Core Lithium 2026 Annual Report to Shareholders
Released
Released
Announcement PDF
Annual Report
2026
Important Information
This Annual Report covers Core Lithium Ltd
(“Core”, the “Parent” or the “Company”) and
its subsidiaries, collectively referred to as
“the Group”. The financial report is presented
in Australian dollars. Core is a company
limited by shares, incorporated and domiciled
in Australia. The Company’s registered office
and principal place of business is:
Core Lithium Limited
Level 4, 186 St Georges Terrace
Perth WA 6000
Contents
Acknowledgment
of Country
Core acknowledges First Nations people,
the traditional custodians of the land on which
we work throughout Australia. We pay our
respects to the people and cultures, and to
their elders past and present. We recognise
their connection to land, water and community,
and their rich contribution to society.
Chair’s Letter 2
Managing Director and CEO’s Letter 6
Review of Operations 10
Sustainability 26
Mineral Resource and Ore Reserves Statement 34
Tenement Schedule 42
Directors’ Report 44
Auditor's Independence Declaration 72
Financial Report 74
Independent Auditor’s Report 116
ASX Additional Information 119
Corporate Information 121
Core Lithium Annual Report 2026 1
Dear Core shareholders,
The past year has been one of the most significant in Core's
history. We have taken a major step in re-establishing Core
as a significant Australian lithium producer, following a
disciplined and well-executed restart strategy at our Finniss
Lithium Operation in the Northern Territory. This achievement
reflects the quality of the Finniss asset, the capability of
our team and the confidence of our strategic partners and
shareholders. Mining has now commenced and with it,
a new chapter for the Company.
Since securing funding and making a Final Investment
Decision (FID) in March, our focus has been on delivery
and execution. We successfully transitioned Finniss from
care and maintenance back into an active mining operation
through a carefully executed restart strategy, positioning
Finniss for long-term success as a reliable Australian lithium
operation. The milestones achieved so far reflect the quality
of our assets, our strategic location in the Northern Territory,
the strength of our team, and the confidence placed in us by
our strategic partners and shareholders. Finniss is underpinned
by strong fundamentals, including a 20-year mine life,
estimated nameplate spodumene concentrate production
of 214ktpa and a steady-state mining rate of 1.2Mtpa.
Chair’s Letter
With funding secured and execution
well underway, our focus is on
delivery and meeting operational
and development milestones.
Core Lithium Annual Report 2026
2
Executing the Restart Strategy
In the months following FID, we awarded key mining
contracts, transitioned to active mining, commenced
underground development and launched the Blackbeard
exploration program. The Core team transitioned Finniss
from care and maintenance back into active mining
operations in a matter of months, demonstrating the
effectiveness of our restart strategy and the capability
of the team. The staged approach, starting with Grants
open pit mining and processing and followed by BP33
underground development is capital efficient, low risk
and designed to generate early revenue while progressing
toward steady state production.
With funding secured and execution well underway, our focus
is on delivery and meeting operational and development
milestones. We are on track for first spodumene concentrate
shipment from Grants in the December quarter of CY26.
First ore from BP33 underground is targeted for mid-CY27,
with the operation expected to reach steady state of 1.2Mtpa
by mid-CY28.
Safety and Our People
With mining and underground development underway, the
safety of our people remains paramount. As activity across
Finniss continues to increase, maintaining a safe workplace
will remain our highest priority, and we are committed to
maintaining a strong safety culture across all aspects of our
operations. During FY26 we recorded no lost time injuries,
a record that reflects the strong safety culture established
across our workforce and contracting partners.
Community and Sustainability
Having a positive impact on the local community in which
we operate also remains a top priority. As Finniss returns
to operation, we are focused on creating employment and
development opportunities for people in the Northern Territory
and building a highly skilled local workforce to support the
long-term success of the operation. We maintain a close
and constructive relationship with the Northern Territory
Government and we are committed to operating in a manner
that delivers lasting benefits to the region through local
employment, procurement and community engagement.
Lithium Market Outlook
The lithium market continues to experience near-term volatility
as the industry transitions through a period of significant
investment, supply chain adjustment and market rebalancing.
However, the long-term fundamentals remain compelling,
with demand growth expected to be driven by continued
electric vehicle adoption, expanding grid-scale energy
storage capacity and broader global electrification trends.
The strategic importance of securing critical mineral supply
chains continues to increase, particularly in jurisdictions
like Australia that offer a strong regulatory framework and
responsible mining practices. With a permitted, funded and
production-ready asset in Australia, Core is well positioned
to participate in the next phase of lithium market growth.
The milestones achieved so far
reflect the quality of our assets, our
strategic location in the Northern
Territory, the strength of our team, and
the confidence placed in us by our
strategic partners and shareholders.
Core Lithium Annual Report 2026 3
Board Changes
Following Greg English’s retirement from the Board on
30 June, I was honoured to be appointed Chair. Together
with the Board, I want to thank Greg for his leadership
and guidance over a long period. Greg served as Chair for
sixteen years since incorporation and made an enormous
contribution to Core through several periods of significant
transformation and growth, including first ore from Finniss.
During the year, the Board was pleased to appoint Paul Brown
as Managing Director, reflecting the Board’s confidence
in his ability to lead Core through its transition from restart
phase into production and its next phase of growth. We also
welcomed Mark Hine as a Non-Executive Director. Mark
brings more than 35 years of experience in the resources
industry, with extensive underground mining and operational
leadership that will be invaluable as we advance operations
and development at Finniss.
Subsequent to year end, we welcomed Anna Neuling as a
Non-Executive Director and announced the retirement of Heath
Hellewell following 12 years of service to Core. Anna has a
strong finance and mining background and will also assume
the role of Chair of the Audit Committee. Heath’s insights
on the development of Core’s exploration strategy, resource
development and first production have been significant and
we thank him for his contribution and his role as first chair of
the Nomination and Remuneration Committee.
Looking Ahead
In closing, I would like to thank my fellow Directors, our
Managing Director and Chief Executive Officer, Paul Brown,
the senior management team, and all employees for their
dedication and commitment throughout the year. I especially
acknowledge the focus, determination and commitment of the
team in bringing Finniss back into operation and positioning
Core for long-term success.
To our shareholders, thank you for your continued support.
I have great confidence in our leadership team and in the
significant potential of our world-class asset at Finniss. As we
continue to execute our strategy, I look forward to sharing our
progress in the year ahead.
This period of board renewal
strengthens Core’s strategic
capability as we continue to focus
on meeting production milestones,
disciplined cost control and our next
phase of growth.
Malcolm McComas
Non-Executive Chair
Core Lithium Annual Report 2026
4
Core Lithium Annual Report 2026 5
Dear Core shareholders,
I am pleased to report on a year of significant operational and strategic progress for Core. FY26
was a transformational year, culminating in the successful restart of the Finniss Lithium Operation.
Finniss has been repositioned as a lower-cost, de-risked and long-life Australian lithium operation
with strong underlying economics, providing a platform for Core’s next phase of growth as we
transition from restart execution into production.
Funding and Strategic Partnerships
A defining moment of the year was the
approval of the Final Investment Decision
(FID) for the Finniss restart, supported by the
successful execution of a fully funded restart
package. Secured through a competitive,
nine-month process, the funding package
provides the capital required to progress the
operation through the development of BP33
and toward steady-state production, providing
Core with funding certainty through the
development phase regardless of short-term
market conditions. The funding package was
comprised of an A$120m equity raise from
institutional investors and US$120 million
(~A$170 million) from our consortium partners
comprising Glencore Australia Holdings Pty
Limited, InfraVia Capital Partners and Nebari
Natural Resources Credit Fund II, LP. This
included a US$70 million (~A$100 million)
Convertible Note from Glencore and InfraVia,
and a US$50 million (~A$70 million) Senior
Secured Loan from Nebari. Our strategic
partners bring deep expertise across
marketing, project execution and mining
operations. Their long-term support provides
enhanced commercial and financial flexibility,
while providing access to premium global sales
channels. Earlier in the year, we also completed
an A$50 million equity raising to strengthen
our balance sheet and accelerate critical
restart activities.
Managing Director
and CEO’s Letter
To our shareholders, thank you
for your continued support.
We enter the year ahead
with confidence in our team,
our assets and our strategy.
Core Lithium Annual Report 2026
6
Mining
During the year, we awarded two cornerstone contracts
underpinning the Finniss restart. For the Grants open pit,
we awarded an A$50 million surface mining contract to NRW
Pty Ltd for an 11-month period. First blast and excavation
activities have begun, marking the recommencement of
mining at Finniss. Grants is a low-strip, near-term ore source
that supports early revenue generation.
For BP33, we awarded an A$274 million underground mining
contract to Develop Global Limited for a three-year term,
with an option for a two-year extension. BP33 is central
to the long-term Finniss operation, offering more than
10 years of mine life, significant exploration upside, and
low-cost production supported by scale and operating
flexibility. Underground development is underway, with
Develop mobilised to site, the portal cut completed and
underground decline works advancing.
The underground development is progressing alongside
ongoing open pit mining at Grants, with both projects
tracking in line with plan. Our focus remains on the safe
and disciplined execution of the Grants and BP33 mining
operations and development, ensuring delivery on schedule
and within budget. We remain on track for the first spodumene
concentrate shipment in the December quarter. Production
from Grants is expected to generate near-term cash flow,
further strengthening the Company's liquidity position
alongside the secured funding package. Importantly,
Grants cash flows were not included in the sources of funds
underpinning the financing secured to develop BP33 through
to steady-state production.
Logistics
Alongside our mining and development progress, we have
commissioned our logistics and transport chains and put in
place the commercial arrangements to support operations.
The Finniss logistics chain is fully operational, with our first
shipment of 20kt stockpiled lithium fines and 5kt of stockpiled
spodumene concentrate successfully exported via Darwin
Port in June 2026, which was a tangible demonstration of
our operational progress.
Completing the sales of our stockpiled material was part of
a deliberate strategy to generate additional cash and further
enhance our financial flexibility while ramping up operations
at Finniss. During FY26, our total stockpile sales of 5kt
spodumene concentrate and 45kt lithium fines generated
revenues of approximately A$28.5 million. Following year-end,
we completed the sale of the remaining 25kt lithium fines
stockpile, bringing total revenue generated from our stockpile
sales to approximately A$38.5 million.
Another key development was the execution of a marketing
agreement with Glencore. Under the five-year agreement,
Glencore will market and sell all spodumene concentrate
produced by Core, leveraging its global platform while we
retain full flexibility to place offtake and refer customers
directly. This provides Core with complete marketing flexibility,
with all future spodumene concentrate production remaining
available for direct offtake agreements or spot sales.
Core Lithium Annual Report 2026 7
Growth and Portfolio Focus
During the year we sharpened our focus on the Finniss Lithium
Operation. We divested our interests in our non-core uranium
assets – the Napperby, Fitton and Entia Uranium Projects – to
Elevate Uranium Ltd for A$5 million. Core retains a 1% royalty
on any future production from EL31449, which hosts the
Napperby Project, providing additional long-term upside.
We also announced the spin-out of our Northern Territory and
South Australian gold exploration assets into a new gold-
focused ASX-listed exploration company, Axiant Resources
Limited. Core will retain 100% of its lithium rights across these
tenements and retain a meaningful strategic shareholding
in Axiant following completion of the IPO – unlocking value
from non-core assets while keeping the Company focused on
operations and development at Finniss.
On the exploration front, our CY26 program focuses on the
high-priority Blackbeard prospect. Located within 20km of
Finniss, Blackbeard is a high-grade lithium prospect and
represents Core's priority growth opportunity beyond the
current 1.2Mtpa plant capacity. Drilling commenced in the
June quarter, with the primary objective of advancing the
Blackbeard prospect toward a maiden Mineral Resource
Estimate. Complementing this, Core acquired the Bynoe
Lithium tenement from Charger Metals NL, covering
approximately 63km2
of land within the Finniss tenement area
that surrounds the Blackbeard prospect. This acquisition
further strengthens our position within the Bynoe pegmatite
field and consolidates our landholding surrounding
Blackbeard, providing additional exploration upside.
Outlook
We ended the year with a strong cash balance of A$182 million
as at 30 June 2026. With an additional A$103 million of
committed funding and expected receipts, together with
potential early cash flows from Grants, we remain well positioned
and fully funded to support the development of BP33 and the
ramp-up toward production. Disciplined capital allocation
remains a priority as we deploy capital purposefully in support
of our operational milestones and long-term value creation.
The progress made this year reflects the commitment of
our team and the strength of the Finniss assets. We have a
clear pathway to production, a fully funded balance sheet,
world-class strategic partners and a growing resource base.
The work ahead is significant, but so is the opportunity.
I would also like to thank Greg English for his leadership and
guidance over many years at Core. His contribution has been
instrumental in supporting the Board’s strategic oversight and
maintaining disciplined decision-making through a period
of significant transformation for both the Company and the
lithium sector. I also welcome Malcolm McComas as our
new Chair. Having served on the Board as a Non-Executive
Director, he brings a deep understanding of the Company and
the sector, and I look forward to working closely with him as
we continue to execute our strategy.
In closing, I would like to thank our Board, management team
and all my colleagues for their commitment and hard work
throughout the year. To our shareholders, thank you for your
continued support. We enter the year ahead with confidence
in our team, our assets and our strategy, and remain focused
on safely delivering Finniss into production and realising the
full potential of this significant Australian lithium asset.
The progress made this year reflects the commitment
of our team and the strength of the Finniss assets.
Paul Brown
Managing Director and CEO
Core Lithium Annual Report 2026
8
Core Lithium Annual Report 2026 9
Core successfully secured funding
for the Finniss restart through
a diversified financing package
supported by strategic partners and
institutional investors, ensuring
a fully funded restart solution.
Review of
Operations
Core Lithium Annual Report 2026
10
FINNISS PROJECT
PERTH
HEAD OFFICE
N
DARWIN
680,000mE 700,000mE
Lithium Deposit
and Processing Plant
Carlton Lithium Deposit
BP33 Lithium Deposit
Blackbeard Prospect
KILOMETRES
0 20
NORTHERN
TERRITORY
8,620,000mN
8,560,000mN
Core ML
Sealed Road
Road
Gas Pipeline
East Arm Port
Gas Power Plant
310MW
Lithium Deposit
Processing Plant
Highway
Bynoe Pegmatite Field
Rail Road
Pegmatite Prospect
Core EL
FINNISS PROJECT
PERTH
HEAD OFFICE
N
DARWIN
700,000mE
Lithium Deposit
and Processing Plant
Carlton Lithium Deposit
BP33 Lithium Deposit
Blackbeard Prospect
KILOMETRES
0 20
Core ML
Sealed Road
Road
Gas Pipeline
East Arm Port
Gas Power Plant
310MW
Lithium Deposit
Processing Plant
Highway
Bynoe Pegmatite Field
Rail Road
Pegmatite Prospect
Core EL
Figure 1: Finniss Lithium Operation
Overview
The Finniss Lithium Operation (Finniss) comprises more than 500 km2
of highly prospective tenure within the Bynoe Pegmatite Field in the
Northern Territory.
Following the discovery of lithium at Finniss in 2016, Core rapidly defined
a substantial Mineral Resource and developed mining, processing and
associated infrastructure, with more than $250 million invested prior
to the suspension of mining and processing operations in 2024, due to
weak lithium market conditions.
Following completion of a comprehensive Restart Study and optimisation
program in FY25, which focused on reducing costs, improving operating
efficiency and repositioning Finniss as a lower-cost, long-life lithium
operation, the Company secured a fully funded restart package and the
Board approved the Final Investment Decision (FID) on 18 March 20261
.
The improved economics of the operation and a de-risked execution plan
enabled the successful restart of Finniss, with mining and development
activities, including underground development, plant optimisation and
site preparation works, commencing during the year and positioning the
operation for a return to spodumene concentrate production in FY27.
Finniss Lithium Operation
1. Refer to ASX announcement “FID Approved and Funding Secured for Finniss Restart” on 18 March 2026 for further information.
Core Lithium Annual Report 2026 11
FID Approved and Funding Secured
for Restart
The FID to restart operations at Finniss was approved in
March 2026. This was a significant milestone for the Company,
following extensive technical work and engagement with
strategic partners during the year.
The FID followed completion of a comprehensive restart plan,
updated mine planning, front-end engineering and design
work, and refined operating strategies to reposition Finniss as
a lower cost, long life lithium operation.
Core successfully secured funding for the Finniss restart
through a diversified financing package supported by strategic
partners and institutional investors, ensuring a fully funded
restart solution.
The package comprised US$70 million in convertible notes
from entities of Glencore and InfraVia Capital Partners, a
US$50 million senior secured debt facility from Nebari Natural
Resources Credit Fund II and an A$120 million equity raising
from institutional investors.
Core successfully secured funding
for the Finniss restart through
a diversified financing package
supported by strategic partners and
institutional investors, ensuring a fully
funded restart solution.
The raising was designed to accelerate the advancement of
the FID, fund operational readiness activities at Finniss, and
strengthen the balance sheet to support the ongoing strategic
funding process.
FID approval and funding reflect the improved economic
metrics of the restart, as well as the Company’s confidence
in delivering sustained production supported by a de-risked
execution plan.
Restart of Operations
Throughout the restart, Core maintained a focus on safe,
disciplined execution, with operational readiness, contractor
mobilisation and recommissioning activities progressing in line
with the staged restart plan at Grants and BP33.
Grants
Core immediately commenced work on the restart of
operations at the Grants deposit following the FID approval.
An ~A$50 million surface mining services contract was
awarded to NRW in April 2026, and mining operations
subsequently commenced in the June quarter, including
drilling and blasting activities and excavation work.
The incorporation of Grants open-pit mining into the Finniss
mine plan provides a near-term production pathway and
a rapid feed source for the Finniss processing plant, enabling
an accelerated production timeline at a lower initial capital cost.
Alongside mining activities, Core progressed targeted
brownfields modifications to the Dense Media Separation
(DMS) plant to debottleneck the processing circuit and support
improved liberation, recoveries and throughput. During the
June quarter, the Company continued several key initiatives,
including the removal, refurbishment and reinstallation of
the secondary fines separation screens, relocation of the
ferrosilicon distribution pumping and piping system, and
consolidation of the crusher and DMS plant control functions
into a single control room. These upgrades form part of a
broader plan to increase plant capacity from 1.0 Mtpa to
1.2 Mtpa and support improved operating performance.
Following year-end, first spodumene concentrate was
produced at the Finniss processing plant in September
2026, marking a key milestone in the staged restart of the
operation. Plant commissioning and optimisation activities
continue as Finniss progresses towards reliable and sustained
production. Ore from Grants is being processed, with the
first shipment of newly produced spodumene concentrate
targeted for the December quarter. Cash flows from Grants
were not contemplated in the sources of funding for the BP33
development; accordingly, these incremental cash flows will
further strengthen Core’s liquidity position.
Core Lithium Annual Report 2026
12
BP33
Core also commenced construction activities at the BP33
underground mine site following the approval of the FID.
In preparation for the underground development, Core
advanced civil works and box cut remediation at BP33
during the year. Major earthworks included construction
of pads for the power station, ventilation infrastructure
and paste plant. The box cut was dewatered, ramps and
a sump were constructed and ground support installed.
An initial three-year underground mining contract was
awarded to Develop Global in May for decline development
inclusive of ground support, load and haul, drill and blast and
production activities associated with underground mining
activities at BP33. Mobilisation commenced in June 2026
with development activities commencing in parallel. The
Company completed a number of key construction activities,
including the underground miner laydown area, and the
portal cut marking the commencement of underground
development activities. Underground development will
progress in parallel with Grants production, supporting
a staged ramp up and early cash generation at Finniss.
First development ore from BP33 is expected in mid-CY27,
with steady state production targeted for mid-CY28. The
BP33 deposit is central to the Finniss Lithium Operation,
providing a low-cost underground production base with
more than 10 years of mine life, underpinned by a unique
high-grade orebody characterised by a large, continuous
and uniform sub-vertical pegmatite, consistent grade
distribution, minimal internal zoning and favourable
geometry for efficient underground mining.
In addition to commencing mining and underground
development, Core also brought the Finniss logistics chain
back to full operation. This was done through the successful
export of a shipment of 20kt lithium fines and 5kt of stockpiled
spodumene concentrate via Darwin Port in the June quarter.
The shipment represented the successful remobilisation of
Core’s established mine-to-port logistics network, building on
the operational and development progress made at Finniss.
Mid-CY27
Development ore expected
Mid-CY28
Steady-state production targeted
10+ year
Expected mine life
High-grade
Large, continuous pegmatite orebody
Core Lithium Annual Report 2026 13
BURRELL CREEK
FORMATION
NMRD100
34.08m @ 2.09%
Li2
O from 578.70m
NMRD085
90.17m @ 1.80%
Li2
O from 568.83m
FINNISS LITHIUM PROJECT
Cross Section
Looking Northeast
Pegmatite
NMRD100
NMRD085
SOUTHEAST
694,250X 694,500X
TOFR
–250m
0m
–500m
700m
NORTHWEST
Weathered Zone
Natural Surface
2: Geological Cross Section NMRD085 and NMRD100 at BP33
1. Refer to ASX announcement “New High-Grade Lithium Drill Results at BP33” on 11 August 2026.
2. RefertoASXannouncement“UpdatedFinnissLithiumProjectReserveandResource”on14May2025.
Exploration
Core’s exploration program is designed to support the Company’s
broader strategy of resource growth and mine life extension at Finniss,
as well as advancing the development pipeline.
Post year end, Core received high-grade lithium results from the
first exploration diamond drill hole at BP33, NMRD100, including
34.08m @ 2.09% Li2
O from 578.70m and 3.43m @ 2.44% Li2
O from
616.54m1
. NMRD100 was designed to test potential extensions to
mineralisation outside the existing BP33 Mineral Resource Estimate of
10.5Mt @ 1.53% Li2
O and reinforces Core’s confidence in the quality
and continuity of the orebody. Drilling at BP33 is ongoing, with an
additional four holes planned targeting extensions to mineralisation
down dip and along strike from NMRD085 and NMRD100.
Exploration drilling at Blackbeard is underway, with the primary
objective of advancing the Blackbeard prospect toward a maiden
Mineral Resource Estimate.
Core has defined an Exploration Target of 7.0 to 10.0Mt at a grade of 1.5%
to 1.7% Li₂O forthe highly prospective Blackbeard prospect2
. The target
was defined by ten existing RC holes drilled by Core that have provided
encouragement that a large mineralised system may be present.
TheBlackbeardexploration programisastagedandgateddiamond-drilling
campaign totalling 12,150m and forms part of Core’s strategy to expand
and optimise operations at Finniss. Drilling will continue through FY27,
with assay results to be released progressively as received and validated.
Cautionary Statement: The potential quantity and grade of the
Exploration Target is conceptual in nature. There has been insufficient
exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
Core Lithium Annual Report 2026
14
Mineral Resource and Reserve Growth
During FY26, no additional drilling has been undertaken at
Finniss since the Statement of Mineral Resources in September
2025. While mining has recommenced, no resource material
has been mined from within the Grants open pit, as at 30 June
2026. No mining has occurred within the other reported
resource areas as the BP33 decline development has not
impacted mineralisation.
Accordingly, there has been no material change to the Mineral
Resource Estimate and the in situ Mineral Resources are
consistent with those previously reported by Core.
An updated Grants Ore Reserve Estimate was announced on
10 November 2025, increasing by 33.0% to 1.53Mt @ 1.42%
with a 44% increase in contained metal to 22kt Li2
O.
The total Finniss Ore Reserves
increased by 3% to 15.6Mt @ 1.27%,
with a 3% increase in contained metal
to 198kt Li2
O with the increase of the
Grants Ore Reserve1
.
Corporate
Sale of Lithium Fines and Stockpiles
Core monetised its existing stockpiled material generating
significant cash flow during the financial year while mining
and development activities at Finniss progressed.
During the period, the Company completed the sale of its
remaining spodumene concentrate stockpile at Finniss to
Glencore International AG.
This was followed by three sales of stockpiled lithium fines
to Glencore. The first sale, comprising 20,000 tonnes, was
completed in April 2026 at a base price of US$290/t (~A$405/t)
CIF. A second sale of 25,000 tonnes was completed in
June 2026 at a base price of US$270/t (~A$375/t) CIF. The
final sale, comprising the remaining 25,000 tonnes, was
completed in September 2026 at a base price of US$285/t
(~A$400/t) CIF, with proceeds expected to be received in the
December quarter. Core generated incremental revenue of
~A$38.5 million from total lithium sales in CY26.
The strategic sale of the stockpiles provided important
additional cash flows to support the operation and also
allowed the remobilisation of Core’s logistics chain from
the site through to Darwin Port.
Consolidation of Tenements to Focus on Lithium
During FY26, Core refocused its operations and capital allocation
on its primary business operations at Finniss and the exploration
and development of its other lithium assets. As a result, the
Company consolidated its lithium tenements and commenced
a process to dispose of non-core exploratio