Jervois reconnaissance drill results exceed expectations
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX : CXO
23rd November 2015
Jervois reconnaissance drill results exceed expectations
HIGHLIGHTS
Drilling has intersected numerous elevated copper zones within the
20km long Big-J target zone on the Jervois Domain
Near surface malachite (copper) mineralisation identified in a
number of drill holes
20km strike length of Big-J now established to have potential for
Jervois style copper mineralisation
Big-J geology, geophysics and now copper in drilling strengthen the
case for a step-change in scale of mineralisation in the Jervois area
Drill targets have characteristics consistent with the Sedex/VHMS
style of mineralisation identified at KGL’s Jervois project
Strong targets to drill to infill 2,000-6,000m gaps between traverses
Core Exploration (ASX:CXO) is pleased to announce the assays from the Company’s first
drilling of it’s 100%-owned Jervois Domain tenements north-east of Alice Springs in the
Northern Territory have exceeded expectations.
Core’s drilling has proven that the 20km Big-J target zone has the geology, geophysics and
now near surface copper exploration results consistent with KGL Resources neighboring
Jervois project, but on a much larger exploration scale (Figures 1 & 2).
Core’s first pass shallow drilling program (average drill hole depth of 10m at 50m spacing)
found elevated copper on all five traverses drilled across a 15km section of the Big-J target
zone. Best results were on the northern traverses D, F and H (refer Table 1 and Figure 1).
Visible copper mineralisation as malachite was also observed near surface and over
intersections several metres wide in a number of drill holes.
A 26 Gray Court, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Much of the Big-J target geology is buried under a very shallow cover of sand and soil and
the primary purpose of the drilling was to determine geology and the depth of this cover.
Whilst the drilling determined that the cover was shallow, the number of holes that
intersected copper mineralisation and the grade of that mineralisation far exceeded the
Company’s expectations.
Core’s copper assays are comparable in magnitude with KGL’s nearby surface copper
exploration results in and around KGL’s J-fold line of lode which hosts the Jervois Copper
Project, but represent a much larger area of prospective geology.
Previous explorers had disregarded the huge potential of this area as earlier exploration and
development activity has focused on nearby areas of outcropping mineralisation.
Drilling intersected a range of psammatic and pellitic schists, calc-silicates, pegmatites, mafic
schists and occasional andalusite and porphryblastic schists typical of the Bonya
Metamorphics suite of rocks.
Big-J
Figure 1. Core’s significant copper drill results, tenure and location of KGL’s Jervois Project
deposits, overlain on RTP magnetic image of the Jervois area.
A 26 Gray Court, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Traverse
Hole
H
H
H
H
F
D
D
C
B
24
31
38
236
54
119
239
149
209
Depth
From
7
7
15
3
7
2
3
3
10
Interval
4
4
1
13
9
13
6
10
1
Copper
(ppm)
650
492
1498
402
174
185
610
181
398
Table 1. Significant copper drill results found on all traverses.
Core’s drilling has found that the copper-rich Bonya Metamorphics geology is covered with
only a few meters of shallow soil, sand and alluvium, which elevates the potential to make
discoveries with cost-effective geochemical exploration methods and improves the chances
of finding economic, near surfaces copper deposits.
Core is also applying similar geophysical tools to those used to characterise and define the
nearby Jervois copper and base-metal mineralisation by KGL Resources and Rox Resources
in the same host Bonya Metamorphics geology.
Core’s geophysical signatures, geology and geochemistry of the Big-J fits well with
Sedex/VHMS model proposed for the mineralisation at Jervois by recent NTGS research.
Next Steps
Given the encouragement of these excellent results, a range of drilling and exploration
opportunities open up to Core to further prove up the copper potential and scale of Big-J.
Obvious large untested 2,000m to 6,000m gaps within the 20km length of the Big-J are
targets for infill reconnaissance drilling.
In addition to shallow infill drilling and surface geochemistry surveys in early 2016, Core
anticipates follow-up deeper drilling to test the depth extensions of identified near surface
copper mineralisation.
KGLs nearby work has also shown the success of applying geophysics to find deeper deposits
at Jervois, so Core intends to complement its near surface exploration with additional
geophysics to aid drill targeting and interpretation.
A 26 Gray Court, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Big-J
Figure 2. Core’s significant copper drill results, tenure and location of KGL’s Jervois Project
deposits, overlain on interpreted geology of the Jervois area.
Managing Director Stephen Biggins commented “Core’s copper results from our first drilling
program at Jervois have not only exceeded expectations, but boosted the potential to
deliver additional large scale deposits and enhance the development of a new regional
copper mining centre at Jervois.”
“Core anticipates building on these very positive early stage drill results to deliver more
substantial copper intersections with infill and deeper drilling along the 20km length of the
now proven Big-J copper target.” he said.
For further information please contact:
Stephen Biggins
Managing Director
Core Exploration Ltd
08 7324 2987
info@coreexploration.com.au
John Field
Field Public Relations
08 8234 9555
john@fieldpr.com.au
A 26 Gray Court, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
by Stephen Biggins (BSc(Hons)Geol, MBA) as Managing Director of Core Exploration Ltd who is a member of the
Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s codes and recommended
practices. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Biggins consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears .
A 26 Gray Court, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Jervois RAB Drilling – October 2015– JORC 2012
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
A handheld XRF (Niton XL3t GOLDD+) was used to pre-screen end
of hole samples such that only anomalous readings were physically
sampled for laboratory analysis.
Bottom of hole RAB drill cuttings were spear sampled collecting 1-3kg
of representative material.
Additional samples higher up in holes were composited from
representative chip-tray samples providing nominally typically 100g of
material for analysis.
Bullion Drilling were contracted to undertake open hole RAB drilling
using a combination of blade and hammer
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be tak en as limiting the broad meaning of sampling.
Include reference to measures tak en to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘RC drilling was used to obtain 1 m samples from
which 3 k g was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, RC, open-hole hammer, rotary air blast, auger,
Bangk a, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Drill sample Method of recording and assessing core and chip sample recoveries
and results assessed.
recovery
Drilling
techniques
6
All drill holes were vertical
RAB drilling only so no assessment of sample representivity or
sample bias available.
Criteria
Logging
Subsampling
techniques
and sample
preparation
JORC Code explanation
Commentary
Measures tak en to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
tak en.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub -sampling stages to
maximise representivity of samples.
Measures tak en to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Drill cuttings were qualitatively logged and photographed
Qualitative logging included lithology, colour, mineralogy, description,
marker horizons, weathering, texture, alteration and mineralization
See Sampling section above for a description of sampling and
sub-sampling techniques.
Sample sizes are considered appropriate for the expected
grainsize of mineralisation.
Every twentieth end-of-hole sample drilled was duplicated. Certified
standards were submitted in sequence for every 25 drilled end-ofhole samples.
Subsampling techniques are undertaken in line with standard
operating practices in order to ensure no bias associated with subsampling.
The nature, quality and appropriateness of the sampling technique is
considered adequate for the type of mineralisation and confidence
level being attributed to this initial reconnaissance RAB drilling
program.
Whether sample sizes are appropriate to the grain size of the material
7
Criteria
JORC Code explanation
Commentary
being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
A certified and accredited global laboratory (Intertek-Genalysis) was
used for all assays.
Sample preparation was undertaken in Alice Springs with analysis
undertaken at Intertek’s Adelaide laboratory.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
mak e and model, reading times, calibrations factors applied and their
derivation, etc.
Samples were analysed using Intertek’s 4A/OM10 technique which
involves near-total 4 acid digest and analysis using ICP-OES and
ICP-MS for 46 elements.
Internal certified laboratory QAQC is undertaken by Intertek.
Duplicates and certified standards were inserted in sequence as
detailed above.
Verification The verification of significant intersections by either independent or
alternative company personnel.
of sampling
and
the use of twinned holes.
assaying
Primary data is captured directly into an in-house referential and
integrated database system designed and managed by the
Exploration Manager. All assay data is cross-validated within the
database by various integrity scripts and externally using MapInfo drill
hole validation checks including interval integrity checks.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Laboratory assay data is not adjusted.
Quality of
assay data
and
laboratory
tests
Location of
data points
Nature of quality control procedures adopted (eg standards, blank s,
duplicates, external laboratory check s) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine work ings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
8
Collar coordinate surveys
All coordinates are recorded in GDA 94 MGA Zone 53.
Surveys have been undertaken by Core Exploration staff using a
hand-held GPS this tool has an accuracy of approximately 3m.
Topographic control uses the DTM generated by the VTEM 200m
airborne survey recently conducted over EL 29580.
Criteria
JORC Code explanation
Commentary
Down hole surveys
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Drilling was undertaken on five traverses with nominal 50m between
holes. 22 holes were redrilled deeper as twins using a RAB hammer:
JVRB024-JVRB236, JVRB031-JVRB235, JVRB038-JVRB234,
JVRB054-JVRB226, JVRB055-JVRB227, JVRB062-JVRB228,
JVRB083-JVRB229, JVRB084-JVRB230, JVRB085-JVRB231,
JVRB086-JVRB232, JVRB087-JVRB233, JVRB096-JVRB240,
JVRB119-JVRB239, JVRB139-JVRB238, JVRB143-JVRB237,
JVRB149-JVRB243, JVRB162-JVRB242, JVRB181-JVRB241,
JVRB182-JVRB247, JVRB194-JVRB246, JVRB198-JVRB245,
JVRB209-JVRB244
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is k nown, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of k ey mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Sample
security
The measures tak en to ensure sample security.
Audits or
reviews
No downhole surveys were undertaken
The results of any audits or reviews of sampling techniques and data.
9
Initial reconnaissance RAB drilling only.
See drilling section above regarding composite sampling
Initial reconnaissance drilling only
Sample Intervals are put into individually numbered calico sample
bags and are then loaded into cable tied bulka-bags before being
dispatched to Intertek-Alice Springs for sample preparation.
Assay pulps are returned to Core Exploration from contracted
laboratories on a regular basis and stored securely for future
reference.
No audits or reviews have been undertaken
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure
status
The Jervois RAB drilling was undertaken on EL 29580 that is 100%
held by DBL Blues Pty Ltd a wholly owned subsidiary of Core
Exploration Ltd.
Core Exploration manages EL 29580.
EL 29580 is located on Jervois Pastoral Station.
All drilling was undertaken outside of Heritage, Conservation or
National Parks on EL 29580.
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
k nown impediments to obtaining a licence to operate in the area.
All work was undertaken within the scope of the Exploration Mining
Management Plan (EMMP) that was approved by NTDME
Exploration
done by
other
parties
Ack nowledgment and appraisal of exploration by other parties.
Historical exploration on EL 29580 is limited to early auger sampling.
In late 2014 CXO flew a 200m spaced VTEM supermax AEM survey
Geology
Deposit type, geological setting and style of mineralisation.
Geology comprises Proterozoic geology of the Bonya Schist
(including saprolitic schist, gneiss, pssamite and rare mafic /
pegmatites).
Drilling is targeting SEDEX or VMS Cu mineralisation.
Drill hole locations information is recorded within the CXO in-house
database with all collar locations illustrated in the figures
accompanying this document. A total of 247 holes were drilled for a
total of 3,162.3m. The average depth of holes was 12.8 metres with
a maximum depth of 51 metres.
As drilling was only open hole RAB drilling which is essentially only
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
10
Criteria
JORC Code explanation
Commentary
o dip and azimuth of the hole
geochemical mapping it is considered a full table of drill hole details is
not warranted.
o down hole length and interception depth
o hole length.
Data
aggregatio
n methods
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
No material information is excluded.
Aggregated intersections have been calculated for copper using a
100ppm cut-off. Minimum intersection widths are 1m and no internal
dilation is included
No metal equivalents are reported.
Initial reconnaissance drilling only thus geometric relationship of
mineralisation to vertical drill orientation unknown.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationshi
p between
mineralisati
on widths
and
intercept
lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is k nown, its nature should be reported.
If it is not k nown and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not k nown’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
See attached plans showing drill hole density accompanying this
document.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
See attached table of intersections.
Reported intersections use the criteria detailed in the above section
11
Criteria
JORC Code explanation
Commentary
“data aggregation methods”.
Exploration Results.
Other
substantive
exploration
data
Further
work
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
12
Due to the drilling technique geology including primary textures are
hard to distinguish or are obliterated.
Minor ground water was sporadically intersected in only 9 of the 247
holes drilled.
Multi-element geochemistry assaying (47 elements) including gold by
fire-assay is routine for all sampling. Some elemental associations
are recognised within certain lithologies within the region and are
used as a tool to assist in interpretation of original lithologies where
alteration affected the ability to visually determine the lithology.
The target stratigraphy which has been interpreted by NTGS as a
potential repeat of the Jervois Line-of-Lode is best defined as a
magnetic high.
VTEM processing is still ongoing with CSIRO but has been affected
by strong IP-coupling effects
Subject to Board approval further drilling may be undertaken