14 May 2025
ASX: CXO Announcement
Finniss Repositioned as a Highly Attractive
Low-Cost Operation with a 20-Year Life
Highlights
Lean, Long Life, Underground Operations
•
•
•
The Restart Study (Study) confirms the potential for an attractive 20-year mine life
High confidence production plan with 94% of the first 10 years backed by Ore Reserves1
Underground mining capitalises on the high-grade, continuous and steeply dipping orebodies
that are open at depth
Highly attractive Cost Structure and Productivity Gains
•
•
•
•
Mining costs reduced by 40%2 to $63–$72/t2 (from $120/t2)
Processing costs cut by 33%2 to $40–$46/t2 (from $69/t2)
Unit operating costs of $690–$785/t2 (FOB, SC6 eq ex-royalties), placing Finniss among the
most competitive global spodumene operations
Concentrate production lifted 7%2 to ~205ktpa SC6 equivalent
Plant Optimisation Without Major Capital
•
•
•
Flowsheet simplified and debottlenecked delivers 20%2 throughput uplift
Global recoveries increase to an average of 78%, producing a high quality, coarse-grained
concentrate
Processing plant and infrastructure transitioning to 100% Core-owned, allowing full
operational control
Lower Pre-Production Capital and Stronger Economics
•
•
Pre-production capex reduced by 29%2 to $175–$200M (from $282M2)
Free cash flow of $1.2 billion3 highlights the strength of the reconfigured operation
Strategic Funding Process Underway
•
•
Morgan Stanley Australia Limited appointed as corporate advisor to lead funding strategy,
with a focus on minimising dilution for shareholders.
A Final Investment Decision (FID) remains subject to Board approval, contingent on market
conditions and securing a suitable funding pathway
1. Refer to ASX Announcement “Updated Finniss Lithium Project Ore Reserve and Mineral Resource Estimate” on 14 May 2025
2. Percentage changes are with reference to amounts disclosed in the 2024 Lithium Ore Reserve Update. Refer to ASX announcement "Lithium Ore Reserve
Update" on 25 September 2024. The range disclosed above is inclusive of relevant contingency.
3. Based on consensus with a long-term SC6 price of USD 1,330/t CIF and an exchange rate of AUD/USD $0.70.
corelithium.com.au
Core Lithium Ltd (ASX:CXO) (Core or Company) is pleased to present the outcomes of the Study for its Finniss
Lithium Operation (Finniss, Project or Operation) located near Darwin in the Northern Territory (NT). This
announcement contains a short overview of the Study outcomes followed by a technical summary.
Core Lithium’s Chief Executive Officer, Paul Brown, commented:
“Our team has always believed in the opportunity at Finniss, and I’m pleased to share the Restart Study with the
market today.
The plan we’ve outlined capitalises on the Project’s strengths, including established infrastructure, high-grade ore
bodies well-suited to low-cost underground mining and a process plant with proven recoveries and further scope
for optimisation.
We’ve undertaken a rigorous, bottom-up review of every aspect of the operation. The Study brings together our
operating experience to deliver a plan that is more robust, more efficient and built for the long term.
At BP33, we are developing a large-scale underground mine. Grants will shift to underground mining, cutting costs
and doubling its mine life. Carlton will use Grants’ surface infrastructure, supporting a 20 year mine life. Blackbeard
offers further potential to extend mine life and expand operations.
Our plant upgrades will improve recovery and reduce contaminants, whilst keeping capital costs low. These
improvements include enhanced screening, with more affordable crushing and the addition of a gravity circuit.
This resets Finniss as a more resilient operation to price volatility, and will be a reliable source of high-quality,
coarse-grained spodumene concentrate. The Study outlines a lower-cost, longer-life, and scalable operating plan
that generates free cash flow of $1.2 billion, representing a six-fold return on pre-production capital.
Core has identified a range of opportunities and is considering multiple funding pathways. Our focus is to secure
an option that minimises dilution and maximises value for shareholders.
Finniss remains an important project for the Northern Territory. While no restart decision has been made, there is
the potential to create several hundred jobs, many of which would be residential. We’ve had strong support from
the NT Government and look forward to continuing that collaboration.
Finally, I want to thank the Core team and our consultants. This is a substantial piece of work, and the quality of
the Study reflects the deep experience and capability of everyone involved.”
corelithium.com.au
2
Cautionary Statement
The Study includes the Grants, BP33, and Carlton deposits, to produce a mine plan and resultant financial
evaluation, including the Measured, Indicated, and Inferred Mineral Resources.
The Study includes two levels of accuracy based on the underlying Mineral Resource classification, which include:
▪
Pre-Feasibility Study – The Grants and BP33 Measured and Indicated quantities are considered to be
at least to a PFS level of accuracy as defined by the JORC Code.
▪
Scoping Study – The Inferred portion of BP33, the Carlton mining study and processing inputs for these
are considered to be at least to a Scoping Study level of accuracy as defined by the JORC Code.
The Scoping Study referred to in this announcement has been undertaken to analyse the economic outcomes of
mining Carlton in conjunction with the BP33 and Grants deposits. It is a preliminary technical and economic study
of their potential viability. It is based on low-level technical and economic assessments that are not sufficient to
support the estimation of ore reserves. Further evaluation work and appropriate studies are required before Core
will be in a position to estimate any ore reserves or to provide any assurance of an economic development case.
The Scoping Study is based on the material assumptions outlined below. These include assumptions about the
availability of funding. While Core considers all of the material assumptions to be based on reasonable grounds,
there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study
will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding will likely be required and will be
determined by the strategic approach taken to progress the Operation. As the Carlton Scoping Study outcomes
are phased after ten years of production, the development of Carlton is expected to be internally funded based
on current modelling. Investors should note that there is no certainty that Core will be able to raise that amount of
funding when needed. It is also possible that such funding may only be available on terms that may be dilutive to
or otherwise affect the value of Core’s existing shares. It is also possible that Core could pursue other ‘value
realisation’ strategies such as a sale, partial sale or joint venture of the project. If it does, this could materially
reduce Core’s proportionate ownership of the project. Given the uncertainties involved, investors should not make
any investment decisions based solely on the results of the Scoping Study.
There is a low level of geological confidence associated with inferred mineral resources and there is no certainty
that further exploration work will result in the determination of indicated mineral resources or that the production
target itself will be realised.
The Study contains approximately 12.9% of Inferred Mineral Resources. An Inferred Mineral Resource has a low
level of confidence than an Ore Reserve or a Measured and Indicated Mineral Resource and there is no certainty
that further exploration work will result in the conversion of the Inferred mineralisation into an Ore Reserve or
Measured or Indicated Mineral Resource or that the production target itself will be realised.
For full details of the updated Finniss Ore Reserve, including a Competent Person statement. Refer to ASX
Announcement “Updated Finniss Lithium Project Ore Reserve and Mineral Resource Estimate” on 14 May 2025.
corelithium.com.au
3
Study Key Outcomes
The Company has completed a comprehensive, bottom-up assessment of the Operation. The focus has been to
develop a new mining and processing plan to reduce the Project’s operating and capital cost base and improve
operating efficiency. This Study delivers a more resilient operation that will be able to operate through the
commodity cycle and deliver significant shareholder value.
The Study includes:
▪
Optimised mine plans for the Grants, BP33 and Carlton deposits and mining schedules;
▪
An enhanced process flowsheet and proposed process plant upgrades;
▪
Detailed operating and capital cost estimates; and
▪
Future upside opportunities.
An updated Ore Reserve and Exploration Targets for the Blackbeard and BP33 Deeps has also been completed
to support the Study and have been released separately by Core today.
The Study demonstrates a robust operation with an updated potential Mine Life of 20 years and future extension
potential. The project boasts exceptional potential to grow beyond this Study’s production estimate.
Table 1: Study Summary
Key Metrics
Units
Amount
Life of Mine (LOM)
Years
20
Annual production throughput
ktpa
1,200
Ore processed (Ore Reserves)
kt
10,726
Ore processed (feed total)
kt
17,575
Average feed grade
%
1.27
Global recovery
%
78
Nameplate annual concentrate produced (SC6 eq.)
ktpa
205
Concentrate produced (SC6 eq.)
kt
2,911
$/t mined
63 – 72
Processing & tailings
$/t processed
40 – 46
Site General & Administration
$/t processed
9 – 10
Transport
$/t product
22 – 25
$/t
690 – 785
$M
175 – 200
$/t mined
20 – 22
Operating Costs
Mining
Unit operating Costs (FOB SC6 eq. excluding royalties)
Capital Costs
Pre-Production Capital
Sustaining Capital
corelithium.com.au
4
Mining
The updated mine plan for Finniss is based on underground mining. This capitalises on the high-grade, steeply
dipping and continuous nature of the ore bodies which are typical of the deposits in the Bynoe Pegmatite Field.
Underground mining will significantly reduce waste movements and enable greater control of the quality of feed
being delivered to the process plant.
The Study contains more tonnes at a lower cost compared to the previous plan, while maintaining a similar highgrade ore feed of 1.27% Li2O. The first ten years of the Study mine schedule (Figure 1) is 94% sourced from Ore
Reserves.
The Study mine plan will result in a change in the mining method at Grants from open pit to underground and
optimised underground mine plans for BP33 and Carlton. Mining will initially be undertaken at Grants.
Advancement of underground development at BP33 will be undertaken concurrently with ore from BP33 entering
the mine schedule in year two.
A portal will be developed at the southern end of the Grants pit adjacent to the existing haul road. The underground
design utilises two mining areas of 25m high stopes. A 1,200m link drive from the Grants pit is also planned to
access the Carlton deposit as part of the Study mine plan.
BP33 contributes 85% of ore feed in the first ten years of operation. Mineralisation at BP33 is hosted within a
dominant, large, sub-vertical pegmatite body and a smaller sill-like body on the northwestern side. The BP33
pegmatite is 350m in strike length and up to 40m in true width. There is a very strong steep southerly plunge
component with a depth extent currently more than 800m. These characteristics make BP33 well suited for highly
productive, low cost, Long Hole Open Stoping mining methods. Dual access to the ore body from the decline will
allow flexibility in stope sequencing.
Figure 1: Study Mining Schedule
The transition from an open pit to planned underground mine extraction has more than doubled the Grants Ore
Reserve. The Study also optimises the BP33 mining method to decrease future development requirements.
Accordingly, the BP33 Ore Reserve tonnes has increased by 7%.
corelithium.com.au
5
Table 2: Statement of Ore Reserves
Deposit
Grants Underground
BP33 Underground
Stockpiles / TSF
Total
Reserve
Category
Tonnes (Mt)
Li2O (%)
Contained
Li2O (kt)
Proved
0.87
1.29
11.2
Probable
0.28
1.36
3.9
Total
1.15
1.31
15.1
Proved
2.56
1.27
32.4
Probable
6.74
1.32
88.8
Total
9.29
1.31
121.2
Proved
-
-
-
Probable
0.28
0.68
1.93
Total
0.28
0.68
1.93
Proved
3.43
1.28
43.6
Probable
7.30
1.30
94.6
Total
10.73
1.29
138.2
Less than 25% of the Finniss Mineral Resources have been included in the Ore Reserve, presenting significant
scope for extensions to the mine life in future with further drilling and mining studies.
Table 3: Statement of In Situ Mineral Resources
Resource Category4
Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Measured
6.3
1.41
89
Indicated
21.6
1.30
280
Inferred
20.3
1.18
239
Total
48.2
1.26
608
To date, Core has conducted relatively limited exploration drilling outside the Mineral Resource area. As a result,
there is substantial potential for the addition of further high-grade resources from regional deposits, which Core
intends to assess through future exploration drilling.
In addition to the In Situ Mineral Resources, a total of 310kt @ 0.66% Li2O Indicated Resources are reported for
the Mineralised Material within the Tailings Storage Facility (TSF) and coarse rejects stockpiles located throughout
the Project.
4. The In Situ mineral resource was announced as “Finniss Mineral Resource Increased by 58%” on 11 April 2024.
corelithium.com.au
6
Table 4: BP33 & Blackbeard – Exploration Target
Exploration Target
Tonnes (Mt)
Li2O (%)
Blackbeard
7 – 10
1.50 – 1.70
BP33 Deeps
3.9 – 6.5
1.50 – 1.60
The Exploration Target Estimate for the Blackbeard deposit as well as extension of the BP33 resource at depth
have been reported in accordance with JORC 2012 guidelines as summarised in Table 4. Full details are provided
in the Updated Ore Reserves release5.
Figure 2: BP33 Exploration Target6
Figure 3: Blackbeard Exploration Target7
Cautionary Statement: The Exploration Target has been prepared and reported in accordance with the 2012
edition of the JORC Code. The estimated quantity and grade of the Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource. It is uncertain if further exploration will
result in the estimation of a Mineral Resource.
5. Refer to ASX Announcement “Updated Finniss Lithium Project Ore Reserve and Mineral Resource Estimate” on 14 May 2025.
6. Refer to ASX announcement “Mineral Resource at BP33 increased to 89% Measured and Indicated” on 16 October 2023. The BP33 Mineral Resource Estimate
(MRE) of 10.5Mt at 1.53% Li2O was first reported on 16 October 2023. The BP33 MRE is comprised of 2.85Mt at 1.44% Li2O Measured MRE, 6.51Mt at 1.55%
Li2O Indicated MRE and 1.14Mt at 1.59% Li2O Inferred MRE.
7. Refer to ASX announcement “Significant Increase to Finniss Mineral Resources” on 18 April 2023 and “New high-grade Lithium drill results within 20km of the
Grants processing facility” on 6 November 2024.
corelithium.com.au
7
Processing
Finniss has a Dense Media Separation (DMS) plant with a nominal processing capacity of 1.0Mtpa that will be
expanded to 1.2Mtpa as part of the Study. The plant has been actively maintained by a dedicated team with the
expectation that it will be restarted to ensure its value is preserved.
With the recent acquisition of the Crushing circuit, Core will move to 100% ownership of the processing
infrastructure.8
Crushing and processing activities will be integrated into a more efficient operating model, which forecasts
crushing costs to half. This reduction leverages the high return on invested capital identified as part of the Crushing
plant acquisition. Overall processing costs will reduce by 33% to $40-$46 per tonne processed.
Within the Study, a detailed program of metallurgical testwork and optimisation studies, was completed both
internally and independently. This confirmed that the most cost-effective process plant configuration at Finniss is
an enhanced DMS plant without the need to install a flotation circuit. The Study proposes a reconfiguration of the
current processing plant. This is designed to increase throughput to 1.2Mtpa and average global recovery to 78%
through:
▪
Adoption of 10mm plant feed size which brings product size distribution within original plant design
envelope.
▪
A gravity separation circuit to process ultra-fine material.
▪
Reconfiguration of the rolls crusher, into a close circuit, enhancing and improving Ultra fine DMS
performance, increasing recovery.
▪
Increased screening capacity by the simple addition of static screens in front of vibrating screens.
▪
The Gravity Classifier circuit will also produce a dry stack tailings stream, diverting material that would
previously need to be stored at the TSF.
The dry stacked tailing stream will be diverting materials that would previously need to be stored at the Tailings
Storage Facility, to be backhauled and used in BP33. This will negate the need for a tails dam lift in the medium
term.
In addition to improving recovery, the processing upgrade is forecast to stabilise the concentrate quality, reduce
concentrate handling costs, and provide a high-quality and consistent source of underground paste fill material
for BP33.
As a result of the above test work and the simplified flow sheet, high cost grinding and a flotation circuit is no
longer required.
The DMS plant spodumene concentrate grade, has a design range between 5.0 and 6.0%, providing the Company
with material flexibility to tailor its product to maximise value and meet customer requirements over time.
8. Refer to ASX announcement “Finniss Restart Study and Operations Update” on 27 March 2025
corelithium.com.au
8
Operating Costs
The Study incorporates a new operating cost model with refined mining and physical parameters that have
reduced total operating costs significantly. The change to an underground mining method for BP33 and Grants
has led to a halving in mining costs to $63-72/t. The acquisition of, crushing infrastructure, along with enhanced
flow sheet and increased throughput will significantly reduce processing costs by approximately 33% to $40-46/t
processed.
Table 5: Operating Cost Summary
Cost Centre
Units
Total
$/t mined
63 – 72
Processing & Tailings
$/t processed
40 – 46
General & Administration
$/t processed
9 – 10
Transport
$/t product
22 – 25
$/t
690 – 785
Mining
Unit operating Cost (FOB SC6 eq. excluding royalties)*
*Unit operating cost (FOB excluding royalties) includes mining, processing, haulage, port charges, and site based general and administration
costs. It is calculated on an SC6 equivalent basis.
Upside Opportunities
The Study has identified several opportunities to enhance the restart plan, including pathways to improve returns,
extend mine life, and increase production.
Process improvements
Opportunities exist to enhance processing performance by increasing DMS feed efficiency and improving
recovery. Further refinement of mining practices may also reduce dilution, contributing to higher feed grades and
better plant outcomes.
Increased production and LOM extension
Immediate potential exists to target increased ore production from Finniss to extend the mine life. The Study mine
plan only includes the Grants, BP33, and Carlton deposits defined Mineral Resources. Several prospects are
planned to potentially increase the LOM mineable quantities in future work programs, these include Blackbeard
and BP33 Deeps.
Throughput expansion
Further studies are underway to investigate the potential to increase the plant throughput beyond 1.2Mpta.
Potential feed material could be sourced to support this expansion through bringing forward mining at Carlton and
the potential addition of Blackbeard with exploration success.
corelithium.com.au
9
Capital and Funding
The restart of Finniss will require pre-production capital of $175 – $200M.
To fund the Finniss restart, Core continues to advance funding and strategic discussions with potential partners
and financiers. Morgan Stanley Australia Limited has been appointed to evaluate the broad range of funding
alternatives available to Core. The Company remains focused on minimising equity dilution and maximising value
for shareholders.
Core reported a cash balance of $30M as at 31 March 2025 which is sufficient to support current work programs
to advance the project and finalise the strategic funding process. FID for the Finniss restart will be subject to the
approval of the Core Board and securing a suitably attractive funding option.
This announcement has been approved for release by the Board of Core Lithium Ltd.
For further information, please contact:
Investor Enquiries
Media enquiries
Paul Brown
Michael Vaughan
CEO
Executive Director
Core Lithium Ltd
Fivemark Partners
+61 8 8317 1700
+61 422 602 720
info@corelithium.com.au
michael.vaughan@fivemark.com.au
About Core Lithium
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained shareholder value from critical minerals exploration and
mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au
corelithium.com.au
10
Important Information and forward-looking statements
This announcement may reference forecasts, estimates, assumptions and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
Certain information in this document refers to the intentions of Core. Still, these are not intended to be forecasts,
forward-looking statements, or statements about future matters for the Corporations Act or any other applicable
law. The occurrence of the events in the future is subject to risk, uncertainties, and other actions that may cause
Core's actual results, performance, or achievements to differ from those referred to in this document. Accordingly,
Core and its affiliates and their directors, officers, employees, and agents do not give any assurance or guarantee
that the occurrence of these events referred to in the document will actually occur as contemplated.
Statements contained in this document, including but not limited to those regarding the possible or assumed future
costs, performance, dividends, returns, revenue, exchange rates, potential growth of Core, industry growth or
other projections, and any estimated company earnings are or may be forward-looking statements. Forwardlooking statements can generally be identified by the use of words such as ‘project,’ ‘foresee’, ‘plan’, ‘expect’,
‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. These statements relate
to future events and expectations and, as such, involve known and unknown risks and significant uncertainties,
many of which are outside the control of Core. Actual results, performance, actions, and developments of Core
may differ materially from those expressed or implied by the forward-looking statements in this document.
Such forward-looking statements speak only as of the date of this document. There can be no assurance that
actual outcomes will not differ materially from these statements. To the maximum extent permitted by law, Core
and any of its affiliates and their directors, officers, employees, agents, associates, and advisers:
▪
Disclaim any obligations or undertaking to release any updates or revisions to the information to reflect
any change in expectations or assumptions.
▪
Do not make any representation or warranty, express or implied, as to the accuracy, reliability, or
completeness of the information in this document or the likelihood of fulfilment of any forward-looking
statement or any event or results expressed or implied in any forward-looking statement; and
▪
Disclaim all responsibility and liability for these forward-looking statements (including, without limitation,
liability for negligence).
corelithium.com.au
11
Competent Person Statement and JORC Information
The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC
Code’) sets out minimum standards, recommendations, and guidelines for Public Reporting in Australasia of
Exploration Results, Mineral Resources and Ore Reserves.
The information in this report that relates to Mineral Resources and the Exploration Target is based on information
compiled by Dr Graeme McDonald, who is a full-time employee of Core and a Registered Member of the AusIMM
and the AIG. Dr McDonald has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity that he has undertaken to qualify as a Qualified Person as defined
in the JORC Code.
Reporting of the Mineral Resources Estimate and Exploration Target complies with the recommended guidelines
of the JORC Code and is therefore suitable for public reporting.
The information in this report that relates to Ore Reserves is based on information compiled by Mr Tom Joseph,
a full-time employee of Core and a registered member of the AusIMM. Mr. Joseph has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has
undertaken to qualify as a Competent Person as defined in the JORC Code.
Reporting of the Ore Reserves estimate complies with the recommended guidelines of the JORC Code and is
therefore suitable for public reporting.
The estimated ore reserves and mineral resources underpinning the production target have been prepared by
competent persons is accordance with the JORC code.
Core confirms that the Company is not aware of any new information or data that materially affects the results
included in this announcement as cross referenced in the body of this announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource Estimate (MRE) and Ore Reserve
Estimate (ORE) continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original announcements.
corelithium.com.au
12
Restart Study - Finniss Operation,
Northern Territory
Core Lithium
corelithium.com.au
i
TABLE OF CONTENTS
1
EXECUTIVE SUMMARY ...................................................................................................................1
1.1
1.2
1.3
Restart Development and Operations Changes ................................................................................2
Key Outcomes ....................................................................................................................................3
Mineral Resources and Ore Reserves ...............................................................................................5
2
INTRODUCTION ................................................................................................................................7
2.1
2.2
2.3
2.4
Study Participants ..............................................................................................................................7
Property Description and Location .....................................................................................................7
Location ..............................................................................................................................................7
Land Tenure .......................................................................................................................................7
3
ACCESSIBILITY, CLIMATE AND LOCAL RESOURCES ................................................................9
3.1
3.2
3.3
Accessibility ........................................................................................................................................9
Climate ...............................................................................................................................................9
Local Resources .................................................................................................................................9
4
HISTORY..........................................................................................................................................10
4.1
Production History ............................................................................................................................10
5
GEOLOGICAL SETTING .................................................................................................................11
5.1
5.2
Deposit Geology ...............................................................................................................................11
Geology and Geometry Context .............................................................................................
Share your feedback
Discover