June Quarter FY26 Presentation
15 July 2026
ASX:CXO
IMPORTANT AND CAUTIONARY NOTES
This presentation has been prepared by Core Lithium Ltd (“Core”, “Company”) and provides a general
overview of the Company and its strategy.
This presentation does not purport to be all-inclusive or to contain all the information that you or any
other party may require to evaluate the prospects of the Company. None of the Company, any of its
related bodies corporate or any of their representatives assume any responsibility for, or makes any
representation or warranty, express or implied, with respect to the accuracy, reliability or completeness
of the information contained in this presentation and none of those parties have or assume any
obligation to provide any additional information or to update this presentation. The information in this
presentation should be read in conjunction with Core’s other periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange (ASX), which are available at
www.asx.com.au.
To the fullest extent permitted by law, the Company, its respective affiliates and representatives, related
bodies corporate, officers, employees, partners, agents and advisers make no representation or
warranty (express or implied) as to the currency, accuracy, reliability, reasonableness or completeness of
the information in this presentation and expressly disclaims all responsibility and liability for any loss or
damage arising in respect of your reliance on the information contained in this presentation (including
your reliance on the accuracy, completeness or reliability of that information), or any errors in or
omissions from this presentation, including any liability arising from negligence.
The Finniss Lithium Operation as described in this presentation as being in a state of operational
readiness, and potential investors should understand that mineral exploration, development and mining
are high-risk undertakings. There is no guarantee that the Finniss Lithium Operation can be
economically exploited in the future.
This document contains statements which may be in the nature of forward-looking statements. No
representation or warranty is given, and nothing in this presentation or any other information made
available by the Company or any other party should be relied upon as a promise or representation, as to
the future condition of the respective businesses and operations of the Company.
Competent Person Statements
The Mineral Resources and Ore Reserves underpinning the production target and forecast financial
information in this announcement have been prepared by competent persons in accordance with the
requirements of the JORC code.
Core confirms that it is not aware of any new information or data that materially affects the exploration
results, exploration target, mineral resource estimate and ore reserve estimate included in this
announcement as cross referenced in the body of this announcement and that all technical parameters
underpinning the Mineral Resources, Ore Reserves, production target and forecast financial information
derived from the production target continue to apply and have not materially changed. The
announcement references the previously reported Mineral Resource Estimates and Ore Reserve
Estimates; “Finniss Mineral Resource Increased by 58%” on 11 April 2024, “Lithium Ore Reserve Updated”
on 25 September 2024, “Updated Finniss Lithium Operation Reserve and Resource” on 14 May 2025,
“Updated Ore Reserve at Carlton” on 10 September 2025 and “Updated Grants Mine Plan and Ore
Reserve” on 10 November 2025. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original
announcements related to previously reported exploration results, exploration target, Mineral Resource
Estimates and Ore Reserve Estimates.
Currency
Unless otherwise stated, all cashflows are in Australian dollars, are undiscounted and are in real terms
(not subject to inflation/escalation factors).
Forward‐looking Statements
Generally, this forward-looking information can be identified by the use of forward-looking terminology
such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’,
’could’, ’should’, ’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this
release are cautioned that such statements are only predictions, and that the Company’s actual future
results or performance may be materially different. Forward-looking information is subject to known
and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of
activity, performance or achievements to be materially different from those expressed or implied by
such forward-looking information. Forward-looking information is developed based on assumptions
about such risks, uncertainties and other factors set out herein, including but not limited to general
business, economic, competitive, political and social uncertainties; the actual results of current
exploration, development and construction activities; conclusions of economic evaluations; changes in
project parameters as plans continue to be refined; future prices of lithium; possible variations of ore
grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accident,
labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals
or financing or in the completion of development or construction activities. This list is not exhaustive of
the factors that may affect forward-looking information. These and other factors should be considered
carefully, and readers should not place undue reliance on such forward-looking information. The
Company disclaims any intent or obligations to or revise any forward-looking statements whether as a
result of new information, estimates, or options, future events or results or otherwise, unless required to
do so by law. Statements regarding plans with respect to the Company’s mineral properties may contain
forward-looking statements in relation to future matters that can be only made where the Company has
a reasonable basis for making those statements.
Past Performance
Past performance information given in this presentation is given for illustrative purposes only and
should not be relied upon as (and is not) an indication of future performance.
2
3
JUNE QUARTER HIGHLIGHTS
Momentum building with key operational milestones delivered
Corporate
> Strong financial position with
$182 million of cash at 30
June 2026, along with $138
million committed funding
and expected receipts1
> Commenced offtake process,
exploring ways to leverage
an unencumbered offtake
position
> Sharpened focus with plans
to divest gold and non-
lithium exploration assets via
IPO of Axiant Resources
Limited
Operations
> All major mining contracts
awarded for Grants open pit
(Grants) and BP33
development
> Mining commenced at Grants
> Underground development at
BP33 advancing
> Plant upgrades ongoing
ahead of recommissioning in
September quarter
> Recruitment of operational
personnel tracking to plan
Logistics
> Commissioned and fully
operational logistics chain
from site to customer
> First shipment of stockpiled
lithium fines and concentrate
out of Darwin Port
> Stockpile sales for 45kt of
lithium fines, with ~30kt
remaining available for sale
Growth
> Blackbeard exploration
program commenced
> Successful definition of a
Mineral Resource at
Blackbeard may support
potential growth pathways
beyond the current 1.2 Mtpa
plant capacity
> Strengthened Finniss
tenement package with
agreement to acquire Lithium
tenement (EL30897)
Refer to the Company's ASX announcement titled “Quarterly Activities and Cashflow Report” dated 15 July 2026 for further information
1. Committed funding and expected receipts include funds not yet received from the second tranche of the Convertible Notes, subject to FIRB approval, the first tranche of the senior secured loan, which has not yet been received and
proceeds from the second fines sales not yet received at 30 June 2026.
4
FINNISS LITHIUM OPERATION
Near-term
production while
development
progresses
> First shipment of newly produced product from Grants on track for December
quarter providing near term cash flows in addition to funding package
> Existing DMS plant being recommissioned, reducing development and execution
risk
> Plant upgrades underway to increase capacity from 1.0Mtpa to 1.2Mtpa
> 214ktpa SC6 equivalent steady state production profile from BP33
Fully funded, low
cost operations
> Fully funded through to steady state production; on track for 2028.
> Strong liquidity position supported by additional near-term cash flows
> Competitive steady state operating costs of ~$762/t FOB (excluding royalties) with
estimates supported by third party due diligence and contracting process
> Low-cost operating model supported by 100% infrastructure ownership
Tier 1 location
with existing
infrastructure
advantage
> Fully permitted asset in the Northern Territory, ~88km from Darwin Port
> Existing infrastructure lowers capital intensity and development risk
> Close proximity to key Asian and Middle Eastern export markets
High quality asset
with attractive
product
characteristics
> Production of highly desirable, low-impurity, coarse-grained spodumene
concentrate.
> Unique ore body at BP33; large single structure, vertically dipping ore body
> Long-life operation with a 20 year mine life
> Experienced lithium management team with demonstrated delivery capability
Scalable platform
for growth
> Existing crushing capacity of more than 2Mtpa supports future growth
> 15.6Mt of Ore Reserves with further upside potential
> Carlton reserve base provides a clear production expansion pathway
> Blackbeard exploration target may provide alternative pathway
> Multiple long-term growth opportunities without requiring significant new
infrastructure
A low cost, long life operation - strategically located and fully funded to production
Refer to the Company's ASX announcements titled "Finniss Funding and Restart Presentation" dated 18 March 2026 and “FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026 and “Quarterly Activities and Cashflow Report” dated
15 July 2026 for further information 2. Core has agreed to acquired the Bynoe Lithium tenement EL30897 as shown on the map however transfer of the tenement had not been completed as at quarter end. Refer to the Company’s ASX announcement
titled “Exploration Program Commenced and Bynoe Tenement Acquired” dated 19 June 2026
2
Funding
and FID
Key mining
contracts for
Grants mining
and BP33
development
awarded
18 March
2026
Q2
CY2026
Q2
CY2026
Q3
CY2026
CY2026-
CY2027
Mid
CY2027
Mid
CY2028
Grants open
pit mining
commenced
BP33
underground
decline
development
commenced
Plant re-
commissioning
BP33 pre-
production
mining
development
BP33
underground
first
development
ore
BP33 reaches
steady state
production
of1.2Mtpa
5
ON TRACK FOR STEADY STATE PRODUCTION IN 2028
Moving from funding and mobilisation into execution and staged operational ramp-up
Illustrative purposes only. Timing is based on current estimates to complete scheduled work and remains subject to change and various conditions (including on-time delivery by counterparties)
Refer to the Company's ASX announcements titled "Finniss Funding and Restart Presentation" dated 18 March 2026 and FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026 and “Quarterly Activities and Cashflow Report” dated
15 July 2026 for further information
First
concentrate
shipment
from Grants
Q4
CY2026
GRANTS
Significant progress made at Grants open pit since FID
April 2026
Dewatering and preparation of Grants open pit
ahead of recommencement of mining
June 2026
Mining ongoing
May 2026
Mining commenced
6
April 2026 June 2026
MINING UNDERWAY AT GRANTS
> Grants provides a low-strip, near-term ore source supporting early
cash generation in addition to funding package sources
> Mining underway following award of 11-month surface mining
contract at Grants to NRW Pty Ltd1
> Optimised open pit provides access to approximately 784kt of ore
within the existing open pit
> Expected to deliver approximately 134kt of SC5 product2
> Provides a near-term cashflow opportunity with first shipment
targeted for December quarter
> Flexibility with processing and shipment timing pending market
conditions
7
1. Refer to the Company’s ASX announcement titled “Core Commences Mining Operations at Finniss" dated 20 May 2026
2. Refer to the Company’s ASX announcement titled “FID Approved and Funding Secured for Finniss Restart” dated 18 March 2026
Commencement of mining a key milestone in the restart of Finniss
Mining activities at Grants open pit (top). Grants open pit site overview (bottom)
8
1. Refer to the Company's ASX announcements titled “Restart Study Repositions Finniss Operations” dated 14 May 2025, "Updated Grants
Mine Plan and Ore Reserve" dated 10 November 2025 and "FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026
for further information
2. Refer to the Company’s ASX announcement titled “Quarterly Activities and Cashflow Report” dated 15 July 2026 for further information
> Plant upgrades aligned to mine plan, increasing plant throughput to 1.2Mtpa from
1.0Mtpa1
> Targeted brownfields modifications planned to improve liberation and overall
recovery
> Staged plan to debottleneck and enhance plant performance:
> Screens, floats crusher and tails thickener upgrades
> Inclusion of reflux gravity classifier circuit improves recoveries, while
maintaining simplicity
> DMS plant upgrades completed in June quarter2:
> Refurbishment of secondary fines screens
> Relocation of ferrosilicon distribution pumping and piping system
> Consolidation of crusher and DMS plant into a single control room
> Existing plant with proven operating history, delivering ~65% recovery during prior
operations
> Improved mining hygiene and lower dilution are expected to further support
improved recovery
Finniss DMS plant (top). Secondary DMS screen lifted out for refurbishment upgrade (bottom)
PROCESSING PLANT UPGRADES
Targeted upgrades to improve performance underway - processing commencing in the September quarter
9
SIGNIFICANT PROGRESS AT BP33 PROJECT
Box cut dewatering and remediation progressed ahead of portal cut
March 2026 May 2026 June 2026
Portal cut
Remediation
Dewatering
1. Refer to the Company's ASX announcements titled "BP33 Underground Portal Commencement and First Shipment" dated 22 June 2026
> Underground mining contract awarded to
Develop Global Ltd (ASX:DVP), for a term of
three years, plus option for a two-year
extension1
> BP33 contract award validates the restart
capital and mining cost estimates2
> Mobilisation complete, with underground
development commencing in June 2026
with portal cut3
> BP33 provides lower capex, low-cost
underground production base
> BP33 is a long life operation with more than
10 years of mine life and significant
exploration upside
10
1. Refer to the Company's ASX announcement titled "Core Awards BP33 Underground Mining Contract at Finniss" dated 13 May 2026.
2. Refer to the Company's ASX announcement titled "FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026.
3. Refer to the Company's ASX announcement titled "BP33 Underground Portal Commencement and First Shipment" dated 22 June 2026.
EXECUTING ON BP33 PROJECT
Rapid rate of development execution with underground development commenced
182
285
193
103
35 3
127
320
11
FULLY FUNDED FOR PRODUCTION
Strong liquidity position and additional funding available through to production
1. Cash balance as of 30 June 2026 2. Committed funding and expected receipts includes funds not yet received from the second tranche of the Convertible Notes, subject to FIRB approval, the first tranche of the senior secured loan, which has not yet been
received and proceeds from the fines sales not yet received. 3. Undrawn facilities includes undrawn senior secured loan (tranche 2). Refer to the Company's ASX announcements titled "Finniss Funding and Restart Presentation" dated 18 March 2026 and
“FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026 for further information. 4. Potential Grants cash flows are excluded from the Sources of Funding and are shown for illustrative purposes only and do not represent actual or
forecast financial performance.
> Ample available funds to fund development through to
steady state production
> $193 million of restart capital with contingency remaining
with $320 million of available sources including cash,
secured funds and undrawn facilities
> Available sources does not include any cash flows
generated from Grants near-term production of ~134kt SC5
product which may further strengthen liquidity buffer4
> Major contract awards in the June quarter were in line with
expectations and support restart capital estimates
320
Cash
balance
30 June 261
Committed
funding and
expected
receipts2
Available
sources incl.
undrawn
facilities3
Restart
capital
remaining
Liquidity
buffer
$M
Restart
capital
Liquidity
buffer
12
1. Refer to the Company's ASX announcement titled “New high-grade Lithium drill results within 20km of the Grants processing facility” dated 6 November 2024 for further
information.
2. Refer to the Company's ASX announcement titled “Significant Increase to Finniss Mineral Resources” dated 18 April 2023 for further information.
3. Refer to the Company's ASX announcement titled “Updated Finniss Lithium Project Reserve and Resource” dated 14 May 2025 for further information.
> 2026 exploration program commenced targeting the Blackbeard prospect
> Objective to progress Blackbeard toward a maiden Mineral Resource Estimate
over the course of CY2026
> Total planned diamond drilling of 12,150 metres
> Drilling is expected to be completed during the September quarter, with assay
results to be released progressively as received and validated
> Blackbeard is a high-grade lithium prospect within 20km of existing processing
infrastructure, located on a Mining Lease (MLN1148)
> Previous excellent exploration results:
> 63m @ 1.67%Li2O, including 20m @ 2.09% Li2O from 208m (NRC269)1
> 41m @ 1.63% Li2O (SRC117)2
> 59m @ 1.54% Li2O (SRC118)2
Blackbeard Exploration results and associated Exploration target from ASX
announcement dated 14 May 2025 showing planned drilling3.
Drilling program commenced targeting a maiden MRE at highest priority growth prospect, Blackbeard
FINNISS EXPLORATION UPSIDE
The Exploration Target is supported by historical drilling, trenching & exploration results. The potential
quantity & grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Mineral Resource & it is uncertain if further exploration will result in the estimation of a Mineral
Resource.
PRODUCTION EXPANSION POTENTIAL1,2
Resource growth and potential for plant expansion support increasing scale over time
1.0Mt 1.0Mt
1.2Mt
214kt
2026 2027 2028 2029 2030 2031
13
The Exploration Target is supported by historical drilling, trenching &
exploration results. The potential quantity & grade of the Exploration
Target is conceptual in nature. There has been insufficient exploration
to estimate a Mineral Resource & it is uncertain if further exploration
will result in the estimation of a Mineral Resource4
Plant Throughput Capacity (Mt)
Throughput
Potential Throughput Expansion Indicative Spodumene Concentrate Output
1. The potential production upside is indicative only. The pathway is subject to technical and financial studies, regulatory approvals, funding, market conditions and the development of new mining operations. Factors relating to these matters remain uncertain. The pathway
represents an aspiration and is not intended to be a production target, forecast, projection or guidance. The statements relating to the potential production upside are aspirational statements only (and not production targets), and the Company does not have reasonable
grounds to believe this can be achieved. These statements are of an aspirational nature and are dependent on several factors, including exploration success, ore reserves and mineral resource definition
2. Refer to the Company's ASX announcements titled "Restart Study Repositions Finniss Operations" dated 14 May 2025, "Updated Grants Mine Plan and Ore Reserve" dated 10 November 2025 and "FID Approved and Funding Secured for Finniss Restart" dated 18 March 2026 for
further information
3. Refer to the slides titled "Important and Cautionary Notes" and Appendix 2 of this presentation for further information regarding the Ore Reserves
4. Refer to the Company's ASX announcement titled “Updated Finniss Lithium Project Reserve and Resource” dated 14 May 2025 for further information regarding the exploration target
5. Refer to the Company’s ASX announcement titled “Updated Ore Reserve at Carlton” dated 10 September 2025 for further information
>2Mtpa crushing capacity supports a pathway to
lift plant throughput above 1.2Mtpa with incremental
plant upgrades
Expansion plan could leverage >15Mt ore reserve base
with key deposits open at depth
High-grade drilling results at Blackbeard provide
a potential key catalyst for expansion
Carlton Reserve: 4.5Mt @ ~1.2%3,5
Blackbeard exploration target: 7-10Mt at 1.5-1.7%4
Blackbeard exploration target provides potential project
development optionality
14
EXECUTING TO PLAN
Significant progress made in June quarter with operational momentum building
BP33 site overview
Major mining and
BP33 civils and
infrastructure
contracts in place
Mobilisation
complete and
operations and
development
underway
Near-term Grants
production and cash
generation not
contemplated in
funding package
Fully funded
through to steady
state production at
BP33 with strong
liquidity buffer
Pathways to
potential resource
and production
expansion
CONTACT
Core Lithium Ltd
Level 4, 186 St Georges Terrace,
Perth WA 6000
info@corelithium.com.au
Investor Enquiries
Paul Brown
Managing Director
+61 8 8317 1700
Media Enquiries
Cameron Morse
FTI Consulting
+61 433 886 871
This presentation has been approved for release by
the Core Lithium Board
16
APPENDIX 1 – JORC MINERAL RESOURCE ESTIMATE
Note: Totals within this table are subject to rounding
Refer to the Company's ASX announcement titled “Finniss Mineral Resource Increased by 58%” on 11 April 2024 and “Updated Finniss Lithium Project Reserve and Resource” dated 14 May 2025 for further information
Refer to the Company's ASX announcement titled “Updated Grants Mine Plan and Ore Reserve“ dated 10 November 2025 for further information
TSF/Stockpiles balance includes 20kt of lithium fines sold during the June quarter
Mineral Resource
Measured Indicated Inferred Total
Tonnes
(Mt)
Li2O%
Li2O
Contained
Metal (kt)
Tonnes
(Mt)
Li2O%
Li2O
Contained
Metal (kt)
Tonnes
(Mt)
Li2O%
Li2O
Contained
Metal (kt)
Tonnes
(Mt)
Li2O%
Li2O
Contained
Metal (kt)
Grants 1.34 1.48 19.8 0.61 1.49 9.1 0.37 1.27 4.7 2.32 1.45 33.6
BP33 2.85 1.44 41.0 6.51 1.55 101 1.14 1.59 18.1 10.5 1.53 161
Carlton 2.14 1.33 28.5 3.43 1.32 45.3 0.78 1.14 8.9 6.34 1.3 82.6
Lees - - - 4.16 1.18 49.1 7.08 1.12 79.3 11.2 1.14 128
Ah Hoy - - - 1.71 1.2 20.5 2.93 1.38 40.4 4.64 1.31 60.8
Booths - - - 1.84 0.99 18.2 1.4 1.06 14.8 3.24 1.02 33
Penfolds - - - 0.65 1.25 8.1 0.71 1.24 8.8 1.36 1.24 16.9
Hang Gong - - - 1.51 1.18 17.8 1.95 1.14 22.2 3.46 1.16 40.1
Sandras - - - 1.17 0.92 10.8 0.57 0.82 4.7 1.73 0.89 15.4
Bilatos - - - - - - 1.92 1.03 19.8 1.92 1.03 19.8
Seadog - - - - - - 1.41 1.18 16.6 1.41 1.18 16.6
Total 6.33 1.41 89.3 21.6 1.3 282 20.3 1.18 239 48.2 1.26 608
TSF/Rejects - - - 0.31 0.66 2 - - - 0.31 0.66 2.0
Total 6.33 1.41 89.3 21.9 1.29 283 20.3 1.18 239 48.5 1.26 610
17
APPENDIX 2 – JORC ORE RESERVE ESTIMATE
Deposit Category
Ore Tonnes
(Mt)
Li2O (%)
Contained
Li2O (kt)
BP33
Underground
Proved 2.6 1.27 32
Probable 6.7 1.32 89
Total 9.3 1.31 121
Grants
Proved 1.2 1.43 17
Probable 0.3 1.41 5
Total 1.5 1.42 22
Carlton
Proved 1.7 1.19 20
Probable 2.8 1.19 34
Total 4.5 1.19 53
TSF/Stockpiles
Proved - - -
Probable 0.3 0.68 2
Total 0.3 0.68 2
Total
Proved 5.1 1.28 69
Probable 10.1 1.27 129
Total 15.6 1.27 198
Notes
1. Effective date of the Grants Ore Reserves is 30 October 2025.
2. Effective date of the Carlton Ore Reserves is 5 September 2025 (“Updated Ore Reserve
at Carlton” released on 10 September 2025).
3. Effective date of the BP33 and TSF/Stockpiles Ore Reserves is 30 April 2025. (“Updated
Finniss Lithium Project Reserve and Resource” released on 14 May 2025)
4. Ore Reserve Estimates are the total for the Grants, BP33, TSF/Stockpiles and
Carlton Mines.
5. The long-term SC6 Spodumene price used for calculating the financial analysis is
US$1,330/t. The financial analysis has been estimated with assumptions for crushing,
processing and treatment charges, deductions and payment terms, concentrate
transport, metallurgical recoveries, and royalties.
6. The breakeven cut-off Net Smelter Return (NSR) for underground mining at BP33 and
Grants Underground is $110/t NSR and $125/t NSR for Carlton Underground. The
cutoff grade used for estimating Ore Reserve Estimate at Grants Open pit was 0.8%.
7. Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated
Mineral Resources were used to estimate Probable Ore Reserves.
8. Tonnage and grade estimates include dilution and recovery allowances.
9. The tonnage and grade for TSF/Stockpile is estimated from the operations reconciled
historic monthly production records.
10. The Reserves are defined at the point where the ore is delivered to the
processing plant.
11. The Ore Reserves reported above are not additive to the Mineral Resources.
12. Totals within this table are subject to rounding.
13. TSF/Stockpiles balance includes 20kt of lithium fines sold during the June quarter