Highlights
•
Ore Reserve Estimate for Carlton of 4.5Mt @ 1.19% Li2O, one of the three key deposits
within the current Finniss Lithium Project mine schedule
•
Increases the Total Finniss Ore Reserves by 42% to 15.2Mt @ 1.26% Li2O
•
Contained Li2O metal in Finniss Ore Reserves increases by 39% to 192kt (up from 138kt)
•
Restart Study mine schedule now 87% backed by Ore Reserves (up from 61%)
•
Finniss high grade Mineral Resource Estimate of 48.5Mt @ 1.26% Li2O
•
Further de-risks the Restart Study mine schedule and supports both the potential restart
and future expansion case for Finniss
Core Lithium Ltd (ASX: CXO) (Core or the Company) is pleased to provide an update to the Ore Reserve
Estimate at its 100%-owned Finniss Lithium Project (Finniss or the Project). Finniss is located within the Bynoe
Pegmatite Field in the Northern Territory and is situated 88km by road from the Darwin Port.
The declaration of Ore Reserves at Carlton leverages the substantial body of study work that has been conducted.
The Ore Reserve Estimate and related assumptions were developed and supported by independent consultants
in conjunction with Core’s Competent Persons (CP).
Commenting on the Maiden Carlton Ore Reserve, Core CEO Paul Brown said:
“The declaration of Ore Reserves at Carlton represents another important de-risking step towards a future restart
of operations at Finniss. The update to Carlton delivers a 42% increase in our total Ore Reserves, which now sit
at 15.2Mt @ 1.26% Li2O, representing more than 16 years of potential feed into the Finniss DMS plant based on
its planned capacity of 1.2Mtpa. Mineralisation at Carlton remains open at depth, and we see considerable
opportunity to extend the deposit through future exploration as the project develops.
“This Updated Ore Reserve also supports a higher degree of confidence in the Restart Study mine schedule which
has ore from Carlton entering the schedule from year nine of the mine plan. Conversion of the majority of the
Carlton material into Ore Reserves also increases future optionality for an expanded processing capacity at
Finniss. This now offers greater potential to bring forward ore from Carlton earlier into the mine schedule, should
a plant expansion be warranted by future market conditions.”
corelithium.com.au
Figure 1 Location of Carlton relative to Core’s existing processing infrastructure at Finniss
Tenements and Ownership
The Finniss Lithium Project covers an area of over 500km 2. It is made up of a number of Exploration Licences
(ELs) and Mining Leases (MLs) including: EL29698, EL29699, EL30012, EL30015, EL31126, EL31127, EL31271,
EL31279, EL32205, ML29912, ML29914, ML29985, ML31654, ML31726, ML32074, ML32278, ML32346,
MLN16, MLN813 and MLN1148. All ELs and MLs are 100% owned by Core Lithium. The Carlton deposit is
contained within ML31726.
corelithium.com.au
2
Mineral Resources
There has been no change to the Mineral Resource Estimate for the Finniss Project, which includes the Carlton
deposit. The Finniss Project Mineral Resource estimates are presented in Table 1.
Table 1 Finniss Project Mineral Resources at 30 April 2025 reported at a Cut Off grade of 0.5% Li2O
Mineral Resource Estimate for the Finniss Lithium Project
Mineral Resource
Measured
Indicated
Inferred
Total
Tonnes
Li2O
Tonnes
Li2O
Tonnes
Li2O
Tonnes
Li2O
(Mt)
%
(Mt)
%
(Mt)
%
(Mt)
%
Grants
BP33
1.34
1.48
0.61
1.49
0.37
1.27
2.32
1.45
Li2O
Contained
Metal (kt)
33.6
2.85
1.44
6.51
1.55
1.14
1.59
10.5
1.53
161
Carlton
2.14
1.33
3.43
1.32
0.78
1.14
6.34
1.3
82.6
Lees
-
-
4.16
1.18
7.08
1.12
11.2
1.14
128
Ah Hoy
-
-
1.71
1.2
2.93
1.38
4.64
1.31
60.8
Booths
-
-
1.84
0.99
1.4
1.06
3.24
1.02
33
Penfolds
-
-
0.65
1.25
0.71
1.24
1.36
1.24
16.9
Hang Gong
-
-
1.51
1.18
1.95
1.14
3.46
1.16
40.1
Sandras
-
-
1.17
0.92
0.57
0.82
1.73
0.89
15.4
Bilatos
-
-
-
-
1.92
1.03
1.92
1.03
19.8
Seadog
-
-
-
-
1.41
1.18
1.41
1.18
16.6
Total
6.33
1.41
21.6
1.30
20.3
1.18
48.2
1.26
608
-
-
-
20.3
1.18
0.31
48.5
0.66
1.26
2.0
1.41
0.66
1.29
-
6.33
0.31
21.9
TSF/Rejects
Total
1.
2.
610
Totals within this table are subject to rounding.
There was no cut-off applied to the TSF/Rejects material.
corelithium.com.au
3
Ore Reserves
The overall Project Ore Reserve Estimate has increased by 42.0% to 15.2Mt @ 1.26% with a 38.7% increase in
contained metal to 192kt Li2O.
Proved and Probable Ore Reserves were estimated for Carlton. Measured Mineral Resources were converted to
Proved Ore Reserves and Indicated Mineral Resources were converted to Probable Ore Reserves with the
application of modifying factors. No Probable Ore Reserves have been derived from Measured Mineral
Resources. The criteria used for the classification of the MRE on which the ORE is based is as follows:
• drilling data spacing, grade and geological continuity, and data integrity.
• the relative contributions of geological and data quality and confidence, as well as grade confidence and
continuity.
• confidence in the Measured and Indicated mineral resource is sufficient to allow application of modifying
factors within a technical and economic study.
The confidence level of the assumptions used is at a prefeasibility level. The effective date of the Carlton Ore
Reserve Estimate is 5 September 2025.
Table 2 Ore Reserve Estimate including contained metal
Deposit
BP33
Grants
Carlton
TSF/Stockpiles
Total
Proved
2.6
1.27
Contained Li2O
(kt)
32
Probable
6.7
1.32
89
Category
Ore Tonnes (Mt)
Li2O (%)
Total
9.3
1.31
121
Proved
0.9
1.29
11
Probable
0.3
1.36
4
Total
1.2
1.31
15
Proved
1.7
1.19
20
Probable
2.8
1.19
34
Total
4.5
1.19
53
Proved
-
-
-
Probable
0.3
0.68
2
Total
0.3
0.68
2
Proved
5.1
1.25
63
Probable
10.1
1.27
128
Total
15.2
1.26
192
1.
2.
3.
4.
Effective date of the Carlton Ore Reserves is 5 September 2025.
Effective date of the Grants, BP33 and TSF/Stockpiles Ore Reserves is 30 April 2025.
Ore Reserves are the total for the Grants, BP33, TSF/Stockpiles and Carlton Mines.
The long-term SC6 Spodumene price used for calculating the financial analysis is US$1,330/t. The financial analysis has been estimated
with assumptions for crushing, processing and treatment charges, deductions and payment terms, concentrate transport, metallurgical
recoveries, and royalties.
5. The breakeven cut-off net Smelter Return (NSR) for underground mining at BP33 and Grants Underground is $110/t NSR and $125/t
NSR for Carlton Underground.
6. Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated Mineral Resources were used to estimate
Probable Ore Reserves.
7. Tonnage and grade estimates include dilution and recovery allowances.
8. The tonnage and grade for TSF/Stockpile is estimated from the operations reconciled monthly production records.
9. The Reserves are defined at the point where the ore is delivered to the processing plant.
10. The Ore Reserves reported above are not additive to the Mineral Resources.
11. Totals within this table are subject to rounding.
Further commentary on the updated Ore Reserve Estimate is provided in the Supporting Information Section
below, followed by the required JORC Table 1.
corelithium.com.au
4
Carlton Exploration Target
Core has defined an Exploration Target of 1.2 to 1.8Mt at a grade of between 1.2 and 1.4% Li2O below the existing
Carlton Mineral Resource (ML31726, Figure 1).
Cautionary Statement: The potential quantity and grade of the Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
The new Exploration Target is in addition to the Mineral Resource Estimate of 48.5Mt @ 1.26% Li 2O already
defined by Core at Finniss and is summarised in Table 3.
Planned drilling to test the Exploration Target is shown in Figure 2. Due to cost efficiencies and the planned
underground mining method, drilling to test the exploration target will be undertaken from underground drilling
positions as part of future mining operations, rather than surface drilling. The timing of undertaking the planned
2,000m of drilling required to test the Target is contingent upon the commencement of mining at the operation.
Table 3 Exploration Target
Exploration Target
Carlton
Tonnage (Mt)
Li2O (%)
Low
High
Low
High
1.2
1.8
1.2
1.4
The Exploration Target has been determined after a review of existing exploration results, geological modelling
and consideration of the outcomes of the Restart Study. Details for the Exploration Target at Carlton is outlined
below.
There is an existing Mineral Resource Estimate at Carlton of 6.3Mt @ 1.3 % Li2O1 that remains open at depth.
Based on the outcomes of the current Restart Study 2, it is likely that mining operations could extend below the
current limits of the Mineral Resource. Therefore, an Exploration Target has been defined down plunge of the
current Mineral Resource (Figure 2).
A shape has been interpreted that is extrapolated from the base of the current Mineral Resource approximately
850m below surface, down plunge to a vertical depth of approximately 1,200m below surface. This is considered
a reasonable assumption based on current mining parameters and studies completed. Variations in the average
thickness at depth of the known Mineral Resource of between 7 to 9 metres true width, together with an average
specific gravity of 2.70 g/cm3 results in a tonnage range estimate of 1.2 to 1.8 Mt for the extrapolated interpreted
body. The average grade for Carlton is 1.3% Li2O, however, as noted in the ASX release on 6 September 2023 3
and shown graphically below, the three deepest holes NMRD050, NMRD060 and NMRD062 have grades ranging
from 1.13 to 1.41% Li2O. Based on these holes and the overall grade range of the Mineral Resources, the
Exploration Target is estimated to grade between 1.2 to 1.4% Li 2O.
1
Refer to ASX announcement “Finniss Mineral Resource increased by 58%” on 11 April 2024 and “Updated Finniss Lithium Project Reserve
and Resources” on 14 May 2025”. The Carlton MRE of 6.3Mt @1.3% is comprised of Measured MRE of 2.14Mt @ 1.33% Li2O, Indicated
MRE of 3.43Mt @ 1.32% Li2O and Inferred MRE of 0.78Mt @ 1.14% Li2O.
2
Refer to ASX announcement “Restart Study Repositions Finniss Operations” on 14 May 2025.
3
Refer to ASX announcement “Development Projects Update - BP33 and Carlton” on 6 September 2023.
corelithium.com.au
5
Figure 2 Carlton long section showing the Exploration Target with some previous deeper drilling results.
corelithium.com.au
6
This announcement has been approved for release by the Board of Core Lithium Ltd.
For further information, please contact:
Investor Enquiries
Media enquiries
Paul Brown
Michael Vaughan
CEO
Executive Director
Core Lithium Ltd
Fivemark Partners
+61 8 8317 1700
+61 422 602 720
info@corelithium.com.au
michael.vaughan@fivemark.com.au
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained shareholder value from critical minerals exploration and
mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au
corelithium.com.au
7
Important Information
This announcement may reference forecasts, estimates, assumptions and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
Competent Person Statements
The Mineral Resources and Ore Reserves underpinning the production target and forecast financial information
in this announcement have been prepared by competent persons in accordance with the requirements of the
JORC code.
The information in this announcement that relates to the Estimation and Reporting of Mineral Resources at the
Finniss Project and the Carlton Deposit was first reported in announcements of 11 April 2024 and 14 May 2025.
It is available to view on the ASX and the Company’s website. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market announcement, and
that all material assumptions and technical parameters underpinning the estimates continue to apply and have
not materially changed. The Company confirms that the form and the context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement. The Competent
Person responsible for the original announcement was Dr Graeme McDonald, a member of the Australian Institute
of Mining and Metallurgy and the Australian Institute of Geoscientists.
The information in this release that relates to the Estimation and Reporting of Ore Reserves is based on, and
fairly represents, information and supporting documents compiled by Mr Tom Joseph employed as Principal
Mining Engineer by Core Lithium and who is a Member of the Australasian Institute of Mining and Metallurgy.
Tom Joseph is a Competent Person as defined by the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”, having more than five years’ experience that is
relevant to the style of mineralisation and type of deposit. Mr Tom Joseph consents to the inclusion in the Public
Report of the matters based on their information in the form and context in which it appears. The announcement
references the Mineral Resource and Ore Reserves update as of 5 September 2025.
The information in this release that relates to the Estimation and Reporting of metallurgical results is based on,
and fairly represents, information and supporting documents compiled by Mr Michael Di Trento employed as Head
of Processing and Operations Readiness by Core Lithium and who is a Member of the Australasian Institute of
Mining and Metallurgy. Michael Di Trento is a Competent Person as defined by the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”, having more
than five years’ experience that is relevant to the style of mineralisation and type of deposit. Mr Michael Di Trento
consents to the inclusion in the Public Report of the matters based on their information in the form and context in
which it appears.
Core confirms that it is not aware of any new information or data that materially affects the exploration results,
exploration target and estimates included in this announcement as cross referenced in the body of this
announcement and that all technical parameters and material assumptions underpinning the Mineral Resources,
Ore Reserves and production target and forecast financial information derived from the production target continue
to apply and have not materially changed except as reported within this release. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original announcements related to previously reported exploration results, exploration target, Ore Reserve
Estimate and Mineral Resource Estimate.
All references to Ore Reserves are Ore Reserve Estimates and references to Mineral Resources are Mineral
Resource Estimates.
corelithium.com.au
8
SUPPORTING INFORMATION
MINERAL RESOURCE
There has been no change to the Mineral Resources. Refer to “Updated Finniss Lithium Project Reserve and
Resource” ASX release on 14 May 2025.
ORE RESERVES
Proved and Probable Ore Reserves were estimated for the Carlton underground deposits. Measured Mineral
Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were converted to Probable
Ore Reserves with the application of modifying factors. The effective date of the Updated Carlton Ore Reserves
is 5 September 2025. There has been no other change to the Ore Reserve Estimate from 30 April 2025.
The Carlton Ore Reserve has increased to 4.5Mt as at 5 September 2025 due to the reclassification from inferred
to indicated material, as well as processing updates detailed in the Restart Study and a change to the mining
method from leaving pillars to paste backfilling.
Ore Reserves were estimated for Carlton with inputs including mine design, all modifying factors, processing
flowsheet and recoveries, and physical constraints. The accuracy and confidence of the inputs are, as a minimum,
to a Pre-Feasibility level. To estimate Ore Reserves, the CP has:
▪
Completed mine planning studies, including the operating and capital cost forecasts for Life of Mine (LOM)
based on Measured and Indicated Mineral Resources only.
▪
Reviewed information on historical and previous mine performance, including operating costs and
processing recoveries.
▪
Updated the mining method and LOM designs and associated study documents, including geotechnical,
hydrological, ventilation, and processing assumptions.
▪
Verified LOM operating and capital costs.
▪
Completed LOM plans based on the mine sequencing.
▪
Compiled an economic model based on the LOM schedule, which included Measured and Indicated
Mineral Resources only.
▪
Identified no physical constraints to mining, for example, tenement boundaries, infrastructure, protected
zones (flora, rivers, roads, and road easements).
In addition, the CP has determined that:
▪
The mining method selected for the Carlton Ore Reserve was Long Hole Open Stoping (LHOS) with paste
filling based on a detailed mining method analysis.
▪
The processing method selected is DMS and gravity.
▪
The recovery factors varied based on the feed grade and staged improvements in the plant. The
allowances for mica and phyllite are in line with the staged improvements in the plant.
▪
The breakeven cut off Net Smelter Return (NSR) was based on the mining cost, processing cost, transport
cost, royalty and G&A cost.
▪
Mining costs are derived from the first principles based on an owner operator cost profiles.
▪
The regulatory approvals are expected to be in place when required for the commencement of Carlton.
corelithium.com.au
9
GEOTECHNICAL
The geotechnical information used to support the underground mine designs that constrain the Ore Reserve
estimate has come from additional geotechnical work completed during 2025 by Geotechnical Consultants. The
geotechnical model was developed utilising the extensive resource database, pre-feasibility level geotechnical
data and the geotechnical data derived from field and laboratory investigations.
MINING
To complete the Mine Stope Optimiser (MSO), the block model was updated to incorporate Gravity and DMS
recovery parameters based on the Carlton metallurgical test results. The NSR value was calculated for each block
in the block model. The MSO was then run to generate stope shapes at NSR cut-off ranges. The quantities at
each NSR do not materially change until the higher NSR values are used to generate the stope shapes. This
indicates that the minable quantities are not highly sensitive to price changes, which reflects the geometry and
grade tenure of the deposit.
Mining Dilution and Recovery Factors
Mining dilution and recovery factors for each different stoping areas were estimated and used in the mine plan.
The Expected Linear Overbreak/Slough (ELOS) empirical assessment results were applied based on the
geotechnical assessment by external consultants. Paste overbreak is applied to the secondary stope sidewalls
mined adjacent to the backfilled stope. Also, backfill overbreak is applied to both the top and floor of the sill
pillars. The global recovery factor is 93% and the global dilution factor is 6%. The confidence of the factors
applied to the mine plan are at a prefeasibility level.
Cut-Off
The cut-off grade used in the Mineral Resource Estimate for Carlton was 0.5%. The Carlton Ore Reserve is
derived directly from the Carlton Mineral Resource. The cut-off applied was based on NSR, which is the net
revenue paid for the concentrate. NSR is calculated as the In Situ value after allowances have been made for
concentrate price, plant recovery, mining cost, processing cost, transport cost and royalty. The NSR Cut off $125/t
was used to report Carlton Reserve.
The parameters for the cut-off NSR analysis may vary from those used in the financial model. Based on the
analysis, if the financial parameters were applied to the cut-off NSR no material change to the stope optimisation
would result.
Mining Method Selection
The Carlton deposit is NNE-striking, steeply east-dipping and south-plunging body of 200m length at surface and
up to 25m true width (average 15m). After detailed mining method analysis considering the economic value of
Carlton orebody, stripping ratio, recovery of orebody, and production profile, underground mining is considered
appropriate for the Carlton deposit. The ore body width, vertical orientation, and competent host rock ground
conditions allow long hole open stoping (LHOS) to be considered as a suitable mining method.
The mining Infrastructure required to support the mine plan has been considered, including waste rock dumps,
ROM pad, haul roads, crusher and processing plant, Fines Storage Facility, explosives storage facility, water
storage, workshops, and other buildings required for mining operations. The existing infrastructure at Grants will
provide majority of the infrastructure required.
Mining Method: The bottom-up LHOS/benching with paste fill mining method mined in longitudinal sequence.
Dual access is provided to the ore body from the decline. Sublevels are mined from two directions in a centre out
sequence.
corelithium.com.au
10
Grants to Carlton Link
The Carlton Decline is accessed by a 1.2km underground link from the Grants pit as shown in Figure 3.
Figure 3 Carlton Link
Below is a summary of the mine design parameters and stope sequencing applied for the LOM plan as presented
in this Report.
Figure 4 Layout for Level
corelithium.com.au
11
Mine Design
The design criteria are summarised below:
▪
Decline capital development – 5.5m wide by 6.0m high
▪
Ore Development – 5.0m wide by 5.0m high
▪
45m sublevels above 400m depth, with 15m sill pillars after every 90m.
▪
Extraction of sill pillars above 400m after levels above and below the sill are extracted and backfilled. Sill
pillars are to be mined in retreat sequence and will not be backfilled, above 400m
▪
30m sublevels below 400m depth.
▪
20m stopes along strike.
Mining Schedule and Sequence
Based on the mine design, the stoping sequence was scheduled using Deswik software. The key activity rates
applied in the mining schedule include:
▪
The decline development rate was assumed to be similar to the rates used for BP33.
▪
Production drilling rate of 200m per day.
▪
Stope bogging rate of 2,000 tonnes per day
The mine is divided into six panels, each with a vertical extent of between 90m for the top five panels and 120m
for the bottom panel six. The mine panels for Carlton are shown in Figure 5.
Figure 5 Carlton Panel Layout
corelithium.com.au
12
The key outcomes of the Carlton mining and production schedule are shown graphically in Figure 6.
Figure 6 Carlton Production Schedule
PROCESSING
The process plant flowsheet design and concentrate logistics assumed are consistent with the 2025 restart study
which has been conducted to optimise the dense media processing plant recovery of coarse grained spodumene
ore found at Grants, BP33 and Carlton. The metallurgical process of dense media separation proposed for Carlton
is well tested for spodumene ore, is commonly utilised in industry and based on the laboratory test conducted is
expected to be suitable for Carlton ore.
Refer to ASX announcement “Restart Study Repositions Finniss Operations” on 14 May 2025 for details.
Subsequent to the 2025 restart study, further laboratory based heavy liquid separation test work program was
conducted by Nagrom comprising 30 drill core samples. Selected samples are spatially representative of the
Carlton deposit and enable metallurgical performance variability to be determined.
Samples selected comprised of 2-3m of core each. The sample selection criteria:
•
Core selection must be of a continuous intercept section.
•
Combined core grade of core represented the proposed mining stope grade of the orebody in that zone.
•
Where high grade fluctuation was observed in dill hole assay multiple samples were collected.
corelithium.com.au
13
Figure 7 Carlton ore deposit with drill hole overlaid
corelithium.com.au
14
Figure 8 HLS test data results recovery versus Li2O head grade
Test results have been scaled to represent the full processing plant flowsheet performance inclusive of expected
deleterious rock dilution.
The overall recovery including the allowance for deleterious elements was determined for the Carlton deposit to
be 70.1% producing Li2O concentrate. The test results were incorporated into the block model to determine the
cutoff grade and form the Ore Reserve estimate.
INFRASTRUCTURE
Principal infrastructure items to be put in place to support the Carlton have been considered in the capital estimate
and development schedule:
▪
Backfill paste plant to support Carlton underground mining
▪
Carlton Underground Decline Link
▪
Ventilation system
▪
Dewatering system
▪
Mine surface and underground infrastructure
CONCENTRATE TRANSPORT
Concentrate road transport is in place by the Cox Peninsula Road from the Grants Processing Plant to the port
of Darwin as previously utilised in operations.
corelithium.com.au
15
COSTS
Costs have been calculated based on the mining schedule for Carlton underground deposit. The capital and
operating costs were estimated by using independent consultants and derived from quotations from experienced
contractors, current contracts, other suppliers, and current project costs.
Carlton has a pre-production capital cost of $66 million, and the total capital cost is $210 million. Owners Costs
and G&A costs were prepared by Core and benchmarked against similar operations and is consistent with restart
study.
Carlton operating unit costs:
▪
Underground Mining: $80/t Ore
▪
Finniss Processing and Tailings: $41/t Ore
▪
Finniss G&A: $12/t Ore
REVENUE
Consensus pricing forecasts and project benchmarking was sourced and reviewed by independent consultants in
real terms for a 6.0% spodumene concentrate. A price adjustment is assumed for saleable product above 5.0%
spodumene concentrate.
A market and customer analysis has been completed. Modelled prices and volumes for spodumene concentrate
were based on existing offtake contract which accounts for various concentrates produced. Spodumene
concentrate has been previously supplied under this contract.
Revenue was calculated as the In Situ value after allowances have been made for:
▪
Recovery to concentrate
▪
Concentrate transport
▪
Taxes and Royalties
▪
Gross revenue assumes 100% of Spodumene sales in line with the current offtake agreement
ECONOMICS
The economic analysis used the study assumptions for the Carlton underground mine, which is up to a Prefeasibility level of accuracy. Sensitivities of +/-20% were prepared for discount rate, exchange rates, spodumene
price, capital expenditure and site operating costs. The sensitivity analysis was prepared in line with the Prefeasibility study level of accuracy for each of the key value drivers. For each adjustment, the Reserves returned
positive NPV results. The economics were not as sensitive to the capital and operating costs as the commodity
price.
APPROVALS
Core expects the regulatory and environmental approvals will be in place when required for the development of
the Carlton mine.
corelithium.com.au
16
Appendix 1 JORC Code,2012 Edition-Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
JORC Code Explanation
Commentary
• Nature and quality of sampling (e.g.
cut channels, random chips, or
specific
specialised
industry
standard
measurement
tools
appropriate to the minerals under
investigation, such as downhole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken
to ensure sample presentively and
the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’
work has been done, this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual
commodities
or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
• Drilling geology, assays and resource
estimation results at Carlton relate to reverse
circulation (RC)
Share your feedback
Discover