Quarterly Activities and Cashflow Report 31 March 2015
Released
Released
Announcement PDF
21st April 2015
Centralised Company Announcements Platform
Australian Securities Exchange
10th floor, 20 Bond Street
Sydney NSW 2000
QUARTERLY ACTIVITIES AND CASHFLOW REPORT 31 MARCH 2015
Please find attached the Quarterly Activities and Appendix 5B Quarterly Cash Flow
Reports for the Quarter ended 31 March 2015.
Yours faithfully
Stephen Biggins
Managing Director
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
ASX Release
QUARTERLY ACTIVITIES REPORT
FOR THREE MONTHS ENDED
31 MARCH 2015
21st April 2015
CORE EXPLORATION LTD
Level 2
143 Hutt Street
Adelaide SA 5000
(08) 7324 2987
Highlights
Exploration has been ongoing in the NT,
focussing on the Jervois Domain Project in
preparation for Core’s first drilling at Jervois
CONTACT:
Overview
Stephen Biggins
Managing Director
The Board of Core Exploration Ltd (“Core”) is
pleased to present its Quarterly activities
report for the Period ended 31 March 2015.
Jarek Kopias
Company Secretary
During the reporting period Core entered into
a Federal Government co-funded research
agreement with CSIRO to accelerate
exploration targeting of the mineral systems
within the Jervois Domain and Albarta
Projects in the east Arunta, Northern
Territory.
E-MAIL:
info@coreexploration.com.au
WEBSITE:
www.coreexploration.com.au
Directors:
Greg English
Non-Executive Chairman
Stephen Biggins
Managing Director
Heath Hellewell
Non-executive Director
Issued Capital:
150,486,287 Ordinary Shares
18,400,000 Unlisted Options
3,925,000 Unlisted Performance Rights
ASX Code: CXO
Final data received during the quarter from
Core’s airborne electromagnetic (AEM) and
magnetic survey on the Jervois Domain
project have identified a number of
prospective features. Geological mapping has
also confirmed key Bonya Metamorphics
geology in outcrop on Core’s tenure. A recent
report by the Northern Territory Government
Geological Survey (NTGS) has independently
verified the potential of the “Big J-fold”
structure on Core’s Jervois Domain
tenements to host Jervois-style mineralisation
In follow-up to Core’s discovery of high-grade
silver-lead-zinc mineralisation at Inkheart,
regional
geochemical
surveys
have
commenced on Core’s nearby tenements to
confirm the potential for a large-scale
mineralising system on the margin of
Amadeus Basin and the east Arunta in the NT.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Project Activity
Albarta Project, Northern Territory
(CXO 100%)
Figure 1. Core’s Albarta Project prospects and tenements overlain on regional geology, NT
CXO has successfully negotiated a Research in Business Study over Core’s Albarta and
Jervois Domain Projects, which will be co-funded by the Commonwealth Government.
CSIRO will investigate the application of an integrated analysis of magnetics and airborne
electromagnetic (AEM) data, tied into an understanding of the mineral systems that are
present in the Jervois and Albarta areas in the Arunta Block of the Northern Territory, to aid
exploration targeting. The research project aims to realise the prospectivity of Core
Exploration’s tenement holding, by providing processed and interpreted geophysical data,
from which follow‐up exploration and drilling can be prioritised and executed.
Phase 1 of the research will be undertaken at the brownfields scale and aims to identify
potential extensions of the known Jervois base‐metal mineral system in adjacent
undercover areas. Phase 1 will include analysis of airborne magnetic and VTEM AEM data,
involving application of fast approximate transforms, full non‐linear inversion, and
parametric modelling of the amplitude data to identify potentially mineralised targets.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
In addition, Phase 1 will use petrophysical analyses (Susceptibility, Remanence and AMS) to
constrain data modelling focussed on identifying the most prospective sites for
mineralisation.
Phase 2 will be undertaken at a regional scale over the total project area aimed at prospect
identification and refinement, targeting IOCG, Cu‐VMS/sedex and other mineral systems,
across Core’s tenements. Phase 2 will be underpinned by knowledge from previous studies,
and will be focussed on analysing a large number of discreet anomalies in order to
determine depth to source and likely volume so that targets can be effectively prioritised.
Jervois Project, EL’s 29579, 29580, 29581 & 29669 NT
(CXO 100%)
CXO’s Jervois Project remains the primary focus for exploration activities. A new NTGS
study has independently verified the potential of the “Big J-Fold structure” on CXO’s Jervois
Domain tenure to host Jervois-style mineralisation (Figure 2). This assessment is consistent
with CXO’s previous interpretation that the folded extension of KGL’s “Jervois line-of-lode”
geology extends on CXO’s tenure. The Big J-Fold was initially highlighted by CXO as a 20-km
long prospective zone identified as a concentric zone of folded geology with anomalous
magnetic character similar to the Jervois line-of-lode.
Figure 2. Slide 37 from NTGS presentation AGES 2015 Conference Alice Springs, NT Overlain with CXO
and KGL tenure boundaries. (From McGloin & Weisheit. 2015. Base metal and tungsten
mineralisation in the Jervois mineral field and the Bonya Hills: Characterisation, potential genetic
models and exploration implications - AGES 2015 Presentation).
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Recent reconnaissance mapping by CXO geologists has identified a range of rock-types
typical of the Bonya Metamorphics that host the Jervois Cu-Au-Pb-Zn mineralisation in
outcrop on CXO’s tenure. They occur as a package of chemical and clastic metasediments
with occasional interlayered felsic and mafic volcanics. Detailed geological mapping, soil
and rock-chip sampling is currently in progress.
Figure 3: CXO’s Interpreted solid geology and schematic cross sections (A-B & C-D) for the Jervois
Domain illustrating target potential on Core’s tenure.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
The final dataset from the VTEM SupermaxTM AEM survey that was completed in October
was received this Quarter and is currently being processed by CSIRO. In addition, as part of
the Federal Government co-funded research by CSIRO, existing magnetic datasets will be
reprocessed, modelled and be integrated with a comprehensive mineral system analysis.
CXO is keen to apply best possible practices and analysis of all available datasets to refine
drill targets and to optimise the opportunity for success in its forthcoming maiden drill
program.
In preparation for drilling an Exploration Mine Management Plan has been submitted to the
Northern Territory Department of Mines and Energy and a Cultural Heritage Clearance
survey over the entire area covered by the recent airborne electromagnetic survey (AEM)
has been organised through the Northern Territory Aboriginal Areas Protection Authority
(AAPA).
Inkheart - Blueys Project, EL 28136 NT
(CXO 100%)
Soil sampling and mapping for analogues to Inkheart-style mineralisation has commenced
on Core’s adjacent EL 27709 to test and confirm the potential for a large-scale, sediment
hosted silver-lead-zinc mineralising system on the margin of Amadeus Basin and the east
Arunta in the NT.
A submission seeking collaborative government funding for a diamond-drilling program at
Inkheart has been submitted to the Northern Territory Geological Survey under their CORE
(Creating Opportunities for Resource Exploration) program. This proposal details Core’s
plan to diamond drill (~1000m) at its Inkheart Prospect within the Amadeus Basin to test the
hypothesis that mineralised fluid has used the Bitter Springs Formation – Heavitree
Quartzite contact as a conduit and/or trap.
Core’s work at Inkheart in 2014 has identified Pb + Ag ± Zn ± Cu mineralisation within the
Bitter Springs Formation at the Inkheart Prospect, but has hypothesised that this represents
offshoots of mineralised veining off a more significant body of mineralisation at the Bitter
Springs Formation – Heavitree Quartzite contact at depth which is currently untested.
Virginia & Copper Royals, EL 29689 NT
(CXO 100%)
Results from the Virginia and Copper Royals drilling program, completed in November 2014
(Table 1), were received this Quarter. The results were generally disappointing with only
three of the 18 holes completed returning significant intersections (Table 2). At Virginia the
program did however confirm an inconsistently mineralised structure at depth beneath the
surface geochemical anomalism related to the chargeable zones in CXO’s previous IP
geophysical survey. The VTEM conductor beneath Virginia was not adequately tested by
this shallow slimline RC drilling program and is subject to ongoing processing and
interpretation by CSIRO.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Hole_ID
VGRC001
VGRC002
VGRC003
VGRC004
VGRC005
VGRC006
VGRC007
VGRC008
VGRC009
VGRC010
VGRC011
VGRC012
CRRC001
CRRC002
CRRC003
CRRC004
CRRC005
CRRC006
Easting
476465
476539
476661
476720
477279
477422
477549
477480
477406
477353
477288
477247
464932
466641
467120
466099
466769
465768
Northing
7444684
7444598
7444533
7444431
7444411
7444424
7444499
7444643
7444734
7444853
7444943
7445049
7442322
7440094
7440253
7441561
7440770
7439667
RL
685
691
699
694
712
704
698
699
692
684
677
665
738
753
763
750
748
762
DIP
-90
-90
-90
-90
-70
-70
-90
-90
-90
-90
-90
-90
-70
-90
-90
-70
-60
-90
Azimuth
0
0
0
0
350
355
0
0
0
0
0
0
45
0
0
001
195
0
Total Metres:
Total Depth
120
110
120
108
99
99
51
120
108
99
99
120
84
105
84
60
81
78
1745
Table 1: Virginia Drill Hole Information
Hole ID
VGRC001
VGRC002
VGRC004
From
93
51
3
To
99
54
6
Width
6
3
3
Cu (ppm)
1502
4337
8686
Cu (%)
0.2
0.4
0.9
Table 2: Significant intersections from the Virginia – Copper Royals Drilling Program on EL 29689
Figure 4: Collar Plan of Virginia Drilling
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Yerelina Project, EL 5015 South Australia
(CXO 100%)
A PACE submission to receive South Australian government co-funding of a maiden drilling
program at Yerelina zinc-lead-silver Project was submitted.
High-grade zinc-lead-silver mineralisation within Tapley Hill Formation (THF) was historically
mined 100 years ago at Yerelina in the Northern Flinders Ranges. Whilst there remains clear
evidence of numerous historical workings and outcropping mineralisation that can be
mapped over hundreds of metres in repetitious gossanous vein sets over a very broad area,
no systematic modern exploration has been undertaken and the area has never been drill
tested.
The Adelaide Geosyncline has long been considered prospective for sedimentary basin
hosted base metal mineralisation styles (e.g. MVT). CXO believes that the mineralisation at
Yerelina may represent a surface exposure of part of one of these large regional
mineralisation styles.
Recent petrological investigations of outcropping mineralisation infer similarities to the
Coeur d’Alaine (Idaho) high-silver network vein mineralisation style which if substantiated
introduce a new potential mineralisation model for South Australia
CXO acquired Yerelina in September 2012 and has progressively advanced this project
through reviews of historical data; analysed surface geochemistry and petrological samples;
and flown high-resolution airborne geophysical surveys. The next logical step for this project
is drill testing, ideally with orientated diamond core, under the known outcropping
mineralisation to better understand mineralisation potential and geological controls.
No exploration was undertaken at Yerelina during the Quarter.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Corporate
CASH POSITION
Core had $0.84 million cash on hand at the end of the March Quarter.
Exploration and evaluation expenditure by the Company during the March 2015 Quarter
was $352,000.
CHANGE OF TENEMENT INTEREST
No changes in Tenement during the quarter.
SHARE CAPITAL CHANGES
During the Quarter, 5,750,000 unlisted performance rights lapsed as the performance
conditions were not met. Since the end of the quarter, 2,000,000 unlisted options were
issued to contractors as remuneration – 1,000,000 with an exercise price of 5.00 cents and
1,000,000 with an exercise price of 7.50 cents with both option classes having an expiry of
30 September 2016.
A summary of movements and balances of equity securities between 1 January 2015 and
this report are listed below (all equity movements occurred during the Quarter except as
noted):
On issue at start of Quarter
Lapse of performance rights
Issue of unlisted (2 April 2015)
Total securities on issue at the date
of this report
Ordinary
Shares
Unlisted
options
150,486,287
16,400,000
150,486,287
2,000,000
18,400,000
Unlisted
Performance
rights
9,675,000
(5,750,000)
3,925,000
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Proposed Activities Next Quarter
Northern Territory
Jervois
A program of detailed mapping and soil geochemistry over key areas in CXO’s Jervois
Domain Project is planned for Q2-2015.
CSIRO in collaboration with CXO will continue the in-depth study of the Jervois Project
including modelling the VTEM and magnetic datasets.
Cultural Heritage Clearances over the Jervois Project are scheduled for early Q2-2015 in
preparation for drilling once drill targets are refined from the CSIRO and other ongoing
studies.
Blueys and Inkheart Silver Project
Extensions to soil coverage and mapping over EL 28136 and neighbouring tenure that are
considered potential analogues to Inkheart are planned for Q2-2015.
Preparation and submission of an Exploration Mine Management Plan (EMMP) for diamond
drilling at Inkheart.
South Australia
Yerelina
Preparation for drilling at Yerelina including submission of a Program for Environmental
Management and Rehabilitation (PEPR) and Cultural Heritage Clearances will commence in
Q2-2015.
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Tenement Table
Tenement number Tenement name
Beneficial Interest
at the end of the
Quarter
Changes during
Quarter
South Australia
EL 4569
Fitton
100%
None
EL 4816
Horse Well
100%
None
EL 4906
Roxby Downs
100%
None
EL 5015
Yerelina
100%
None
EL 5192
Calcutta
100%
None
EL 5320
Yorke Peninsula
100%
None
EL 5375
Billy Springs
100%
None
EL27369
Mt Russell
100%
None
EL27709
Pattersons
100%
None
EL28029
White Range East
100%
None
EL28136
Blueys
100%
None
EL28546
Star Creek
100%
None
EL28852
Gough Dam
100%
None
EL28853
No 1 Tank
100%
None
EL28854
Mt Johnstone
100%
None
EL28940
Mordor
100%
None
EL29280
Woolgathering
100%
None
EL29304
Brumby Dam
100%
None
EL29347
Yambla
100%
None
EL29389
Mt George
100%
None
EL29512
Daicos
100%
None
EL29514
Mt Emma
100%
None
EL29579
Jervois
100%
None
EL29580
Jervois
100%
None
EL29581
Jervois
100%
None
EL29667
Riddoch
100%
None
EL29668
Riddoch
100%
None
EL29669
Jervois
100%
None
EL29687
Laughlen
100%
None
EL29688
Riddoch
100%
None
EL29689
Riddoch
100%
None
Northern Territory
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
The information in this report that relates to Exploration Results and Mineral Resources is based on information
compiled by Stephen Biggins (BSc(Hons)Geol, MBA) as Managing Director of Core Exploration Ltd who is a
member of the Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s
codes and recommended practices. He has sufficient experience which is relevant to the styles of mineralisation
and types of deposits under consideration and to the activities being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. Mr. Biggins consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The report includes results that have previously been released under JORC 2012 by Core. The Company is not
aware of any new information that materially affects the information included in this announcement:
Mar 30 2015 - Study strengthens potential of Cores Jervois Domain Project
Feb 10 2015 - Federal co-funded CSIRO research targets CXO Jervois Domain
Jan 29 2015 - Jervois Domain Final AEM Confirms Conductive Targets
Jan 23 2015 - Drill results received for Virginia and Copper Royals
A Level 2, 143 Hutt Street, Adelaide SA 5000 | T (08) 7324 2987| F (08) 8312 2002| E info@coreexploration.com.au
www.coreexploration.com.au
Appendix 5B
Mining exploration entity Quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.
Name of entity
Core Exploration Ltd
ABN
Quarter ended (“current Quarter”)
80 146 287 809
31 March 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for:
(a) exploration and evaluation
(b) development
(c) production
(d) administration
Year to date
(9 Months)
$A’000
-
-
(352)
(160)
(1,351)
(569)
-
-
7
224
-
25
520
-
(281)
(1,375)
(26)
(89)
-
-
Net investing cash flows
(26)
(89)
Total operating and investing cash flows
(carried forward)
(307)
(1,464)
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes received – R&D refund
Other (provide details if material)
1.5
1.6
1.7
Current Quarter
(3 Months)
$A’000
Net Operating Cash Flows
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
1.13
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
1.13
Total operating and investing cash flows
(brought forward)
(307)
(1,464)
-
1,750
-
(4)
(4)
(125)
1,625
Net increase (decrease) in cash held
(311)
161
1.20
1.21
Cash at beginning of Quarter/year to date
Exchange rate adjustments to item 1.20
1.22
Cash at end of Quarter
1,155
844
683
844
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Proceeds from issues of shares
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Capital raising costs
Net financing cash flows
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related entities
Current Quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item
1.2
96
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
The amount above includes all payments to Directors and also includes payments to
entities associated with Greg English, Stephen Biggins and Heath Hellewell. The
payments relate to executive services and directors fees on commercial terms.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows.
n/a
2.2
Details of outlays made by other entities to establish or increase their share in
projects in which the reporting entity has an interest.
n/a
Financing facilities available
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Nil
Amount used
$A’000
Nil
Nil
Nil
Estimated cash outflows for next Quarter
$A’000
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
300
160
Total
460
Reconciliation of cash
Reconciliation of cash at the end of the Quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
Current Quarter
$A’000
Previous Quarter
$A’000
5.1
Cash on hand and at bank
804
1,115
5.2
Deposits at call
40
40
5.3
Bank overdraft
-
-
5.4
Other (provide details)
-
-
844
1,155
Total: Cash at end of Quarter (item 1.22)
Changes in interests in mining tenements
Tenement reference
6.1
6.2
Interests in mining
tenements
relinquished,
reduced or lapsed
Nil
Interests in mining
tenements
acquired or
increased
Nil
Nature of interest
(note (2))
Interest at
beginning of
Quarter
Interest at
end of
Quarter
Issued and quoted securities at end of current Quarter
Description includes rate of interest and any redemption or conversion rights together with prices
and dates.
7.1
Preference+securities
(description)
7.2
Changes during Quarter
7.3
+Ordinary securities (CXO)
7.4
Changes during Quarter
(a) Increases through issues
(b) Decreases through returns of
capital, buy-backs
+Convertible debt securities
7.5
Total
number
Number
quoted
150,486,287
150,486,287
Issue
price per
security
(cents)
Amount
paid up per
security
(cents)
Exercise
price
Expiry date
7.50
10.00
8.50
10.00
31 Oct 2015
31 Oct 2015
16 Oct 2016
31 Jan 2016
-
Various
-
31 Dec 2014
(description)
7.6
7.7
Changes during Quarter
Options (description and
conversion factor)
Unlisted options
Unlisted Options (CXOAQ)
Unlisted Options (CXOAQ)
Unlisted Options (CXOAR)
Unlisted Options (CXOAS)
200,000
1,000,000
200,000
15,000,000
-
Total unlisted options
16,400,000
-
Total unlisted performance
rights (CXOAK)
3,925,000
-
7.8
Issued during Quarter
7.9
Exercised during Quarter
7.10
Expired during Quarter
Unlisted perf rights (CXOAK)
7.11
Debentures (totals only)
7.12
Unsecured notes (totals only)
5,750,000
-
Compliance statement
1
This statement has been prepared under accounting policies which comply with accounting
standards as defined in the Corporations Act or other standards acceptable to ASX (see note
4).
2
This statement does give a true and fair view of the matters disclosed.
Jaroslaw (Jarek) Kopias
Date: 21st April 2015
Company Secretary
Notes
1
The Quarterly report provides a basis for informing the market how the entity’s activities
have been financed for the past Quarter and the effect on its cash position. An entity
wanting to disclose additional information is encouraged to do so, in a note or notes
attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining
tenements acquired, exercised or lapsed during the reporting Period. If the entity is
involved in a joint venture agreement and there are conditions precedent which will change
its percentage interest in a mining tenement, it should disclose the change of percentage
interest and conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities
The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid
securities.
4
The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and
AASB 1026: Statement of Cash Flows apply to this report.
5
Accounting Standards
ASX will accept, for example, the use of International Accounting Standards for foreign
entities. If the standards used do not address a topic, the Australian standard on that topic
(if any) must be complied with.
== == == == ==
Share your feedback
Discover