Core Lithium Half-year Report
Released
Released
Announcement PDF
ABN: 80 146 287 809
Interim Consolidated Financial Statements
for the half year ended 31 December 2024
1
Contents
Directors’ Report
3
Auditor’s Independence Declaration
6
Financial Report
7
Statement of Profit or Loss and Other Comprehensive Income
7
Statement of Financial Position
8
Statement of Changes in Equity
9
Statement of Cash Flows
10
Notes to the Consolidated Financial Statements
11
Directors’ Declaration
24
Independent Auditor’s Review Report
25
Corporate Information
27
This Report covers Core Lithium Ltd ("Core", the "Parent" or the
"Company") and its subsidiaries, collectively referred to as "the
Group".
The financial report is presented in Australian dollars.
Its registered office and principal place of business is:
Core Lithium Ltd
Level 9, 2 Mill Street Perth 6000
Western Australia
2
Directors’ Report
Your Directors present their report together with the financial statements of the consolidated entity being Core
Lithium Ltd (“Core” or “the Company”) and its controlled entities (“the Group”) for the half year ended 31 December
2024 (“Half Year”) and the Independent Auditor’s Review Report therein.
Directors
The Directors of the Company who held office during the Half Year and up to the date of this report are stated
below. Directors were in office for this entire period unless otherwise stated.
Greg English
Heath Hellewell
Malcolm McComas
Alicia Sherwood
Non-Executive Chair
Non-Executive Director
Non-Executive Director
Non-Executive Director (appointed 1 December 2024)
Review of operations and financial results for the period
Core is the 100% owner of the Finniss Lithium Operation (“Finniss” or the “Project”), located 88km by road from
the Darwin Port in the Northern Territory. Finniss Project is a multi-mine, hard rock lithium operation and includes
a modern processing plant with associated infrastructure.
Finniss Operations
The Half Year to 31 December 2024 was underpinned by significant operational and corporate activity as the
Group transitioned to prioritising the safe preservation of Finniss Project in a restart ready state following the
cessation of operating activities in response to the fall in the lithium price in June 2024.
Key operational activities over the Half Year included condition assessments of plant pumping infrastructure to
support restart preparations and equipment servicing to ensure the reliability of power generation systems. Capital
purchases of power generators were completed to replace hired equipment, reducing operating costs and
delivering long-term savings. Additionally, a water management plan was developed to ensure infrastructure
remains in good condition and water levels are aligned with restart requirements.
Sustainability
During the Half Year, compliance with all regulatory commitments remained a priority for the Finniss site team.
Core maintained a strong focus on safety performance and reported no lost time injuries or significant
environmental incidents and two minor safety incidents. during the period.
Environmental compliance remained a key focus across the period, with ongoing monitoring and data reporting
on water management and pollutant inventories. Preparations for the wet season was a focus, including ensuring
water storage capacity, pipework repairs, deployment of pumps, and sediment control measures. A submersible
pump was installed in Grants open pit to facilitate water transfer to surface storage, and water treatment activities
were conducted to optimise chemistry for dilution management.
Restart Study
Core is now advancing a restart strategy for Finniss Project, designed to enhance the operation across operating
costs, efficiency, product quality and sustainability. This will enable readiness to resume operations in improved
lithium market conditions, subject to favourable results from the restart study and the ability to raise funds to
recommence operations. Significant advancements in both mining and processing workstreams to support these
objectives were made during the period.
Key optimisation activities are advancing for the BP33 underground mine with a focus on capital and operating
cost reductions, design refinements, efficient sequencing, dewatering strategy and ventilation. Parallel efforts at
the Grants open pit are focused on improved mining and drill and blast practices, pit wall design, and cut-off grade
adjustments to enhance project returns.
The ongoing work to date on processing continues to align with our stated aim of delivering a more efficient, lowercost operation at Finniss. Further updates on this work's progress will be shared as the Restart Study proceeds.
3
In September 2024, Core reported an Ore Reserve Estimate update which resulted in significant ore reserve
growth in the BP33 underground mine that provides a strong foundation for the Restart Study.
The Restart Study remains on track for completion by Q4FY25. These efforts seek to ensure the Finniss Project
is well-positioned for a successful restart and aligned with evolving market conditions.
Exploration
Exploration activities during the Half Year were aimed at expanding Mineral Resources and testing high-priority
targets. Drilling efforts targeted lithium and gold prospects, with significant programs completed at Blackbeard,
Shoobridge and regional tenements near the Finniss Project. At Blackbeard, drilling intersected high-grade
lithium-bearing pegmatites over potentially mineable widths, highlighting the opportunity for the future expansion
of lithium resources at Finnis. Geochemical and geophysical programs continue to identify new targets across the
Finniss Project area.
Drilling at Shoobridge confirmed broad zones of shallow, gold mineralisation, within a much larger prospective
trend.
All results from exploration activities in the period are being reviewed to inform Core’s upcoming exploration
strategy.
Results of Operation
Total consolidated comprehensive loss of the Group for the six months to 31 December 2024 was $17.2 million
(31 December 2023: total consolidated comprehensive loss of $167.6 million).
The Company’s basic loss per share was 0.82 cents per share (31 December 2023: loss of 8.16 cents per share).
No dividend has been paid during or is recommended for the half-year ended 31 December 2024 in line with the
previous period.
Financial Position
As at 31 December 2024, Core had cash of $49.7 million and ore stockpile inventory with a net realisable value
of $5.5 million. Significant cash flows during the half-year include:
•
$17.1 million of one-off non-recurring cost related to the operational transition.
•
Royalty payments of $4.8 million relating to FY23 and FY24
•
Capital purchases of $1.5 million mainly related to the power generators
•
Finniss site and maintenance costs of $6.7 million
•
Exploration expenditure of $5.7 million
Corporate
In September 2024, Core purchased 7.6 million shares in Charger Metals NL (ASX:CHR) (Charger) held by
Lithium Australia Ltd (ASX:LIT) (Lithium Australia) (name changed to Livium Ltd) (Charger Shares) through the
issue of 6.08 million Core shares to Lithium Australia (being 0.8 Core shares for each Charger Share).
During the Half Year, James Bruce joined Core as Chief Operating Officer. Mr Bruce is a highly experienced
mining engineer and corporate executive with over 30 years in the industry. Immediately prior to joining Core, he
was Executive General Manager – Corporate Development at Mineral Resources Ltd.
On 1 December 2024, the Core Lithium Board appointed Alicia Sherwood as a Non-Executive Director. Ms
Sherwood brings over 25 years of experience across the private, public, and not-for-profit sectors, with a strong
focus on stakeholder management, governance, and leadership and her most recent role was General Manager
of Core’s Finniss Lithium Mine.
4
Significant changes to the state of affairs
There have been no changes in the state of affairs of the Group that occurred during the Half Year under review
not otherwise disclosed in this Directors’ Report.
Rounding of amounts
Amounts in this report and the accompanying financial report have been rounded to the nearest thousand dollars
($'000) unless otherwise stated under the option available to the Company under ASIC Corporations (Rounding
in Financial/Directors' Report) Instrument 2016/191. The Company is an entity to which the instrument applies.
Events arising since the end of the reporting date
Since the end of the period and to the date of this report, no matters or circumstances have arisen that have
significantly affected, or may significantly affect, the operations of the Group, the results of operation or the state
of affairs of the Group in subsequent periods.
Forward-looking statements
This release contains certain statements that may constitute “forward-looking statements”, including statements
about trends in commodity prices and currency exchange rates; demand for commodities; production forecasts;
plans, strategies and objectives of management; capital costs and scheduling; operating costs; anticipated
productive lives of projects, mines and operations; and provisions and contingent liabilities.
These forward-looking statements reflect expectations at the date of this report. However, they are not guarantees
or predictions of future performance. They involve known and unknown risks, uncertainties and other factors,
many of which are beyond our control, and which may cause actual results to differ materially from those
expressed in the statements contained in this report.
Readers are cautioned not to put undue reliance on forward-looking statements. Core makes no representation,
guarantee, warranty or assurance, express or implied, as to the accuracy or likelihood of the forward-looking
statements or any outcomes expressed or implied in any forward-looking statements contained in this report being
achieved or proved to be correct.
Except as required by applicable laws or regulations, Core does not undertake to publicly update or review any
forward-looking statements, whether as a result of new information or future events. Past performance cannot be
relied on as a guide to future performance, and Core cautions against reliance on any forward-looking statements
or guidance.
Greg English
Non-Executive Chair
28 February 2025
5
Grant Thornton Audit Pty Ltd
Grant Thornton House
Level 3
170 Frome Street
Adelaide SA 5000
GPO Box 1270
Adelaide SA 5001
T +61 8 8372 6666
Auditor’s Independence Declaration
To the Directors of Core Lithium Limited
In accordance with the requirements of section 307C of the Corporations Act 2001, as lead auditor for the review
of Core Lithium Limited for the half-year ended 31 December 2024, I declare that, to the best of my knowledge
and belief, there have been:
a
no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the
review; and
b
no contraventions of any applicable code of professional conduct in relation to the review.
GRANT THORNTON AUDIT PTY LTD
Chartered Accountants
J L Humphrey
Partner – Audit & Assurance
Adelaide, 28 February 2025
www.grantthornton.com.au
ACN-130 913 594
Grant Thornton Audit Pty Ltd ACN 130 913 594 a subsidiary or related entity of Grant Thornton Australia Limited ABN 41 127 556 389 ACN 127 556 389.
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or
refers to one or more member firms, as the context requires. Grant Thornton Australia Limited is a member firm of Grant Thornton International Ltd (GTIL).
GTIL and the member firms are not a worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered by the member
firms. GTIL does not provide services to clients. GTIL and its member firms are not agents of, and do not obligate one another and are not liable for one
another’s acts or omissions. In the Australian context only, the use of the term ‘Grant Thornton’ may refer to Grant Thornton Australia Limited ABN 41 127
556 389 ACN 127 556 389 and its Australian subsidiaries and related entities. Liability limited by a scheme approved under Professional Standards
Legislation.
STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME
For the half year ended 31 December 2024
Notes
31 December
2024
31 December
2023
$'000
-
$'000
183,836
Revenue from contracts with customers
3
Quotational period adjustments
4
(2,421)
(49,040)
Cost of sales
5
-
(132,613)
(2,421)
2,183
Interest income
542
3,060
Other income
120
1,161
Gross (loss)/profit
Site related expenses
6
(7,855)
(2,305)
Royalties
7
1,030
(3,439)
Onerous contracts provision expense
15
-
(27,582)
General and administration expenses
8
(7,296)
(13,812)
-
(119,647)
Impairment of non-financial assets
Impairment of capitalised exploration expense
12
-
(792)
Inventory net realisable value movement
10
(678)
-
(926)
(1,451)
363
(134)
(17,121)
(162,758)
-
(4,862)
(17,121)
(167,620)
(84)
-
(17,205)
(167,620)
Basic loss per share (cents)
(0.82)
(8.16)
Diluted loss per share (cents)
(0.82)
(8.16)
Finance costs
Foreign currency gain/(loss)
Loss before income tax expense
Income tax expense
Net loss for the period
Other comprehensive income
Total comprehensive loss for the period
Loss per share from continuing operations
This statement should be read in conjunction with the notes to the financial statements.
7
STATEMENT OF FINANCIAL POSITION
As at 31 December 2024
Notes
31 December 2024
$'000
30 June 2024
49,730
87,606
805
1,460
$'000
ASSETS
Current assets
Cash and cash equivalents
Other receivables
Other financial assets
9
570
570
Inventories
10
8,016
8,533
Other assets
11
1,540
1,337
60,661
99,506
Total current assets
Non-current assets
Other assets
11
11,581
11,922
Other financial assets
9
600
-
Inventories
10
3,062
2,708
Exploration and evaluation assets
12
83,764
77,945
Plant, equipment, and mine development assets
13
127,962
131,877
Total non-current assets
226,969
224,452
TOTAL ASSETS
287,630
323,958
5,333
16,623
Financial liabilities
-
661
Other liabilities
-
918
LIABILITIES
Current liabilities
Trade and other payables
Lease liabilities
14
563
477
Provisions
15
26,617
19,123
32,513
37,802
Total current liabilities
Non-current liabilities
Lease liabilities
14
2,670
3,057
Provisions
15
11,955
26,227
Total non-current liabilities
14,625
29,284
TOTAL LIABILITIES
47,138
67,086
NET ASSETS
240,492
256,872
479,240
478,632
1,313
1,620
(240,061)
(223,380)
240,492
256,872
EQUITY
Issued capital
16
Reserves
Accumulated losses
TOTAL EQUITY
This statement should be read in conjunction with the notes to the financial statements.
8
STATEMENT OF CHANGES IN EQUITY
For the half year ended 31 December 2024
Issued
2024
Balance at 1 July 2024
Issuance of shares
Performance rights and options issued to officers
and employees at fair value
Lapse of performance rights at fair value
Reserves
capital
$'000
$'000
478,632
1,620
Accumulated
losses
$'000
Total
equity
$'000
(223,380)
256,872
608
-
-
608
-
321
-
321
-
(440)
440
-
-
(104)
-
(104)
479,240
1,397
(222,940)
257,697
Total loss
-
-
(17,121)
(17,121)
Total other comprehensive income
-
(84)
-
(84)
479,240
1,313
(240,061)
240,492
Reserves
Accumulated
losses
$'000
Total
equity
$'000
532
(16,550)
354,922
Forfeit of performance rights at fair value
Transactions with owners
Comprehensive income:
Balance 31 December 2024
Issued
2023
capital
Balance at 1 July 2023
$'000
370,940
Issue of shares - share placement
100,000
-
-
100,000
Issue of shares - shares purchase plan (SPP)
11,368
-
-
11,368
Issue costs – net of tax
Performance rights issued to officers and employees
at fair value
Lapse of performance rights at fair value
(3,676)
-
-
(3,676)
-
610
-
610
-
(184)
184
-
Transactions with owners
478,632
958
(16,366)
463,224
Total loss
-
-
(167,620)
(167,620)
Total other comprehensive income
-
-
-
-
478,632
958
(183,986)
295,604
$'000
Comprehensive income:
Balance 31 December 2023
This statement should be read in conjunction with the notes to the financial statements.
9
STATEMENT OF CASH FLOWS
For the half year ended 31 December 2024
31 December
2024
$'000
31 December
2023
$'000
Receipts from customers
468
123,586
Repayments to customers
(3,496)
(55,836)
542
3,060
(27,518)
(125,048)
(38)
(549)
(30,042)
(54,787)
(1,508)
(53,839)
(5,676)
(22,495)
-
42
Payments for financial assets
(76)
-
Government co-funding grants repaid1
(918)
-
Proceeds from environmental and security bonds
341
-
Payments for environmental and security bonds
-
(530)
(7,837)
(76,822)
Financing activities
Proceeds from the issue of share capital
Proceeds from exercise of options
-
111,368
-
Payments of share issue transaction costs
-
(3,675)
Payments of lease liabilities
(316)
(2,670)
Net cash from financing activities
(316)
105,023
(38,195)
(26,586)
319
(1,374)
Cash and cash equivalents at the beginning of the period
87,606
152,786
Cash and cash equivalents at the end of the period
49,730
124,826
Operating activities
Interest received
Payments to suppliers and employees
Interest paid
Net cash used in operating activities
Investing activities
Payments for plant, equipment, and mine development assets
Payments for capitalised exploration and evaluation
expenditure
Proceeds from disposal of plant and equipment
Net cash used in investing activities
Net change in cash and cash equivalents
Net foreign exchange difference
This statement should be read in conjunction with the notes to the financial statements.
1 Repayment of unused funds received under the Federal Government’s Modern Mining Initiative (MMI).
10
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
1 Statement of significant accounting policies
a) Reporting entity
Core Lithium Ltd (the “Company”) is a listed public company registered and domiciled in Australia.
These consolidated interim financial statements (“interim financial statements”) as at and for the 6
months ended 31 December 2024 comprise the Company and its subsidiaries (together referred
to as the “Group”).
The Group is an Australian hard-rock lithium mining company that owns and operates the Finniss
Lithium Project on the Cox Peninsula, 88km south-west of the Darwin Port in the Northern Territory.
b) General information and basis of preparation
The interim financial statements of the Group are for the six months ended 31 December 2024 and
are presented in Australian dollars ($) which is the functional currency of the Group. The amounts
contained in the financial report have been rounded to the nearest $1,000 (where rounding is
applicable) where noted ($000). These general purpose interim financial statements have been
prepared in accordance with the requirements of the Corporations Act 2001 (Cth) and AASB 134 Interim Financial Reporting.
They do not include all the information required in annual financial statements in accordance with
AASB and should be read in conjunction with the consolidated financial statements of the Group
for the year ended 30 June 2024 and any public announcements made by the Group during the
Half Year in accordance with the continuous disclosure requirements arising under the Australian
Securities Exchange Listing Rules and the Corporations Act 2001 (Cth). The Group is a for profit
entity for the purposes of preparing its financial statements.
The interim financial statements have been approved and authorised for issue by the board of
directors on 28 February 2025.
c) Critical accounting estimates and judgements
The Directors evaluate estimates and judgements incorporated into the interim financial report
based on historical knowledge and best available current information. Estimates assume a
reasonable expectation of future events and are based on current trends of economic data,
obtained both externally and within the Group.
11
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
2 Operating segments
Management has determined the operating segments based on internal reports about components of
the Group that are regularly reviewed by the CEO as Chief Operating Decision Maker (CODM), to
make strategic decisions. The Group has identified two reportable segments of its business:
•
Finniss Lithium Project: care and maintenance and dewatering of existing infrastructure of Grants
operations.
•
Exploration: exploration and evaluation of primarily lithium mineralisation.
The CODM monitors performance in these areas separately. Unless stated otherwise, all amounts
reported to the CODM are determined in accordance with accounting policies that are consistent with
those adopted in the annual financial statements of the Group. Operating segment performance details
for the six-month periods ended 31 December 2024 and 31 December 2023 are set out below:
Segment results
December 2024 Segment results
Segment revenue
Cost of sales
Gross loss
Inventory net realisable value movement
Other operating expenses
Segment margin
Interest income
Other income
General and administration expense
Finance costs
Foreign currency gain
Loss before tax
December 2023 Segment results
Segment revenue
Cost of sales
Gross profit
Exploration and evaluation assets and impairment
Other operating expenses
Onerous and general contract expenses
Impairment of non-financial assets
Segment margin
Interest income
Other income
General and administration expense
Finance costs
Foreign currency loss
Loss before tax
Finniss
Lithium Project Exploration
$’000
$’000
(2,421)
(2,421)
(678)
(6,825)
(9,924)
-
Finniss
Lithium Project Exploration
$'000
$'000
134,796
(132,613)
2,183
(792)
(5,744)
(27,582)
(119,647)
(150,790)
(792)
Total
$'000
(2,421)
(2,421)
(678)
(6,825)
(9,924)
542
120
(7,296)
(926)
363
(17,121)
Total
$'000
134,796
(132,613)
2,183
(792)
(5,744)
(27,582)
(119,647)
(151,582)
3,060
1,161
(13,812)
(1,451)
(134)
(162,758)
12
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
2 Operating segments (cont.)
Operating segment assets are reconciled to total assets as follows:
31 December
30 June
2024
$’000
2024
$’000
Finniss Lithium Project
160,087
164,596
Exploration
71,949
66,131
Total segment assets
232,036
230,727
49,730
87,606
421
203
Other financial assets
1,170
570
Other assets
1,247
1,531
Plant and equipment assets
3,026
3,321
287,630
323,958
31 December
30 June
2024
$’000
2024
$’000
41,522
60,335
26
21
41,548
60,356
2,021
2,068
-
918
3,013
3,234
555
510
47,137
67,086
Segment assets
Unallocated assets:
Cash and cash equivalents
Other receivables
Total assets
Operating segment liabilities are reconciled to total liabilities as follows:
Segment liabilities
Finniss Lithium Project
Exploration
Total segment liabilities
Unallocated liabilities:
Trade and other payables
Financial liabilities
Lease liabilities
Provisions
Total liabilities
13
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
3 Revenue
Revenue from contracts with customers
Total revenue from contracts with customers
31 December
2024
$’000
-
31 December
2023
$’000
183,836
-
183,836
The Group generates revenue from sales of both spodumene concentrate and lithium fines sold
to customers.
In accordance with AASB 15 Revenue from Contracts with Customers, revenue is recognised when
control of the product has passed to the customer based upon the agreed free on board (FOB) or cost,
insurance and freight (CIF) terms based on the individual contract with each customer. For CIP shipments
there are two performance obligations, the first recognised when the product is loaded onto the ship, and
the second with revenue related to shipping and insurance recognised over the period of the journey to
the buyer. Some customers contracts may contain provisional pricing terms, with the final pricing
determined when the relevant pricing information is available.
4 Quotational period adjustment
Quotational period adjustments
Total quotational period adjustments
31 December
2024
$’000
(2,421)
31 December
2023
$’000
(49,040)
(2,421)
(49,040)
A proportion of the Group’s sales are provisionally priced, where the final price is referenced to a future
market-based index price. Adjustment to the sales price occurs based on movements in the index price
up to the end of the quotational period (QP). These are referred to as provisional pricing arrangements
and are such that the selling price for the spodumene concentrate and lithium fines are determined on a
specified future date after shipment to the customer. Adjustments to the sales price therefore occur up
until the end of the QP. The period between provisional pricing and the end of the QP is generally between
two and three months. Revenue is measured at the amount to which the Group expects to be entitled at
the end of the QP, being the estimated forward price at the date the revenue is recognised. For provisional
pricing arrangements, any future changes that occur over the QP are embedded within trade receivables
are measured at fair value through profit or loss. Subsequent changes in the fair value of provisionally
priced trade receivables are recognised in revenue but are presented separately to revenue from
contracts with customers.
Changes in fair value over the term of the provisionally priced trade receivable are estimated by reference
to movements in the index price as well as taking into account relevant over fair value consideration
including interest rate and credit risk adjustments.
14
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
5 Cost of sales
31 December
2024
$’000
-
31 December
2023
$’000
68,908
Processing costs
-
24,233
Port costs
-
8,808
Net inventory movement
-
(2,778)
Employee benefits expense
-
2,461
Depreciation and amortisation expense
-
33,538
Mining cost deferral
-
(2,557)
Total cost of sales
-
132,613
31 December
2024
$’000
-
31 December
2023
$’000
2,305
Mining costs
6 Site related expenses
Demobilisation expense
a
Site care and maintenance expense
7,855
-
Total site related expenses
7,855
2,305
a) Demobilisation expense relates to the costs associated with the suspension of mining activities
across a range of contractors at site.
7 Royalties
a
Royalties
Total royalties
31 December
2024
$’000
(1,030)
(1,030)
31 December
2023
$’000
3,439
3,439
a) This amount relates to reversal of previously recorded provision for expected royalties. The
Northern Territory Revenue Office (TRO) advised Core by a Notice of Assessment that the
expected royalty payable relating to the year ended 30 June 2023 was reduced by $1.03 million.
The Company is in ongoing discussions with the Northern Territory Government regarding the
remaining payable balance, aiming to negotiate a reduction in the outstanding amount.
15
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
8 General and administration expense
31 December
2024
$’000
1,672
31
December
2023
$’000
3,796
Superannuation expense
359
547
Director fees
196
251
Other employee benefits
805
1,352
1,591
1,858
64
642
2,140
4,658
Non-site depreciation expense
252
97
Share-based payment expense
217
611
7,296
13,812
31 December
2024
$’000
30 June
2024
$’000
570
570
570
570
600
-
600
-
1,170
570
Salaries and wages expense
Consulting expenses
Travel costs
Administration costs
Total general and administration expense
9 Other financial assets
Current
Term deposits
a
Non-current
Equity investments
Total other financial assets
b
a) The Group holds cash in term deposits used as bank guarantees provided by the Group in favour
of service providers for leased premises.
b) In September 2024, the Company acquired 7.6 million shares in Charger Metals NL (CHR) held
by Livium Ltd (previously Lithium Australia) through the issue of 6.08 million Core shares to Livium
Ltd. This represents approximately 9.8% shareholding in CHR by Core. In November 2024, the
Company participated its proportional share of CHR’s partly paid entitlement issue. The equity
investments were irrevocably designated at fair value through other comprehensive income
(FVOCI) as they are not held for trading and the Group intends to hold the investments long-term
for strategic purposes.
16
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2024
10 Inventories
31 December
2024
$’000
30 June
2024
$’000
5,488
6,018
2,528
2,515
8,016
8,533
3,062
2,708
3,062
2,708
11,078
11,241
Current
Product inventory - finished goods - at NRV
a
Consumables - at cost
Non-current
Consumables – at cost
Total inventories
a) The Group reviews the carrying amount of product inventory in line with fluctuations in the lithium
spodumene concentrate price. As at 31 December 2024, the Group wrote down product inventory
to net realisable value (NRV), which resulted in an impairment expense of $0.7 million.
11 Other assets
31 December
2024
$’000
30 June
2024
$’000
1,535
2,047
5
5
1,540
2,052
11,581
11,922
11,581
11,922
13,121
13,974
31 December
2024
$’000
77,945
30 June
2024
$’000
53,572
Current
Prepayments
Environmental Bonds
Non-current
Environmental Bonds
Total other assets
12 Exploration and evaluation
Opening balance
Expenditure during the period
a
5,819
25,174
Impairment of capitalised exploration expense
b
-
(801)
83,764
77,945
Closing balance
a) During the current period, the Group’s exploration activity was primarily focused on lithium drilling
programs to further define and grow