ASX: CXO Announcement
December Quarterly Activities Report
Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide its quarterly activities report for
the quarter ended 31 December 2025.
Summary
• Optimised mine plan for Grants is expected to deliver first ore within one month of
operations, accelerating revenue and reducing Finnis Lithium Project pre-production capital
by $35 - $45 million
• Updated Ore Reserve Estimate for Grants based on this new mine plan increases total
Finniss Ore Reserve Estimate to 15.6Mt at 1.27% Li2O1
• Technical studies to support a positive Final Investment Decision (FID) for the Finniss
Lithium Project are advancing as planned, with the focus now transitioning to final
engineering design and operational readiness activities
• Strategic funding process advancing with continued interest and engagement with a range
of high-quality potential funding partners
• Successful divestment of non-core uranium assets to Elevate Uranium Ltd for $5 million
(cash and shares) plus a 1.0% Net Smelter Royalty for the Napperby Project (EL31449)
• Cash balance of $48.7 million at 31 December 2025 (30 September 2025: $35.9 million)
Commenting on the December quarter 2025, Core CEO Paul Brown said:
“The substantial body of work completed over the past 18 months has positioned Core strongly for the current
lithium market environment, which has recently shown signs of improvement in spodumene concentrate pricing
and investor sentiment.
Through the Restart Study process, we have comprehensively re-evaluated and reset the Finniss Lithium Project.
This work has included resolving key contractual matters and terminating all existing offtake arrangements,
leaving Finniss as an attractive, unencumbered development with strong leverage to prevailing and improving
market conditions.
During the December quarter, the Company advanced detailed technical and engineering work to further de-risk
and enhance the outcomes of the May 2025 Restart Study. The delivery of the updated mine plan and Ore
Reserve for the Grants deposit represents a material improvement to the Project, enabling earlier ore delivery,
increased open pit production, and a reduction in pre-production capital of up to $45 million.
Core enters the 2026 calendar year focused on concluding operational readiness and funding workstreams, with
the objective of enabling a Final Investment Decision for Finniss and a subsequent restart of operations.”
1
Refer to ASX announcement “Updated Grants Mine Plan and Ore Reserve” on 10 November 2025.
corelithium.com.au
2
Sustainability
Care and maintenance activities continued across multiple areas at Finniss. No recordable injuries, safety or
environmental incidents were reported during the quarter or for the year to date.
Drains and sediment basins at both Grants and BP33 were cleaned and prepared for the wet season during
October to ensure maximum efficiency of operation of these structures.
Water extraction licenses required under legislation changes gazetted in September have been incorporated into
the Mining Management Plans for both Grants and BP33 which permit the extraction of ground water from open
pit or underground mining activities.
Water discharge at Grants commenced in November due to significant early rainfall resulting in creek flows
reaching levels to permit sustainable release. The addition of further siphons at Grants has allowed an increase
in short term discharge volumes during rainfall events. This change will allow for the full dewatering of the Grants
Pit during the current wet season if required.
Infrastructure to allow discharge from BP33 was installed during December along with pumping equipment to
facilitate transfer of water from the BP33 box cut to the mine water dam. This infrastructure will facilitate the full
dewatering of the box cut when required.
Financial Position and Capital Management
Balance sheet
Core ended the quarter with $48.7 million cash at bank (30 September 2025: $35.9 million).
Cashflows were in line with expectations, noting the following:
• One-off cash receipt from the sale of non-core uranium assets to Elevate Uranium $2.5 million
• Finniss site maintenance costs of $0.6 million primarily related to DMS plant care and maintenance for
operational readiness, and site salaries
• Exploration expenditure of $0.4 million, primarily related to exploration salaries and tenement rents
• Payment of $1.0 million relating to the outstanding mineral royalty liability with the NT government
• Expenses relating to employee and other corporate-related expenses of $4.4 million
• Key technical workstreams progressed to conclusion to support FID costs of $1.7 million
Core has made strategic decisions that have contributed to the significant reduction in liabilities, strengthening its
financial position and enhancing the balance sheet with all offtake, contingent liabilities and onerous contracts
from the operating period at Finniss now resolved.
All material exploration activities and initiatives related to FID are evaluated in the context of current funding and
their relevance to advancing the Finniss project towards FID.
We continue to evaluate our broader portfolio, including non-core tenements, to ensure capital and management
focus remain aligned with our strategy and near-term priorities.
Core continues to maintain a stockpile of approximately 5,000 tonnes of spodumene concentrate and 75,000
tonnes of lithium fines, which remain available for sale. In the context of improved market conditions, the Company
continues to monitor potential opportunities to monetise these stockpiles where it is commercially attractive.
Completion of Tranche 2 of the Placement
In late August 2025, the Company initiated a capital raising, whereby it received firm commitments to raise gross
proceeds of $50 million at a price of $0.105 per share through a two-tranche Placement (Placement) and the
launch of an SPP.
corelithium.com.au
3
Tranche 2 of the Placement consisted of the issue of approximately 198.1 million New Shares to raise ~$20.8
million. Approval of Tranche 2 was received at the Company’s Annual General Meeting (AGM) held on 10 October
2025, with settlement of the Tranche 2 shares occurring shortly after the meeting.
Finniss Lithium Operations
Updated Grants Mine Plan and Ore Reserve
Following the release of the Finniss Restart Study (Restart Study) on 14 May 20252, the Company has continued
to de-risk and refine its operating plan for Finniss (Figure 1).
Based on the outcomes of an updated geotechnical assessment for the Grants deposit, Core identified a
significant opportunity to bring forward revenue and reduce Grants pre-production capital costs.
Under a revised mine plan, Grants will now be initially mined as an open pit and will transition later to an
underground mine. This will reduce the re-establishment costs for Grants and bring first ore and revenue forward.
Pre-production capital for Grants is expected to be reduced by $35 - $45 million from the Restart Study estimate.
Underground mining recovery is also maximised by a change to the underground mining method to include waste
backfilling that can be sourced from underground development in Grants and Carlton link.
The updated Ore Reserve Estimate for Grants has been completed based on this revised plan, delivering a 33%
increase in overall tonnage and an increase in contained metal of 44%. The declaration of an upgraded Ore
Reserve at Grants leverages the substantial body of study work that has been conducted. The Ore Reserve and
related assumptions were developed and supported by independent consultants in conjunction with Core’s
Competent Persons.
There has been no change to the Mineral Resource Estimate (MRE) for the Finniss Project, which includes the
Grants deposit. The Finniss Project MRE is presented in Table 1.
Table 1 Finniss Project Mineral Resources Estimates
Mineral Resource Estimate for the Finniss Lithium Project
Mineral Resource Measured Indicated Inferred Total
Tonnes Li2O Tonnes Li2O Tonnes Li2O Tonnes Li2O Li2O
(Mt) % (Mt) % (Mt) % (Mt) %
Contained
Metal (kt)
Grants 1.34 1.48 0.61 1.49 0.37 1.27 2.32 1.45 33.6
BP33 2.85 1.44 6.51 1.55 1.14 1.59 10.5 1.53 161
Carlton 2.14 1.33 3.43 1.32 0.78 1.14 6.34 1.3 82.6
Lees - - 4.16 1.18 7.08 1.12 11.2 1.14 128
Ah Hoy - - 1.71 1.2 2.93 1.38 4.64 1.31 60.8
Booths - - 1.84 0.99 1.4 1.06 3.24 1.02 33
Penfolds - - 0.65 1.25 0.71 1.24 1.36 1.24 16.9
Hang Gong - - 1.51 1.18 1.95 1.14 3.46 1.16 40.1
Sandras - - 1.17 0.92 0.57 0.82 1.73 0.89 15.4
Bilatos - - - - 1.92 1.03 1.92 1.03 19.8
Seadog - - - - 1.41 1.18 1.41 1.18 16.6
Total 6.33 1.41 21.6 1.30 20.3 1.18 48.2 1.26 608
TSF/Rejects - - 0.31 0.66 - - 0.31 0.66 2.0
Total 6.33 1.41 21.9 1.29 20.3 1.18 48.5 1.26 610
1. Totals within this table are subject to rounding.
2. There was no cut-off applied to the TSF/Rejects material.
2 Refer to ASX announcement “Restart Study Repositions Finniss Operations” on 14 May 2025.
corelithium.com.au
4
Figure 1 Location of the Finniss Operation, including key deposits and infrastructure
Ore Reserves
The overall Finniss Project Ore Reserve Estimate (ORE) has increased to 15.6Mt @ 1.27% Li2O 3.
During the quarter, updated Proved and Probable Ore Reserves were estimated for Grants. Measured Mineral
Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were converted to Probable
Ore Reserves with the application of modifying factors. No Probable Ore Reserves have been derived from
Measured Mineral Resources.
The criteria used for the classification of the MRE on which the Ore Reserve is based is as follows:
• Drilling data spacing, grade and geological continuity, and data integrity.
• The relative contributions of geological and data quality and confidence, as well as grade confidence and
continuity.
• Confidence in the Measured and Indicated Mineral Resource is sufficient to allow application of modifying
factors within a technical and economic study.
3 Refer to ASX announcement “Updated Grants Mine Plan and Ore Reserve” on 10 November 2025.
corelithium.com.au
5
The confidence level of the assumptions used is at a Pre-Feasibility level. The effective date of the Grants Ore
Reserve is 30 October 2025. There has been no other change to the Ore Reserve from 5 September 2025.
Table 2 Finniss Ore Reserve Estimate, including contained metal
Deposit Category Ore Tonnes (Mt) Li2O (%) Contained Li2O kt
BP33 Underground
Proved 2.6 1.27 32
Probable 6.7 1.32 89
Total 9.3 1.31 121
Grants Open Pit and
Underground
Proved 1.18 1.43 17
Probable 0.35 1.41 5
Total 1.53 1.42 22
Carlton Underground
Proved 1.7 1.19 20
Probable 2.8 1.19 34
Total 4.5 1.19 53
TSF/Stockpiles
Probable 0.3 0.68 2
Total 0.3 0.68 2
Total
Proved 5.4 1.28 69
Probable 10.2 1.27 129
Total 15.6 1.27 198
1. Effective date of the Grants Ore Reserves is 30 October 2025
2. Effective date of the Carlton Ore Reserves is 5 September 2025 (“Updated Ore Reserve at Carlton” released on 10 September 2025).
3. Effective date of the BP33 and TSF/Stockpiles Ore Reserves is 30 April 2025. (“Updated Finniss Lithium Project Reserve and Resource”
released on 14 May 2025)
4. Ore Reserves are the total for the Grants, BP33, TSF/Stockpiles and Carlton Mines.
5. The long-term SC6 Spodumene price used for calculating the financial analysis is US$1,330/t. The financial analysis has been estimated
with assumptions for crushing, processing and treatment charges, deductions and payment terms, concentrate transport, metallurgical
recoveries, and royalties.
6. The breakeven cut-off net Smelter Return (NSR) for underground mining at BP33 and Grants Underground is $110/t NSR and $125/t
NSR for Carlton Underground.
7. Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated Mineral Resources were used to estimate
Probable Ore Reserves.
8. Tonnage and grade estimates include dilution and recovery allowances.
9. The tonnage and grade for TSF/Stockpile are estimated from the operations reconciled monthly production records.
10. The Reserves are defined at the point where the ore is delivered to the processing plant.
11. The Ore Reserves reported above are not additive to the Mineral Resources.
12. Totals within this table are subject to rounding.
Exploration
Lithium exploration
At Blackbeard, planning for a diamond drilling program in FY26 remains ongoing. This program is designed to
test the geology and lithium mineralisation associated with the Exploration Target at depth.
corelithium.com.au
6
Gold exploration
The Mt Shoobridge prospect, part of Core’s wholly owned Shoobridge Gold Project, is strategically located
approximately 10km from the Stuart Highway and 60km from the Union Reefs gold processing plant, within the
Pine Creek Orogen – a region that hosts multiple multi-million-ounce gold deposits. With gold prices trading
around record highs, Shoobridge presents a strategic opportunity alongside Core’s primary focus on lithium.
Surface geochemical sampling was conducted during the quarter at Mt Shoobridge to assess regional targets. A
total of 345 soil samples were collected during the quarter as part of regional gold target testing. Samples were
submitted to Intertek Genalysis for analysis.
Corporate
Project and strategic funding update
During the quarter, key technical workstreams including geotechnical, water management, mine design and
operational sequencing advanced towards conclusion and remain on schedule to support a Final Investment
Decision. This work further de-risks the restart plan and is aligned with the scope set out in the Restart Study.
The strategic funding process is advancing as planned, with continued interest from high-quality counterparties.
The recent improvement in lithium market conditions has provided increased flexibility and optionality in the
process.
Sale of non-core uranium assets
In December 2025, Core entered into an unconditional Share Sale Agreement with Elevate Uranium Ltd
(ASX:EL8) (Elevate) for the sale of its 100% interests in the Napperby, Fitton and Entia Uranium Projects
(collectively the Uranium Assets) which comprise four mineral exploration tenements in the Northern Territory
(EL31449, EL29347, EL29389 and EL30793) and two mineral exploration tenements in South Australia (EL6445
and EL6574).
In consideration for the sale of the Uranium Assets, Core received:
• cash consideration of $2.5 million;
• 8,923,738 million fully paid ordinary shares in Elevate, valued at $2.5 million based on the 15-day volume
weighted average price of Elevate shares prior to the date of the Agreement with 4,461,869 Elevate
shares subject to a six-month voluntary escrow period; and
• a Net Smelter Royalty of 1.0% on any metals or minerals produced from EL31449, which hosts Napperby
Project area.
Small share sale facility
During the quarter, Core completed a small shareholding share sale facility (Facility) for shareholders whose
holding of fully paid ordinary shares (Shares) were valued at less than $500.
The number of Shares sold under the Facility was 35,100,871 Shares (representing approximately 1.3% of the
issued capital) held by 21,817 shareholders were sold at the sale price of $0.2375 per Share.
The Company received 4,364 Share retention forms from shareholders, holding 8,051,451 Shares in aggregate,
who chose to retain their Shares despite being eligible for the Facility. A further 2,755,832 Shares were topped up
above the eligible parcel size, sold or merged by 1,098 shareholders.
corelithium.com.au
7
Change of registered office
On 23 October 2025, Core advised that the Company’s registered office and principal administrative office was
changed to Level 4, 186 St Georges Terrace Perth, WA 6000.
Settlement agreement and mutual release
Core refers to its previous announcements4 and to disclosures in the 2025 Annual Report regarding ongoing
discussions concerning a potential offtake agreement with Tesla, Inc.
Consistent with the stated strategy to support a future restart of the Finniss Lithium Operation, the Company has
agreed with Tesla to formally discontinue offtake discussions through the execution of a comprehensive, legally
binding settlement agreement. The precise terms of the settlement are confidential; however, as part of the
agreement, both parties have agreed to fully and finally release each other from all potential claims related to the
previously disclosed dispute.
The settlement resolves all offtake contracts and related obligations, leaving all future production from Finniss
unencumbered.
NT Royalty agreement
During the quarter, Core entered into an instalment agreement with the NT government for the payment of its
Mineral Royalty liability.
As previously disclosed, the Northern Territory Revenue Office (TRO) issued Core with a Notice of Assessment
for additional royalties payable for FY23 of approximately $6.4m5. Through proactive engagement, Core worked
with the Northern Territory Government to correct an over-estimation in historical royalty assessments, resulting
in a $1.0 million adjustment and a $0.9 million amount due to Core, with an outstanding balance (excluding
interest) of approximately $3.8 million.
Under this agreement, Core has agreed to make three payments of $1 million on a semi-annual basis starting in
December 2025, with a fourth and final payment of the remaining balance due on 31 March 2027. Core paid the
first instalment in mid-December 2025.
Other disclosures
As at 31 December 2025, Core had the following capital structure:
• 2,660,515,950 ordinary shares
• 36,579,631 unquoted performance rights
• 8,500,000 unquoted options
Core’s Appendix 5B includes an amount of $94k in item 6.1. The amount in item 6.1 represents director fees paid
to entities nominated by the Company’s directors.
Core confirms that it is not aware of any new information or data that materially affects the exploration results,
exploration targets, MRE and ORE included in this announcement as cross referenced in the body of this
announcement, and that all technical parameters and material assumptions underpinning the MRE, ORE and
production target and forecast financial information derived from the production target continue to apply and have
not materially changed except as reported within this release. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the original
announcements related to previously reported exploration results, exploration targets, MRE and ORE. The
Company has previously released the MRE on 14 May 2025 as “Updated Finniss Lithium Project Reserve” and
Resource” and ORE on 10 September 2025 as “Updated Ore Reserve at Carlton”.
4 Refer to ASX announcement “Core Lithium and Tesla enter into binding Term Sheet for the supply of lithium” on 2 March 2022 and ASX announcement “Core
and Tesla extend Offtake Term Sheet” on 29 August 2022.
5 Refer to ASX announcement “Quarterly Activities and Cashflow Report” on 17 July 2024.
corelithium.com.au
8
Tenements
Tenement number Tenement name Interest at the end
of Quarter
Changes during
the Quarter
South Australia
EL 6574 Fitton 0% Disposed1
EL 6038 Mt Freeling 100% None
EL 6111 Yerelina 100% None
EL 6445 Wyatt Bore 0% Disposed1
Northern Territory
EL 26848 Walanbanba 100% None
EL 28029 White Range East 100% None
EL 28136 Blueys 100% None
EL 29347 Yambla 0% Disposed1
EL 29389 Mt George 0% Disposed1
EL 29580 Jervois East 100% None
EL 29581 Jervois West 100% None
EL 29698 Finniss 100% None
EL 29699 Bynoe 100% None
EL 30012 Bynoe 100% None
EL 30015 Bynoe 100% None
EL 30793 McLeish 0% Disposed1
EL 31058 Barrow Creek 100% None
EL 31126 Zola 100% None
EL 31127 Ringwood 100% None
EL 31139 Anningie West 100% None
EL 31140 Anningie South 100% None
EL 31145 Barrow Creek North 100% None
EL 31146 Barrow Creek South 100% None
EL 31271 Bynoe 100% None
EL 31279 Sand Palms 100% None
EL 31407 Shoobridge 100% None
EL 31449 Napperby 0% Disposed1
EL 31886 Adelaide River 100% None
EL 32205 Finniss Range 100% None
EL 32392 Ivy 100% None
EL 32396 Murray Creek 100% None
EL 33932 Bloodwood 100% None
EL 33933 West Dam 100% None
EL 34075 Douglas 100% Granted2
.
corelithium.com.au
9
Tenements(cont.)
Tenement number Tenement name Interest at the end
of Quarter
Changes during
The Quarter
Northern Territory
EMP 28651 Observation Hill (Extractive Lease) 100% None
ML 29912 Saffums 100% None
ML 29914 Labelle 100% None
ML 29985 Angers North 100% None
ML 31654 Annie/Old Crusher 100% None
ML 31726 Grants Mineral Lease 100% None
ML 32074 Observation Hill (Ancillary Lease) 100% None
ML 32278 Grants Dam (Ancillary Lease) 100% None
ML 32346 BP33 Mineral Lease 100% None
MLN16 Bynoe 100% None
MLN813 Bilatos 100% None
MLN1148 Centurian 100% None
1. Disposal of these tenements relates to the Elevate Uranium transaction. Refer to ASX announcement “Sale of non-core
Uranium Assets” on 23 December 2025.
2. EL34075 Douglas was granted on 21 November 2025.
This announcement has been approved for release by the Core Lithium Board:
For further information, please contact:
Investor Enquiries
Paul Brown
CEO
Core Lithium Ltd
+61 8 8317 1700
info@corelithium.com.au
Media enquiries
Michael Vaughan
Executive Director
Fivemark Partners
+61 422 602 720
michael.vaughan@fivemark.com.au
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au
Important Information
This announcement may reference forecasts, estimates, assumptions, and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
corelithium.com.au
10
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Core Lithium Ltd
ABN
Quarter ended (“current quarter”)
80 146 287 809 31 December 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
exploration & evaluation
development
production
staff costs (1,968) (4,925)
administration and corporate costs (2,452) (3,407)
care and maintenance (618) (1,860)
technical study costs (1,680) (2,250)
royalties (1,000) (1,000)
1.3 Dividends received (see note 3)
1.4 Interest received 447 651
1.5 Interest and other costs of finance paid (9) (663)
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other – crushing contract payment - (3,230)
1.9 Other – offtake agreement payment (692) (3,737)
1.10 Net cash from / (used in) operating
activities
(7,972) (20,421)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
entities
tenements
property, plant and equipment - (6,271)
exploration & evaluation (439) (982)
investments (76) (76)
other non-current assets - mine
development
2.2 Proceeds from the disposal of:
entities
tenements 2,500 2,500
property, plant and equipment
investments
other non-current assets
2.3 Cash flows from loans to other entities
corelithium.com.au
11
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
2.4 Dividends received (see note 3)
2.5 Other (Net proceeds / (payments) for
Security bond)
(270) (270)
2.5a Other (Government grant co-funding (paid))
2.5b Other (Government grant co-funding
received)
2.6 Net cash from / (used in) investing
activities
1,715 (5,099)
3. Cash flows from financing activities
20,803 54,331
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(1,671) (3,364)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (Payments of lease liabilities) (142) (278)
3.10 Net cash from / (used in) financing
activities
18,990 50,689
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
35,923 23,486
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(7,972) (20,421)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
1,715 (5,099)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
18,990 50,689
4.5 Effect of movement in exchange rates on
cash held
- 1
4.6 Cash and cash equivalents at end of
period
48,656 48,656
corelithium.com.au
12
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 48,656 35,923
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
48,656 35,923
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
94
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a
description of, and an explanation for, such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the
entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing facilities
have been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
N/A
corelithium.com.au
13
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.10) (7,972)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(439)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (8,411)
8.4 Cash and cash equivalents at quarter end (item 4.6) 48,656
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 48,656
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.8
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3,
answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available
must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above
must be answered.
corelithium.com.au
14
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which comply with
Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 22 January 2026
Authorised by: By the Board
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market
about the entity’s activities for the past quarter, how they have been financed and the effect this has had
on its cash position. An entity that wishes to disclose additional information over and above the minimum
required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and
AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared
in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the
corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from
investing activities, depending on the accounting policy of the entity.
4. I