Quarterly Report Presentation
Released
Released
Announcement PDF
AUSTRALIA’S NEWEST
LITHIUM MINER
4Q FY23 quarterly update
Gareth Manderson (CEO)
24 July 2023
corelithium.com.au | ASX CXO
IMPORTANT & CAUTIONARY NOTES
This presentation has been prepared by Core Lithium Ltd (“Core”, “Company”) and
provides a general overview of the Company and its strategy.
This presentation does not purport to be all-inclusive or to contain all the
information that you or any other party may require to evaluate the prospects of
the Company. None of the Company, any of its related bodies corporate or any of
their representatives assume any responsibility for, or makes any representation or
warranty, express or implied, with respect to the accuracy, reliability or
completeness of the information contained in this presentation and none of those
parties have or assume any obligation to provide any additional information or to
update this presentation. The information in this presentation should be read in
conjunction with Core’s other periodic and continuous disclosure announcements
lodged with the Australian Securities Exchange (ASX), which are available at
www.asx.com.au.
To the fullest extent permitted by law, the Company, its respective affiliates and
representatives, related bodies corporate, officers, employees, partners, agents
and advisers make no representation or warranty (express or implied) as to the
currency, accuracy, reliability, reasonableness or completeness of the information
in this presentation and expressly disclaims all responsibility and liability for any
loss or damage arising in respect of your reliance on the information contained in
this presentation (including your reliance on the accuracy, completeness or
reliability of that information), or any errors in or omissions from this presentation,
including any liability arising from negligence.
The Finniss Lithium Project as described in this presentation is at the production
stage, and potential investors should understand that mineral exploration,
development and mining are high-risk undertakings. There is no guarantee that the
Finniss Lithium Project can be economically exploited.
This document contains statements which may be in the nature of forward-looking
statements. No representation or warranty is given, and nothing in this
presentation or any other information made available by the Company or any
other party should be relied upon as a promise or representation, as to the future
condition of the respective businesses and operations of the Company.
Competent Person Statements
Core confirms that it is not aware of any new information or data that materially
affects the information included in previous announcements (as may be cross
referenced in the body of this announcement) and that all material assumptions
and technical parameters underpinning the Mineral Resource estimates, Ore
Reserve estimates, production targets and forecast financial information continue
to apply and have not materially changed. This release contains “forward-looking
information” that is based on the Company’s expectations, estimates and
projections as of the date on which the statements were made. This forwardlooking information includes, among other things, statements with respect to
feasibility studies, the Company’s business strategy, plan, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations,
and Mineral Resources and Reserves.
Currency
Unless otherwise stated, all cashflows are in Australian dollars, are undiscounted
and are in real terms (not subject to inflation/escalation factors), and all years are
calendar years. C1 Operating Costs references in USD throughout this presentation
have been derived by converting AUD using an exchange rate of 0.70 AUD/USD.
Forward‐looking Statements
Generally, this forward-looking information can be identified by the use of forwardlooking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘likely’,’
believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’, ’scheduled’,
’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this release
are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking
information is subject to known and unknown risks, uncertainties and other factors
that may cause the Company’s actual results, level of activity, performance or
achievements to be materially different from those expressed or implied by such
forward-looking information. Forward-looking information is developed based on
assumptions about such risks, uncertainties and other factors set out herein,
including but not limited to general business, economic, competitive, political and
social uncertainties; the actual results of current exploration, development and
construction activities; conclusions of economic evaluations; changes in project
parameters as plans continue to be refined; future prices of lithium; possible
variations of ore grade or recovery rates; failure of plant, equipment or processes
to operate as anticipated; accident, labour disputes and other risks of the mining
industry; and delays in obtaining governmental approvals or financing or in the
completion of development or construction activities. This list is not exhaustive of
the factors that may affect forward-looking information. These and other factors
should be considered carefully, and readers should not place undue reliance on
such forward-looking information. The Company disclaims any intent or obligations
to or revise any forward-looking statements whether as a result of new
information, estimates, or options, future events or results or otherwise, unless
required to do so by law. Statements regarding plans with respect to the
Company’s mineral properties may contain forward-looking statements in relation
to future matters that can be only made where the Company has a reasonable
basis for making those statements.
Past Performance
Past performance information given in this presentation is given for illustrative
purposes only and should not be relied upon as (and is not) an indication of future
performance.
corelithium.com.au |
2
CORE – OUR VALUE PROPOSITION
1
Achieved first production in under five years from maiden resource discovery by pursuing a ‘Minimum Viable Project’ strategy
Leveraged to strong near-term pricing – Australia’s newest producing lithium mine which is located 88km from Darwin Port
2
3
4
6
Currently operating the Grants open pit which is our starter operation. BP33 is the cornerstone asset for Core which is targeting a Final
Investment Decision in Q1 2024
6
Track record of exploration success – the Finniss Mineral Resource has increase by 62% since July 2022 to 30.6Mt @ 1.31% Li2O
Attractive pipeline of greenfield and brownfield exploration opportunities in the Finniss mineralised district
5
Secured offtake with some of the world’s largest battery companies, including Ganfeng Lithium and Yahua
Strong balance sheet today, including $152.7 million of cash and nil debt
Refreshed senior management team who have strong experience in developing and operating resources projects
corelithium.com.au |
3
Q4 FY23 HIGHLIGHTS
O P E R AT I O N S
SALES &
MARKETING
• Quarterly spodumene production of 14,685t (FY23: 18,274t)
• C1 unit cost of A$902/t (FY23: $1,230/t)
• Maiden 5,500t spodumene concentrate shipment in April and second
13,100t shipment in early July1
• 5,423dmt spodumene concentrate sales @ average 5.35% Li2O
• $45-$50 million approved for BP33 underground mine early works
E X P L O R AT I O N &
DEVELOPMENT
• Revised BP33 feasibility study underway, including incorporation of
the increased Mineral Resource
• Total Finniss Mineral Resource increased 62% to 30.6Mt @1.31%
Li2O 2
• A$25m exploration program underway
• Cash balance of $152.7 million and no debt (as at 30 June 2023)
C O R P O R AT E &
FINANCIAL
• Andrea Hall appointed as Non-Executive Director
• Executive team complete following the appointments of Pierre
Malan as EGM Development & Exploration and Paul Benjamin as
EGM Commercial & Marketing1
• No significant safety incidents
SAFETY &
S U S TA I N A B I L I T Y
NOTES
1. Subsequent to June quarter end.
• Critical Risk Management (CRM) Program Implemented
• Community grants awarded to 12 community groups across greater
Darwin region
corelithium.com.au |
2. Refer “Significant Increase to Finniss Mineral Resources released on 18 April 2023. Core Lithium confirms that the Company is not aware of any new information or data that materially affects the Mineral Resource
Estimates cross referenced in this report and confirms that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
4
FINNISS OPERATIONAL UPDATE
Ramp up continuing to progress with maiden spodumene concentrate shipment departing Darwin port during the quarter
Management commentary
Quarterly Operating Performance
• Core achieved total spodumene production of 14,685 tonnes at a 5.35% Li2O
grade with products meeting customer specification
• Mining performance remained below expected levels during the quarter
due in part to further inclement weather in April
− Upgraded dewatering equipment installed in the pit which enabled the
successful discharge of water and allowed mining to continue
• Mining conditions in weathered material has led to adjustments to the mine
design and plan, including shallower angled walls in the pit
• Wall stability monitoring continues with the addition of drilling horizontal
bores to depressurise walls and contribute to wall stability
• Work continues to focus on improving mining rates as ramp-up continues.
Access to ore at the base of the pit has improved now that the wet season
has ended
• A review of the recent wet season has resulted in $11 million in capital
invested to date to improve water management infrastructure. Work has
commenced on these projects
Q3 FY23
Q4 FY23
tonnes
3,589
14,685
%
47.4
48.6
DSO Shipments
tonnes
14,774
-
Spodumene Concentrate Shipments
tonnes
-
5,423
%
n/a
5.35%
C1 Cost
A$/t FOB
2,188
902
C1 cost plus royalties
A$/t FOB
2,323
1,416
A$/t
(5,594)
(1,176)
Production
Spodumene concentrate produced
Recovery
Sales
Concentrate grade shipped
Cost of production
Deferred stripping costs (non-cash)
corelithium.com.au |
5
FINNISS OPERATIONAL UPDATE (CONT.)
The Finniss plant has operated for 14 weeks (on a campaign basis)
Management commentary
Spodumene concentrate production (kt) vs recovery (%, RHS)
• The plant had its second quarter in operation following construction
completion and first concentrate produced in February 2023 and remains in
the ramp up phase
8,000
7,000
• Given reduced ore availability following the mining interruption in Q3 FY23,
the plant was run largely on a campaign basis when ore was available
6,000
• Spodumene concentrate produced was on specification and ranged in grade
between 5.4% and 5.6%
5,000
− However, as is not uncommon during the start-up phase, recoveries have
been lower than the original test work predicted, averaging 49% for the
quarter
4,000
− Work is underway to determine why recoveries are lower than expected,
it appears to be a result of a greater proportion of fines than anticipated
− Peers in the lithium space have demonstrated an ability to improve plant
recoveries over time
• As at 30 June there was 7,598 tonnes of stockpile on the ROM pad
50%
49%
48%
47%
3,000
2,000
46%
1,000
-
45%
Feb-23
Mar-23
Apr-23
May-23
Jun-23
Safe access to the pit was achieved in late March
with mining activity commencing shortly afterwards
corelithium.com.au |
6
FINNISS PERFORMANCE IMPROVEMENT INITIATIVES
Several short to medium term improvement projects are underway to optimise operations and enhance recoveries
Improvement projects and fines sales
• The Finniss plant has run for 14 weeks on a campaign basis, but has
provided the first opportunity to performance test and trial processing
parameters
• A range of trials and improvement projects have been identified to
increase lithia recoveries and plant utilisation
• The potential for lithium fines to become a saleable by-product has
been identified to help address lower recoveries in the near-term
• Several other near-term projects have commenced during the quarter
which are designed to minimise fines and increase recoveries
• The feasibility of longer-term projects such as the installation of fines
processing circuit, filter press and belt press will be evaluated in FY24
Improvement projects
✓
Trial sales of fines product (underway)
✓
Screen size trials ahead of the crusher (underway)
Reagent timing and volume adjustments
Met testwork to inform choice of crushed feed size distribution
Commission mica classifier
Study feasibility of installing a filter or belt press
Feasibility of installing a full flotation circuit to increase recoveries
Assess merits of selling DSO when there are bottlenecks at the plant
corelithium.com.au |
7
FY2024 GUIDANCE
80,000 – 90,000 tonnes
Core provides its first guidance as an operator
Spodumene concentrate production
• FY24 production guidance is between 80,000t and 90,000t of spodumene concentrate at a
C1 cost of between $1,165 to $1,250 per tonne1
– Key drivers of lower production vs study estimates are lower recoveries, a revised mine
plan with a layback of the pit walls, and wet season mining assumptions
– Additionally, Core expects FY24 to include the potential to produce and sell c. 85,000 to
95,000t of fines2 at a grade of ~ 1% Li2O at no incremental mining or processing costs
• With respect to FY25, Core expects monthly mining and processing rates to be above FY24
levels. However, production in FY25 is expected to be below FY24 due to a three-month gap
in ore feedstock supply from the mine and processing plant capacity constraints result in a
ROM pad stockpile building at the conclusion of FY25
– Core is evaluating options to process and sell product from these stockpiles
90,000 – 100,000 tonnes
Concentrate sales
85,000-95,000 tonnes
Fines sales2
A$1,165 - 1,250/t
C1 cash costs
A$20 – 25 million
Site sustaining capital
– FY25 production outlook currently assumes no ore from BP33
• Finniss sustaining capital of A$20 – 25 million for water management civil work, port storage
building upgrade, ROM extension and haul roads
A$45 – 50 million
Deferred waste stripping
• Exploration expenditure to define, extend and discover new resources
• BP33 remains on track for a Final Investment Decision in 1Q CY2024
– Early works budget of A$45-50 million
A$45 – 50 million
BP 33 Early Works
A$35 – 40 million
NOTES
1. Production guidance assumes reduced ore mining in the wet season months between December and March.
2. Fines are a by-product generated during ore crushing and the processing of ore by the DMS plant
Exploration
and study expenditure
corelithium.com.au
| 8
BP33 UPDATE
Significant work underway as BP33 approaches FID in Q1 2024
• BP33 is cornerstone asset which underpins the broader business
• Mineral Resource more than doubled to 10.1Mt @ 1.48% Li2O in March 20231
• Revised Feasibility Study based on 2023 resource model commenced in April 2023 with a
dedicated team responsible for expanded technical studies including geotechnical and in-fill
resource drilling
• Approved early works funding of $45-50 million in May 2023
– Program includes the development of a covered box-cut, improved access works and
associated surface works for water management
– Allows a feasibility study to be completed in parallel enabling mine decline development
to begin soon after a positive FID
– Subject to potential early wet season, modelled geotechnical and groundwater impacts,
this work is expected to be complete by end of Q1 CY24
• Early works project will facilitate the next phase of capital works, including decline
development, early stope development, ventilation infrastructure, water management and
power infrastructure to commence on receipt of positive FID and board approval
1. Refer “BP33 Mineral Resource more than Doubled " on 6 March 2023. Core Lithium confirms that the Company is not aware of any new information or data that materially
affects the Mineral Resource Estimates cross referenced in this report and confirms that all material assumptions and technical parameters underpinning the estimates continue
to apply and have not materially changed. Measured Mineral Resource 2.85Mt @ 1.46% Li2O / Indicated Mineral Resource 4.09Mt @ 1.53% Li2O.
2. For full details, see the Notice to ASX dated 1 August 2022 (“BP33 delivers outstanding results”), the notice to ASX dated 29 September 2022 ("Business Update and drill results
revised"), 5 October 2022 ("BP33 diamond drilling assays") and accompanying information provided in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). Core Lithium confirms that it is not aware of any new information that
materially affects the information included in the market announcement.
corelithium.com.au |
9
CORE’S FY24 EXPLORATION PROGRAM
Track record of resource growth at low cost with existing deposits open at depth
Overview of exploration program
Finniss Resource growth
• FY24 exploration and study spend is expected to be approximately $35-40
million
Mt / $M
• Majority of exploration expenditure will be allocated to extending and
defining existing resources, all of which are open at depth
• Remaining funds will be directed towards identifying and testing new targets
via a combination of geochemistry, geophysics and drilling at Finniss and
Shoobridge, and geochemistry and geophysics at Anningie-Barrow Creek
Cumulative Resources (Mt)
Cumulative Exploration Spend ($M)
60
50
40
198 tonnes of Resource Inventory added
per metre drilled
30
$1.95 spent per tonne of Mineral
Resource added
10
20
0
2016
2017
2018
2019
2020
2021
2022
2023*
corelithium.com.au | 10
NOTES
ASX Release: "Significant increase to Finniss Mineral Resources" dated 18 April 2023. Total Mineral Resources of 30.6Mt @ 1.31% Li2O. Measured Mineral Resource 6.98Mt @ 1.45% Li2O / Indicated Mineral Resource 12.4Mt @1.33% Li2O. Inferred Mineral Resource 11.3Mt @ 1.21% Li2O.
Core Lithium confirms that the Company is not aware of any new information or data that materially affects the Mineral Resource Estimates cross referenced in this report and confirms that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Predicted expenditure for 2023
NORTH FINNISS: OUR EXPLORATION FOCUS
Close proximity deposits provide a long-term future for Finniss
• Numerous underexplored pegmatites
• During the quarter there was 9,581m of
mine development and exploration
drilling undertaken at BP33, Carlton and
Lees
• 1,529m testing new prospects
• At the end of the quarter there were
three diamond drill rigs and one RC rig in
operation with two more to be mobilised
to site in the current quarter
corelithium.com.au | 11
REGIONAL EXPLORATION TARGETS
Large tenement holdings prospective for lithium at Anningie, Barrow Creek and Shoobridge
• Fieldwork to commence in 2024
• Ground holdings with swarms of
Pegmatite dykes and sills
• Historical pegmatite related tin-tantalum
mines and workings
• Encouraging surface sampling
• Shoobridge has close access to the road
network connected with the Darwin Port
and Finniss Lithium Project
• Anningie / Barrow Creek has close
access to the rail link to Darwin Port
corelithium.com.au | 12
CONCLUDING REMARKS – OUR PRIORITIES FOR FY24
• Deliver Core’s Critical Risk Management program and focus on safe operations
OPERATIONAL
DELIVERY
• Achieve FY24 spodumene production guidance of 80,000 to 90,000 tonnes
1
• Execute Finniss performance improvement initiatives, including improving lithia recoveries and mining productivity
• Deliver into offtake contracts
• Execute exploration plan for 2024
SUSTAINED
GROWTH
• Complete BP33 underground revised Feasibility Study due in Q1 2024
2
ENVIRONMENTAL,
SOCIAL,
GOVERNANCE
3
• Reach FID for BP33 underground in Q1 2024
• Fine-tune strategy for regional exploration and growth options
• Continue Community Grants Program to support community groups in greater Darwin region
• Identify further opportunities for local business, associations and groups to mutual benefit
• Build HSE systems and processes that are fit for purpose and reflect our risk profile
• Continue roll out of Critical Risk Management program and apply learnings from first operational activities
• A contemporary approach to workforce management in how we design jobs and engage people
EMPLOYER OF
THE FUTURE
• Enable the ways of working that deliver on safe, sustainable, cost-effective production outcomes
4
• Aspire to create systems of work that foster diversity
• Continue building out an experienced operational team
corelithium.com.au | 13
APPENDIX
Core overview
corelithium.com.au | ASX CXO
CORPORATE SNAPSHOT
CAPITAL STRUCTURE
Greg English
Non-Executive Chair BEng (Hons), LLB
A$0.87/Share
A$152.7M
Share price – 21 July 2023
Cash and cash equivalent 30 June 2023
Andrea Hall
1,859M Shares1
Nil
Non-Executive Director B Comm (UWA),
MAppFin, FCA, GAICD
Shares on Issue
Debt – 30 June 2023
A$1,617M Mkt Cap
ASX:CXO, ASX200 INDEX
Undiluted Market Capitalisation – 21 July 2023
Ticker
MAJOR SHAREHOLDERS 2
BROKER COVERAGE
Heath Hellewell
Non-Executive Director BSc (Hons) MAIG
Malcolm McComas
Non-Executive Director Bec, LLB, SF Fin,
FAICD
Jarek Kopias
Company Secretary Bcom, CPA, AGIA, AGS
(CS, CGP)
Vanguard Group
Sichuan Yahua
BlackRock
L & AH
State Street
Other
corelithium.com.au | 15
NOTES
1. Plus 3,122,451 unquoted performance rights as at 30 June 2023
2. Register as at 30 June 2023
EXECUTIVE TEAM TO DRIVE NEXT GROWTH PHASE
Alongside the completion of executive appointments, Core has finalised the registration of the new Perth office
Chief Executive Officer
Gareth Manderson
Strategy leadership and value creation
30 years experience building high-performing teams and
leading mining and processing businesses
Chief Financial Officer
Doug Warden
Chief Operations Officer
Mike Stone
Financial management and Safe operational performance
governance
and project delivery
More than 30 years
experience leading
finance, strategy and
business development for
ASX-listed mining
companies
More than 22 years
experience across multiple
commodities - in open pit
and underground
operations
EGM People and Culture
Samantha Rees
Building a high performing
organisation and culture
Registered psychologist
with more than 25 years
experience in human
resources and
organisational
effectiveness
EGM Sustainability
Melissa Winks
EGM Development and Exploration EGM Commercial and Marketing
Paul Benjamin
Pierre Malan
Industry leading ESG practices,High impact exploration targeting
HSE and stakeholder
organic growth and development
engagement
More than 30 years
More than 20 years
experience in sustainability
functions: ESG, HSE,
Communities, Indigenous
Engagement and Approvals
experience leading
operations and developing
complex projects from
exploration through to
execution
Commercial strategy, effective
sales and marketing of our
product
More than 25 years experience
developing and managing
commercial and strategic
relationships in global battery
materials markets
corelithium.com.au | 16
EGM = Executive General Manager
CORE MILESTONES
TRACK RECORD OF ACHIEVING MILESTONES
PURSUING SUSTAINED GROWTH
✓
Jan: First revenue $20.1m
Mar: BP33 Resource doubles
Mar: Additional 18.5kt conc.
offtake with Yahua
Apr: $20.1M payment1
Apr: $91.6M payment2
Apr: Finniss Global Resource
increased 62%
May: BP33 early works
funding approved
✓
Feb: $40M raised
Jul: DFS released
Aug/Sep: $150M raised
Oct: Final Investment Decision
Construction Commences
2016
2021
2022
✓
✓
Discovered Li2O
at Finniss
Jul: Finniss LOM 12 years
Sep: $100M raised
Dec: DSO produced &
transported to Port
2023
FY24 focus areas:
Deliver FY24 production and cost guidance
Deliver Finniss productivity initiatives
Finalise BP33 Revised Feasibility Study
Reach BP33 FID in 1Q 2024
Deliver into offtake contracts
Grow resource via exploration
Undertake study work for other deposits in the district
2024 & beyond
corelithium.com.au | 17
NOTES
1. Payment received for 90% of a 3,500t parcel of spodumene concentrate sold to Yahua on an FOB basis with remainder due upon shipment (expected in May)
2. Payment received under a pre-payment arrangement for a 15,000t parcel, with the balance due on delivery, expected in July.
THE FINNISS LITHIUM PROJECT
Waste Rock Dump (WRD)
Tailings Storage Facility
within WRD
Run of Mine (ROM) Pad
Mine Water Dam 1
Dense Media Separation
(DMS) Plant
Grants Open Pit
Raw Water Dam
Inundation Bund
Crushing
Infrastructure
Admin Building
Sediment Basin 2
corelithium.com.au
| 18
Core Lithium Ltd
Level 9, 2 Mill Street,
Perth, WA, 6000
INVESTOR ENQUIRIES
Natalie Worley
Investor Relations
+61 8 8317 1700
MEDIA ENQUIRIES
Gerard McArtney
Account Manager
+61 421 505 557
Cannings Purple
Authorised for release by the Board of Core Lithium Ltd
corelithium.com.au | ASX CXO
Share your feedback
Discover