30 July 2025
ASX: CXO Announcement
June Quarterly Activities Report
Australian lithium company Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide its
quarterly activities report for the quarter ended 30 June 2025.
Summary
•
Repositioning of the Finniss Lithium Project (Finniss) as a highly attractive, low-cost
underground mining operation with a 20-year life following completion of the Restart Study
•
High confidence mine plan with the first 10 years of operations backed by Ore Reserves of
10.73Mt at 1.29% Li2O1
•
Simplified and debottlenecked process flowsheet with operating costs reduced by 33%2 to
$40–$46/t3 (from $69/t) with increased production of 7%1 through higher throughput
producing a nameplate production of 205ktpa SC6 equivalent coarse-grained concentrate
•
Finalising the acquisition and ownership of the crushing plant, completing the shift to full
ownership of all site infrastructure and reducing estimated future crushing costs by half
•
Core closed the financial year with $23.5 million in cash (31 March 2025: $29.8 million),
following a successful transition to care and maintenance at Finniss and the settlement of
key existing liabilities, positioning the Company strongly for the year ahead
•
Strategic funding process progressing to support the advancement of Finniss with a focus
on minimising shareholder dilution
•
Core recently hosted a group of equity analysts for a site tour of the Finniss operation,
showcasing the significant opportunities identified through the Restart Study
•
Termination of an existing offtake agreement through US$2.0 million payment, which will
unlock greater flexibility to engage with new strategic opportunities
1
Refer to ASX announcement “Updated Finniss Lithium Project Reserve and Resource” on 14 May 2025.
Percentage changes are with reference to amounts disclosed in the 2024 Lithium Ore Reserve Update. Refer to ASX announcement "Lithium Ore Reserve
Update" on 25 September 2024.
3
Refer to ASX announcement "Finniss Repositioned as a Highly Attractive Low-Cost Operation with a 20-Year Life“ on 14 May 2025. The range disclosed
above is inclusive of relevant contingency.
2
corelithium.com.au
Commenting on the June quarter 2025, Core CEO Paul Brown said:
“Completion of the Restart Study work programs and release of the study to the market was a standout highlight
in the June quarter.
We achieved our objective of demonstrating a pathway for Finniss to produce significantly higher margin volumes
of spodumene concentrate by adopting a revised mine plan and processing strategy with reduced capital
investment relative to the previous operating model.
Finniss has many positive attributes that have been leveraged through our restart plan – established infrastructure,
high-grade ore bodies well suited to low-cost underground mining and a proven processing plant with opportunity
for performance optimisation.
Following the release of the Restart Study, Core hosted a group of equity analysts and investors at Finniss to
showcase the value creation opportunity. We were encouraged by the positive feedback as we undertake a
strategic funding process with our advisors, Morgan Stanley.
Over the financial year, Core took steps to simplify its contractual position, which has been key in reducing
liabilities and strengthening our financial position. These strategic decisions have enhanced our balance sheet
flexibility, positioning the business for a more resilient restart.
Notably, expenditure, excluding the one-off payment to Yahua, decreased by 67% from the March quarter. We
are well positioned to advance the restart of Finniss, with a capital-efficient plan, a cleansed balance sheet and
the right strategic funding process underway.”
Sustainability
Core remains in compliance with all water discharge requirements. There were no environmental exceedances
due to mine water discharge in 2025.
Care and maintenance activities progressed across multiple areas at Finniss, with no safety incidents reported
during the quarter. Year to date safety performance remains strong.
The planned installation of a submersible pump in Grants Pit significantly improved dewatering efficiency with the
volume of water discharged in 2025 increasing by 15%. Compared to diesel-powered pumps, the submersible
system has led to savings in labour, maintenance and diesel use. Additional savings were achieved by significantly
increasing the use of siphons for water transfer and discharge in lieu of pumping. The outcome of these measures
was a reduction in diesel usage and a significant reduction in unit costs for dewatering.
Balance Sheet
Core ended the quarter with $23.5 million cash at bank (31 March 2025: $29.8 million).
Cash outflows were in line with expectations. The recurring costs for the quarter consisted of site maintenance;
costs associated with the restart strategy and exploration. The key movements in the Company’s cash during the
quarter were:
•
One-off non-recurring payment of $3.1 million (US$2.0 million) in relation termination of the Yahua offtake
agreement
•
Finniss site maintenance costs of $0.3 million primarily related to DMS plant care and maintenance for
operational readiness, and site salaries
•
Exploration expenditure of $0.5 million, primarily related to exploration salaries and tenement rents
•
Expenses relating to Restart Study, employee and other corporate-related expenses of $2.4 million
Core has made strategic decisions that have contributed to a reduction in liabilities, strengthening our financial
position and enhancing our balance sheet flexibility. Expenditure, excluding the one-off payment to Yahua,
reduced by 67% from the March quarter. Exploration and any activities relating to FID will be considered subject
to market conditions and funding opportunities.
corelithium.com.au
2
Core continues to maintain a stockpile of approximately 5,000 tonnes of spodumene concentrate and 75,000
tonnes of lithium fines, which remain available for sale should market conditions improve.
Finniss Lithium Operations
Restart Study site visit
Following the release of the Restart Study, Core hosted a group of equity analysts and investors at Finniss on 16
and 17 June 2025 with a tour of existing site infrastructure and outlining plans to further develop and enhance the
project’s assets.
Restart Study
The Company completed a comprehensive, bottom-up assessment of the Finniss operation, with a focus
developing a new mining and processing plan to reduce the cost base and improve operating efficiency. A Restart
Study outlining the outcomes of this work was released to the ASX on 14 May 2025 4.
The Restart Study includes:
•
Optimised underground mine plans for the Grants, BP33 and Carlton deposits and a base case mining
schedule;
•
An enhanced process flowsheet and proposed process plant upgrades;
•
Detailed operating and capital cost estimates; and
•
Future upside opportunities.
An updated Ore Reserve and Exploration Targets for the Blackbeard and BP33 Deeps was also completed to
support the Restart Study and released to the ASX concurrently.
The Restart Study demonstrates a robust base-case operation with an updated Mine Life of 20 years and future
extension potential. Finniss boasts exceptional potential to grow beyond this base case production estimate.
A summary of the Restart Study outcomes is shown in Table 1. The location of Finniss, including key deposits and
infrastructure, is shown in Figure 1.
Table 1 Restart Study Summary
Key Metrics
Units
Amount
Life of Mine (LOM)
Years
20
Annual production throughput
ktpa
1,200
Ore processed (Ore Reserves)
Kt
10,726
Ore processed (feed total)
kt
17,575
Average feed grade
%
1.27
Global recovery
%
78
Nameplate annual concentrate produced (SC6 eq.)
ktpa
205
Concentrate Tonnes (SC6 eq.)
kt
2,911
4
Refer to ASX announcement “Restart Study Repositions Finniss Operations” on 14 May 2025
corelithium.com.au
3
Table 1 Restart Study Summary (continued)
Key Metrics
Units
Amount
$/t mined
63 – 72
Processing & tailings
$/t processed
40 – 46
Site General & Administration
$/t processed
9 – 10
Transport
$/t product
22 – 25
$/t
690 – 785
Pre-Production Capital
$ million
175 – 200
Sustaining Capital
$/t mined
20 – 22
Operating Costs
Mining
Operating Cost (FOB SC6 eq. excluding royalties)
Capital Costs
It should be noted that all costs are presented in AUD (unless otherwise stated).
Upside Opportunities
The Restart Study identified several opportunities to enhance the restart plan, including pathways to improve
returns, extend mine life, and increase production.
Process improvements
Opportunities exist to enhance processing performance by increasing DMS feed efficiency and improving
recovery. Further refinement of mining practices may also reduce dilution, contributing to higher feed grades and
better plant outcomes.
Increased production and LOM extension
Immediate potential exists to target increased ore production from Finniss to extend the mine life. The Study mine
plan only includes the Grants, BP33, and Carlton deposits defined Mineral Resources. Several prospects are
planned to potentially increase the LOM mineable quantities in future work programs; these include Blackbeard
and BP33 Deeps.
Throughput expansion
Further studies are underway to investigate the potential to increase the plant throughput beyond 1.2Mpta.
Potential feed material could be sourced to support this expansion through bringing forward mining at Carlton and
the potential addition of Blackbeard with exploration success.
corelithium.com.au
4
Figure 1
Location of the Finniss Operation including key deposits and infrastructure
Mineral Resources
As part of the Restart Study, the Mineral Resource Estimate (MRE) and Ore Reserves for Finniss was updated
during the period. This resulted in an increase of 0.6% to the MRE with an additional 310kt @ 0.66% Li2O
estimated for mineralised material within the Tailings Storage Facility and coarse reject stockpiles. 5
Finniss Mineral Resources are shown in Table 2.
Table 2 Finniss Project Mineral Resources
Resource Category
Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Measured
6.3
1.41
89
Indicated
21.9
1.29
283
Inferred
20.3
1.18
239
Total
48.5
1.26
610
Ore Reserves
The Finniss Ore Reserve increased by 15.9% with 8.4% increase in contained metal. The BP33 Ore Reserve
increased by 7.0% from 8.7Mt @ 1.38 Li2O to 9.29Mt @ 1.31 Li2O as a result of updated modifying factors. The
Grants Ore Reserve increased from 0.57Mt @ 1.40 Li2O to 1.15Mt @ 1.31 Li2O by changing from an open pit to
underground mining method.
5
Refer to ASX announcement “Updated Finniss Lithium Project Reserve and Resource” on 14 May 2025
corelithium.com.au
5
Proved and Probable Ore Reserves were estimated for the Grants and BP33 underground deposits. Measured
Mineral Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were converted to
Probable Ore Reserves with the application of modifying factors. The effective date of the Ore Reserves is 30
April 2025.
Finniss Ore Reserves are shown in Table 3.
Table 3 Ore Reserve Estimate including contained metal
Deposit
BP33 Underground
Grants Underground
TSF/Stockpiles
Total
1.
2.
3.
4.
5.
6.
7.
8.
Category
Ore Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Proved
2.55
1.27
32.4
Probable
6.74
1.32
88.8
Total
9.29
1.31
121.2
Proved
0.87
1.29
11.2
Probable
0.28
1.36
3.8
Total
1.15
1.31
15.1
Proved
-
-
-
Probable
0.28
0.68
1.9
Total
0.28
0.68
1.9
Proved
3.42
1.28
43.6
Probable
7.3
1.3
94.6
Total
10.73
1.29
138.2
Effective date of the Ore Reserves is 30 April 2025.
Ore Reserves are the total for the Grants and BP33 Mines and the mineralised material within the TSF/stockpiles.
The long-term Spodumene price used for calculating the financial analysis is US$1,330/t. The analysis has been calculated with
assumptions for crushing, processing and treatment charges, deductions and payment terms, concentrate transport, metallurgical
recoveries, and royalties.
The breakeven cut-off for underground mining is $110/t NSR.
Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated Mineral Resources were used to estimate
Probable Ore Reserves.
Tonnage and grade estimates include dilution and recovery allowances.
The Ore Reserves reported above are not additive to the Mineral Resources.
Totals within this table are subject to rounding.
Insufficient work has been completed at Carlton to report an Ore Reserve. Core has commenced further study
work capturing the outcomes from the Grants and BP33 Ore Reserves and the Study. Core will be targeting an
updated Ore Reserve for Carlton however there is no certainty this work will result in the reporting of an Ore
Reserve for Carlton.
Further commentary on the updated MRE and Ore Reserve, including Table 1 disclosures, is provided in the
Company’s ASX announcement Updated Finniss Lithium Project Ore Reserve and Mineral Resource Estimate
dated 14 May 2025.
Exploration Target
An Exploration Target of 10.9Mt – 16.5Mt at a grade of between 1.5% and 1.7% Li2O was defined by the Company
across two different deposits. Exploration Targets have been defined at the existing BP33 Mineral Resource
(ML32346) and at the Blackbeard deposit within MLN1148.
Cautionary Statement: The potential quantity and grade of the Exploration Target is conceptual in nature. There
has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result
in the estimation of a Mineral Resource.
The new Exploration Target is in addition to the Mineral Resource Estimate of 48.5Mt @ 1.26% Li 2O already
defined by Core at Finniss and is summarised in Table 4.
corelithium.com.au
6
Table 4
Blackbeard and BP33 Exploration Targets
Exploration Target
Tonnage (Mt)
Li2O (%)
Low
High
Low
High
Blackbeard
7.0
10.0
1.5
1.7
BP33
3.9
6.5
1.5
1.6
Total
10.9
16.5
1.5
1.7
Exploration
Gold Exploration
The Mt Shoobridge prospect, part of Core’s wholly owned Shoobridge Gold Project, is strategically located
approximately 10km from the Stuart Highway and 60km from the Union Reefs gold processing plant, within the
Pine Creek Orogen – a region that hosts multiple multi-million-ounce gold deposits. With gold prices trading near
record highs, Shoobridge offers a strategic opportunity alongside Core’s primary lithium focus.
Desktop evaluation was undertaken to better define the large, shallow gold system at Mt Shoobridge. Geological
interpretation and modelling are in progress and will underpin preliminary understanding of the geometry,
continuity, and controls on mineralisation to assist in guiding future drill targeting. This work will also help support
preliminary considerations and testing related to bulk mining potential, metallurgical and economic studies.
Planning for mapping and sampling at several regional Shoobridge Project targets was completed (Figure 2). The
regional targets are comparable in scale to Mt Shoobridge but considered untested or undertested. Exploration
activities across these areas are scheduled to commence during the second half of 2025, with the aim of
prioritising regional targets for follow-up exploration.
Figure 2
Regional Targets at the Shoobridge Gold Project
corelithium.com.au
7
Lithium Exploration
At Blackbeard, planning is underway for a diamond drilling program in FY26. This program is designed to test the
geology and lithium mineralisation associated with the Exploration Target at depth. The objective is to gather
sufficient geological data to assess the potential for a future Mineral Resource Estimate.
At the Anningie-Barrow Creek project, a gravity data survey was completed during May and June. This has
provided insights into the geology of the northern part of the Barrow Creek pegmatite field in the area of Ringing
Rocks. Further work is being assessed.
Corporate
Settlement of Offtake Agreement
During the quarter Core settled the existing offtake agreement with Yahua International Investment and
Development Co. (Yahua) in relation to sale of spodumene concentrate. 6
The Company signed this agreement with Yahua in 2019 and updated the arrangement with a supplementary
agreement in 2022.7 The agreement is now terminated through the execution of a comprehensive, legally binding
deed of release.
As part of the settlement, the Company agreed to pay $3.1 million (US$2.0 million) in cash which was settled
during the quarter.
Termination of the offtake agreement will unlock previously contracted offtake tonnes and provide greater flexibility
for the Company to engage with new strategic partners.
Other disclosures
As at 30 June 2025, Core had the following capital structure:
•
2,143,015,544 ordinary shares
•
17,034,852 unquoted performance rights
•
7,500,000 unquoted options
Core’s Appendix 5B includes an amount of $131k in item 6.1. The amount in item 6.1 represents director fees
paid to entities nominated by relevant directors.
The previously reported Ore Reserve Estimate (ORE) (Lithium Ore Reserve Update on 25 September 2024) is
comprised of:
•
Grants open pit ORE – Proved ORE of 0.53Mt @ 1.40 Li2O and Probable ORE of 0.04Mt @ 1.48 Li2O
•
BP33 Underground ORE – Proved ORE of 2.43Mt @ 1.33 Li2O and Probable ORE of 6.25Mt @ 1.40
Li2O.
Core confirms that it is not aware of any new information or data that materially affects the results included in this
announcement as cross referenced in the body of this announcement, including “Positive Gold and Lithium
Results at Shoobridge” released on 18 September 2024, and that all technical parameters and material
assumptions underpinning the Mineral Resources, Ore Reserves and production target and forecast financial
information derived from the production target continue to apply and have not materially changed except as
reported within this release. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original announcements related to previously
reported exploration results, Ore Reserves and Mineral Resources. The announcement references the Mineral
Resource and Ore Reserves update as at 30 April 2025.
6
Refer to ASX announcement “Settlement of Yahua Offtake Agreement” on 12 May 2025
Refer to ASX announcement “Yahua Increases Lithium Concentrate Offtake Commitment” on 1 April 2019
corelithium.com.au
7
8
Tenements
Tenement number
Tenement name
Interest at the end
of Quarter
Changes during
the Quarter
South Australia
EL 6574
Fitton
100%
None
EL 6038
Mt Freeling
100%
None
EL 6111
Yerelina
100%
None
EL 6445
Northern Territory
EL 26848
Wyatt Bore
100%
None
Walanbanba
100%
None
EL 28029
White Range East
100%
None
EL 28136
Blueys
100%
None
EL 29347
Yambla
100%
None
EL 29389
Mt George
100%
None
EL 29580
Jervois East
100%
None
EL 29581
Jervois West
100%
None
EL 29698
Finniss
100%
None
EL 29699
Bynoe
100%
None
EL 30012
Bynoe
100%
None
EL 30015
Bynoe
100%
None
EL 30793
McLeish
100%
None
EL 31058
Barrow Creek
100%
None
EL 31126
Zola
100%
None
EL 31127
Ringwood
100%
None
EL 31139
Anningie West
100%
None
EL 31140
Anningie South
100%
None
EL 31145
Barrow Creek North
100%
None
EL 31146
Barrow Creek South
100%
None
EL 31271
Bynoe
100%
None
EL 31279
Sand Palms
100%
None
EL 31407
Shoobridge
100%
None
EL 31449
EL 31886
Napperby
Adelaide River
100%
100%
None
None
EL 32205
Finniss Range
100%
None
EL 32392
Ivy
100%
None
EL 32396
Murray Creek
100%
None
EL 33932
Bloodwood
100%
Granted 11 Apr-25
EL 33933
West Dam
100%
Granted 11 Apr-25
.
corelithium.com.au
9
Tenements(cont.)
Tenement number
Tenement name
Interest at the end
of Quarter
Changes during
The Quarter
EMP 28651
Observation Hill (Extractive Lease)
100%
None
ML 29912
Saffums
100%
None
ML 29914
Labelle
100%
None
ML 29985
Angers North
100%
None
ML 31654
Annie/Old Crusher
100%
None
ML 31726
Grants Mineral Lease
100%
None
ML 32074
Observation Hill (Ancillary Lease)
100%
None
ML 32278
Grants Dam (Ancillary Lease)
100%
None
ML 32346
BP33 Mineral Lease
100%
None
MLN16
Bynoe
100%
None
MLN813
Bilatos
100%
None
MLN1148
Centurian
100%
None
Northern Territory
This announcement has been approved for release by the Core Lithium Board:
For further information, please contact:
Investor Enquiries
Paul Brown
CEO
Core Lithium Ltd
+61 8 8317 1700
info@corelithium.com.au
Media enquiries
Michael Vaughan
Executive Director
Fivemark Partners
+61 422 602 720
michael.vaughan@fivemark.com.au
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the Finniss
Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port, Northern
Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration and mining
projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au
Important Information
This announcement may reference forecasts, estimates, assumptions, and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
corelithium.com.au
10
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Core Lithium Ltd
ABN
80 146 287 809
Consolidated statement of cash flows
1.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.
2.1
2.2
2.3
2.4
Cash flows from operating activities
Receipts from customers
Payments for
exploration & evaluation
development
production
staff costs
administration and corporate costs
care and maintenance
Dividends received (see note 3)
Interest received
Interest and other costs of finance paid
Income taxes paid
Government grants and tax incentives
Other – restart study costs
Net cash from / (used in) operating
activities
Cash flows from investing activities
Payments to acquire or for:
entities
tenements
property, plant and equipment
exploration & evaluation
investments
other non-current assets - mine
development
Proceeds from the disposal of:
entities
tenements
property, plant and equipment
investments
other non-current assets
Cash flows from loans to other entities
Dividends received (see note 3)
Quarter ended (“current quarter”)
30 June 2025
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
(3,028)
(1,172)
(4,002)
(264)
266
(9)
(430)
(5,611)
(13,599)
(6,632)
(9,660)
(11,094)
1,264
(47)
(1,138)
(43,934)
(668)
-
(11,781)
(7,628)
(76)
-
-
-
corelithium.com.au
11
Consolidated statement of cash flows
2.5
2.5a
2.5b
2.6
3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4.
4.1
4.2
4.3
4.4
4.5
4.6
Other (Net proceeds / (payments) for
Security bond)
Other (Government grant co-funding (paid))
Other (Government grant co-funding
received)
Net cash from / (used in) investing
activities
Cash flows from financing activities
Proceeds from issues of equity securities
(excluding convertible debt securities)
Proceeds from issue of convertible debt
securities
Proceeds from exercise of options
Transaction costs related to issues of equity
securities or convertible debt securities
Proceeds from borrowings
Repayment of borrowings
Transaction costs related to loans and
borrowings
Dividends paid
Other (Payments of lease liabilities)
Net cash from / (used in) financing
activities
Net increase / (decrease) in cash and
cash equivalents for the period
Cash and cash equivalents at beginning of
period
Net cash from / (used in) operating activities
(item 1.9 above)
Net cash from / (used in) investing activities
(item 2.6 above)
Net cash from / (used in) financing activities
(item 3.10 above)
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
341
111
(918)
209
(557)
(19,853)
-
-
-
-
-
-
(148)
(148)
(626)
(626)
29,826
87,606
(5,611)
(43,934)
(557)
(19,853)
(148)
(626)
(24)
293
23,486
23,486
corelithium.com.au
12
5.
5.1
5.2
5.3
5.4
5.5
6.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Bank balances
Call deposits
Bank overdrafts
Other (provide details)
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
Current quarter
$A’000
Previous quarter
$A’000
23,486
23,486
29,826
29,826
Current
$A'000
Payments to related parties of the entity and their associates
quarter
6.1
Aggregate amount of payments to related parties and their
131
associates included in item 1
Aggregate amount of payments to related parties and their
6.2
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a
description of, and an explanation for, such payments.
7.
7.1
7.2
7.3
7.4
7.5
7.6
Financing
facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the
entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Loan facilities
Credit standby arrangements
Other (please specify)
Total financing facilities
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
-
-
Unused financing facilities available at quarter end
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
N/A
corelithium.com.au
13
8.
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Estimated cash available for future operating activities
Net cash from / (used in) operating activities (item 1.9)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
Total relevant outgoings (item 8.1 + item 8.2)
Cash and cash equivalents at quarter end (item 4.6)
Unused finance facilities available at quarter end (item 7.5)
Total available funding (item 8.4 + item 8.5)
$A’000
(5,611)
(668)
(6,279)
23,486
23,486
Estimated quarters of funding available (item 8.6 divided by
3.7
item 8.3)
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3,
answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available
must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above
must be answered.
corelithium.com.au
14
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which comply with
Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 July 2025
Authorised by: By the Board
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market
about the entity’s activities for the past quarter, how they have been financed and the effect this has had
on its cash position. An entity that wishes to disclose additional information over and above the minimum
required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and
AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared
in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the
corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from
investing activities, depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here:
“By the board”. If it has been authorised for release to the market by a committee of your board of directors,
you can insert here: “By the [name of board committee – e.g. Audit and Risk Committee]”. If it has been
authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure
Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold
yourself out as complying with recommendation 4.2 of the ASX Corporate Govern