of the current Mineral Resource down to a vertical
depth of approximately 1,200m below surface (Figure 4). This is considered to be a reasonable assumption based
on current mining cost estimates associated with the Study. Variations in the average thickness at depth of the
known Mineral Resource of between 15 to 25m true width, together with an average specific gravity of 2.72 g/cm3
(well understood for BP33) results in a tonnage range estimate of 3.9 to 6.5 Mt. The average grade for BP33 is
1.53% Li2O and based on this a grade range for the Exploration Target is estimated to be between 1.5 and 1.6%
Li2O.
Figure 4
BP33 long section showing the Exploration Target with some previous deeper drilling results6.
6. Refer to ASX announcement “Mineral Resource at BP33 increased to 89% Measured and Indicated” on 16 October 2023. The BP33 Mineral Resource
Estimate (MRE) of 10.5Mt at 1.53% Li2O was first reported on 16 October 2023. The BP33 MRE is comprised of 2.85Mt at 1.44% Li2O Measured MRE, 6.51Mt
at 1.55% Li2O Indicated MRE and 1.14Mt at 1.59% Li2O Inferred MRE.
corelithium.com.au
6
This announcement has been approved for release by the Core Lithium Board.
For further information, please contact:
Investor Enquiries
Media enquiries
Paul Brown
Michael Vaughan
CEO
Executive Director
Core Lithium Ltd
Fivemark Partners
+61 8 8317 1700
+61 422 602 720
info@corelithium.com.au
michael.vaughan@fivemark.com.au
About Core Lithium
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards. For further information
about Core and its projects, visit www.corelithium.com.au
Important Information
This announcement may reference forecasts, estimates, assumptions and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
Competent Person Statements
The Mineral Resources and Ore Reserves underpinning the production target and forecast financial information
in this announcement have been prepared by competent persons in accordance with the requirements of the
JORC code.
The information in this release that relates to the Estimation and Reporting of Mineral Resources and the reporting
of Exploration Targets for BP33 and Blackbeard has been compiled by Dr Graeme McDonald. Dr McDonald is the
Resource Manager for Core Lithium Ltd. Dr McDonald is a member of the Australasian Institute of Mining and
Metallurgy and the Australian Institute of Geoscientists. He has sufficient experience with the style of
mineralisation, deposit type under consideration and to the activities undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (The JORC Code). Dr McDonald consents to the inclusion in this report of the contained
technical information relating to the Mineral Resource Estimation and Exploration Targets in the form and context
in which it appears.
The information in this release that relates to the Estimation and Reporting of Ore Reserves is based on, and
fairly represents, information and supporting documents compiled by Mr Tom Joseph employed as Principal
Mining Engineer by Core Lithium and who is a Member of the Australasian Institute of Mining and Metallurgy. Tom
Joseph is a Competent Person as defined by the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”, having more than five years’ experience that is
relevant to the style of mineralisation and type of deposit. Mr Tom Joseph consents to the inclusion in the Public
Report of the matters based on their information in the form and context in which it appears.
Core confirms that it is not aware of any new information or data that materially affects the results included in this
announcement as cross referenced in the body of this announcement and that all technical parameters
underpinning the Mineral Resources and Ore Reserves continue to apply and have not materially changed except
as reported within this release. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original announcements related to previously
reported exploration results, Ore Reserves and Mineral Resources. The announcement references the Mineral
Resource and Ore Reserves update as at 30 April 2025.
corelithium.com.au
7
SUPPORTING INFORMATION
MINERAL RESOURCE
There has been no change to the In Situ Mineral Resources. The Project Mineral Resources now includes an
additional 310kt @ 0.66% Li2O reported for the Mineralised Material within the Tailings Storage Facility (TSF) and
coarse reject stockpiles located throughout the Operation. These additional Mineral Resources are based on
estimated tonnages and grades determined from production records.
During operation the process plant was DMS only with all crushed ore -0.6mm in sizing considered untreatable
and sent to the TSF. This size fraction of material will be recoverable through the upgraded plant which will
incorporate a gravity circuit designed to process -0.6mm material. The TSF material is free draining in nature due
to being generated via crushing and it has been demonstrated that it can be successfully mined using truck and
excavation approach.
The DMS plant coarse rejects were co-deposited into the mine waste dump until mining ceased, from which point
all DMS rejects were stockpiled separately. The rejects stockpiled separately are available for reclaim.
As the deposit is a TSF, deposition of the material was via pipes and pumps in slurry form. While some form of
gravity separation is likely, deposition typically occurred layer over layer until the TSF was full. While no drilling
has been undertaken the following is noted:
▪
▪
▪
▪
▪
▪
Comprehensive belt sampling of the tail and reject material was undertaken within the plant, typically on
an hourly basis. This sampling was undertaken via systematic industry-standard methods across the
belt and assayed in a laboratory using standard techniques. In addition to Li2O content, moisture
content was also determined.
Tonnages were determined via the belt weightometers within the plant. These recorded tonnages then
accounted for the determined moisture to determine dry metric tonnages.
These sampling and tonnage results were reconciled monthly against feed tonnages and products to
determine the final average monthly tails tonnages and grade delivered to the TSF.
Sampling was undertaken ahead of the mining and sale of 66Kt @ 1.3 % Li2O of product. This grade is
consistent with the deposition method of the material.
Testing has demonstrated that the upgraded DMS plant will be able to recover additional spodumene
from the coarse reject and TSF material. All material is planned to be processed through the DMS and
gravity separation circuit to produce saleable concentrate.
Furthermore, given the mining method will not likely be able to separate the material in ore/waste, no
Li2O cut-off grade is applied to Mineral Resource estimates for the TSFs and various stockpiles.
While variability is known to occur within the TSF and stockpiles, given that historical production shows that a
saleable product was previously able to be produced, the CP is of the opinion that the TSF material is of suitable
quality to be reported and classified as a Mineral Resource. Furthermore, the tonnages and grades were
determined from comprehensive datasets which were reconciled monthly via plant mass balance. This provides
good confidence in the estimates resulting in being classified as Indicated.
corelithium.com.au
8
ORE RESERVES
The following is a summary of the Grants and BP33 combined case assumptions that underpin the Ore Reserves.
This is an update to the previously reported Ore Reserve on 25 September 2024.
Proved and Probable Ore Reserves were estimated for the Grants and BP33 underground deposits. Measured
Mineral Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were converted to
Probable Ore Reserves with the application of modifying factors. The effective date of the Ore Reserves is 30
April 2025.
Ore Reserves were re-estimated with inputs including updated mine design, all modifying factors, processing
flowsheet and recoveries, and physical constraints. The accuracy and confidence of the inputs are, as a minimum,
to a Pre-Feasibility level. To enable Ore Reserves to be estimated, the CP has:
▪
▪
▪
▪
▪
▪
▪
Identified any physical constraints to mining, for example, tenement boundaries, infrastructure,
protected zones (flora, rivers, roads, and road easements).
Completed mine planning studies, including the operating and capital cost forecasts for LOM based on
Measured and Indicated Mineral Resources only.
Reviewed information on historical and previous mine performance, including operating costs and
processing recoveries.
Updated the mining method and LOM designs and associated study documents, including geotechnical,
hydrological, ventilation, and processing assumptions.
Verified LOM operating and capital costs.
Completed LOM plans based on the mine sequencing.
Compiled an economic model based on the LOM schedule, which included Measured and Indicated
Mineral Resources only.
In addition the CP has determined that the:
▪
Mining method selected for BP33 is LHOS (Long Hole Open stoping) with paste filling as leaving big
pillars otherwise will reduce the value of the mine due to the width of the orebody.
▪
Mining Method selected for Grants is LHOS with pillars to reduce the cost as the pillars to leave behind
are small due to the reduced width of the orebody compared to BP33.
▪
Processing method selected is DMS and gravity. The recovery factors varied based on the feed grade
and staged improvements in the plant. The allowances for mica and phyllite is in line with the staged
improvements in the plant.
▪
Cut-off Grade (COG) was based on the mining cost, processing cost, transport cost, tax, royalty and
G&A cost.
▪
All key approvals and licences are in place to support the restart of operations at Finniss, additional
variations to the Mining Management Plan for Grants are required to reflect the revised underground
mining methods and minor surface infrastructure changes.
▪
TSF material shows a saleable product can be produced and has been sold in the past. The CP is of
the opinion that the Mineralised Material within the TSF/stockpile is of suitable quality to be reported
and classified as a Mineral Resource. Furthermore, the tonnages and grades were determined from
comprehensive datasets which were reconciled monthly via plant mass balance. This provides good
confidence in the estimates resulting in being classified as a Probable Reserve.
corelithium.com.au
9
GEOTECHNICAL
The geotechnical information used to support the underground mine designs that constrain the Ore Reserve
estimate has come from additional geotechnical work completed during 2024 and 2025. The geotechnical model
was developed utilising the extensive resource database, pre-feasibility level geotechnical data and the
geotechnical data derived from field and laboratory investigations.
MINING
Initial ore will be sourced from the Grants Underground Mine. This will be supplemented and then replaced by ore
from BP33 as underground production ramps up. Based on deposit geometry, underground mining is considered
appropriate for the Grants deposit. The Grants deposit will be mined by industry standard long hole open stoping
with pillars.
The BP33 deposit will be mined by long hole open stoping with paste backfill. The orebody width, vertical
orientation, and competent host rock ground conditions support this as a suitable mining method.
PROCESSING
The process design selection for the Ore Reserves case was based on metallurgical test work, analysis and
modelling completed during FY24 and FY25. For the Ore Reserves case, an overall plant recovery ranges
between 75% and 80% using an optimised process flowsheet to produce a blended saleable product. Feed is
provided to the backfill plant using DMS tails to produce paste for BP33 mine fill.
The process design concept is based on the existing processing facility capacity, namely a 1.0 million tonnes per
annum (dry, undiluted) plant feed tonnes which is planned to be upgraded to 1.2 million tonnes per annum. It is
comprised of the existing crushing circuit and DMS plant with various reconfigurations.
Concentrate is transported to the Darwin Port where it is shipped to customers.
INFRASTRUCTURE
Infrastructure and services to support the earlier Grants open pit mining and processing and the initial
underground mine development at BP33 were in place at the time of suspension of operations in 2024. Principal
infrastructure items to be put in place to support the Project restart have been considered in the capital estimate
and development schedule:
▪
▪
▪
▪
▪
▪
Backfill paste plant to support BP33 underground mining
BP33 box cut, portal and decline
Grants Portal and decline
Ventilation system
Dewatering system
Mine surface and underground infrastructure
corelithium.com.au
10
COSTS
Costs have been calculated for a 1.2 Mtpa mining rate for BP33 underground deposit. The capital and operating
costs were estimated by independent consultants and derived from quotations from experienced contractors,
current contracts, other suppliers, and current project costs.
Finniss has an initial project capital cost of $175-200 million, that includes the Grants restart capital, BP33 mining
and infrastructure capital and processing upgrade capital and capitalised operating cost prior to restart. Owners
Costs and G&A costs were prepared by Core and benchmarked against similar operations.
Finniss operating unit costs:
▪
▪
▪
Underground Mining: $63-72 /t Ore
Finniss Processing and Tailings: $40-46 /t Ore
Finniss G&A: $9-10 /t Ore
REVENUE
Consensus pricing forecasts and project benchmarking was sourced and reviewed by independent consultants in
real terms for a 6.0% spodumene concentrate. A grade adjustment is assumed for saleable product above 5.0%
spodumene concentrate. Revenue was calculated as the In Situ value after allowances have been made for:
▪
▪
▪
▪
Recovery to concentrate
Concentrate transport
Taxes and Royalties
Gross revenue assumes 100% of Spodumene sales in line with the current offtake agreement
APPROVALS
While all key approvals and licences are in place to support the restart of operations at Finniss, additional
variations to the Mining Management Plan for Grants are required to reflect the revised underground mining
methods and minor surface infrastructure changes. Core expects the regulatory approvals will be in place when
required for the restart.
corelithium.com.au
11
The JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code Explanation
Commentary
• Nature and quality of sampling
(e.g. cut channels, random chips,
or specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as downhole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
presentively and the appropriate
calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases, more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation
types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
• Drilling geology, assays and In Situ resource
estimation results reported herein relate to
reverse circulation (RC) and diamond drilling
(DDH) undertaken by Core and Liontown
Resource (LTR) over the period late 2016 to
late 2023 (refer to “Drill hole information”
section below).
• RC drill spoils over all programs were
collected into two sub-samples:
• 1 metre split sample homogenised, and
cone split at the cyclone into 12x18 inch
calico bags. Weighing 2-5 kg, or 15% of the
original sample.
• 20-40 kg primary sample, which for CXO’s
drilling was collected in 600x900mm green
plastic bags and retained until assays had
been returned and deemed reliable for
reporting purposes. In the case of LTR’s
drilling, this primary sample was laid out
directly on the ground in rows, without using
a green bag.
• RC sampling of pegmatite for CXO assaying
was done on a 1 metre basis. Sampling
continued for up to 4m into the surrounding
barren host rock.
• LTR’s RC samples were homogenised by
riffle splitting prior to sampling and then
assayed as 2m composites (collected via a
scoop from the sample piles) with 2-3kg
submitted for assay. If a composite sample
returned a significant result (typically >0.5%
Li2O) then the original individual metre
intervals were also submitted for assay.
• Drill core was collected directly into trays,
marked up by metre marks and secured as
the drilling progressed. Geological logging
and sample interval selection took place
soon after.
• DDH Core was transported to a local core
preparation facility where geological logging
and sample interval selection took place.
Core was cut into half longitudinally along a
consistent line between 0.3m and 1m in
length, ensuring no bias in the cutting plane.
• DDH sampling of pegmatite for assays is
done over the sub-1m intervals described
above. 1m-sampling continued into the
barren phyllite host rock.
• Sampling was routinely and regularly
undertaken at various points during the
mineral processing phase of the operation.
• RC Drilling was carried out with 5-to-5.5-inch
face-sampling bit.
• Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
corelithium.com.au
12
Drill sample
recovery
•
•
•
Logging
•
•
•
sonic, etc.) and details (e.g. core
• DDH drilling used a triple tube HQ
diameter, triple or standard tube,
technique. Core was oriented using a Reflex
depth of diamond tails, faceHQ core orientation tool.
sampling bit or other type, whether • Diamond Core Drilling (DDH) was
core is oriented and if so, by what
undertaken using standard HQ core
method, etc.).
assembly (triple tube), drilling muds or water
as required, and a wireline setup. Holes
were either cored from surface or precollared by mud rotary down to rigid bedrock
(~65m) or by RC down to a depth just above
the target pegmatite.
Method of recording and assessing • RC drill recoveries were visually estimated
core and chip sample recoveries
from volume of sample recovered. Most
and results assessed.
sample recoveries reported were dry and
above 90% of the expected.
Measures taken to maximise
sample recovery and ensure the
• RC samples were visually checked for
representative nature of the
recovery, moisture and contamination and
samples.
notes made in the logs.
Whether a relationship exists
• The rigs splitter was emptied between 1m
between sample recovery and
samples. A gate mechanism on the cyclone
grade and whether sample bi
Share your feedback
Discover