New High-Grade Lithium Drill Results at BP33
Released
Released
Announcement PDF
Level 4, 186 St Georges Terrace T 61 8 8317 1700 ABN 80 146 287 809
Perth WA 6000 E info@corelithium.com.au ASX CXO
corelithium.com.au
11 August 2026
ASX: CXO Announcement
New High-Grade Lithium Drill Results at
BP33
Highlights
• Excellent new high grade lithium results from extensional drilling at the BP33 project,
including:
o 34.08m @ 2.09% Li2O from 578.70m in NMRD100 (28.50m True Width) including;
▪ 5.28m @ 2.80% Li2O from 578.70m
▪ 5.40m @ 2.37% Li2O from 585.65m
▪ 7.11m @ 2.19% Li2O from 593.94m
▪ 9.83m @ 2.23% Li2O from 601.88m
o 3.43m @ 2.44% Li2O from 616.50m in NMRD100 (~2.00m True Width)
• NMRD100 was designed to target potential extensions to mineralisation outside the
existing BP33 Mineral Resource Estimate (10.5Mt @ 1.53% Li2O)1 (MRE) and successfully
intersected high-grade spodumene mineralisation adjacent to NMRD085 which previously
intersected 90.17m @ 1.80% Li2O from 568.83m2.
• Drilling at BP33 is ongoing, with an additional four holes planned targeting extensions to
mineralisation down dip and along strike from NMRD085 and NMRD100.
Core Lithium Ltd (ASX:CXO) (Core or Company) is pleased to provide an update on the exploration drilling
program at the BP33 project, part of the Company’s 100% owned Finniss Lithium Operation (Finniss). Assay
results from the first exploration diamond drill hole at BP33 (NMRD100) have been received, with a wide high-
grade zone of mineralised pegmatite intersected, including 34.08m @ 2.09% Li2O from 578.7m and 3.43m @
2.44% Li2O from 616.54m. NMRD100 was designed to target potential extensions to mineralisation outside the
existing BP33 MRE (10.5Mt @ 1.53% Li2O) identified in NMRD085, which intersected 90.17m @ 1.80% Li2O from
568.83m.2
1 Refer to ASX announcement “Mineral Resource at BP33 increased to 89% Measured and Indicated” on 16 October 2023
2 Refer to ASX announcement “2023 Exploration Program Update” on 25 January 2024
corelithium.com.au
2
Commenting on the BP33 drilling results, Core Managing Director Paul Brown said:
“These initial results from BP33 are highly encouraging and reinforce our confidence in the quality and continuity
of the orebody. BP33 is a unique deposit, characterised by a large, continuous, uniform, sub-vertical pegmatite
with consistent grade, minimal internal zoning and favourable geometry for underground mining. As the long-life,
low-cost production base at Finniss, these results further strengthen our confidence in the continuity and scale of
the orebody, while continuing to demonstrate the potential for mineralisation beyond the current Mineral Resource
footprint.
“With additional drilling underway, we look forward to further improving our understanding of the deposit and its
long-term development potential.
“Exploration drilling at Blackbeard is also underway, with up to 12,150 metres planned. An additional diamond
drilling rig is on the way and will accelerate the program. Results from the Blackbeard campaign are expected
over the coming months, with the potential to provide a future ore feed to Finniss.”
BP33
Core recovered from NMRD100 exhibits coarse-grained spodumene mineralisation across the reported
intersection that is characteristic of the BP33 orebody. Individual sample intervals and corresponding Li2O grades
are annotated on the photograph below (Figure 1). The photographed interval is contained within the 5.28m @
2.8% Li2O from 578.78m result reported above.
Figure 1: NMRD100 - Mineralised Intersection - 579.15m-582.88m - Li2O% Grade
corelithium.com.au
3
Figure 2: Geological Cross Section – NMRD085 and NMRD100 at BP33
BP33 hosts an existing Mineral Resource Estimate of 10.5Mt @ 1.53% Li2O, as well as a previously reported
Exploration Target of between 3.9Mt and 6.5Mt at a grade of between 1.5% and 1.6% Li2O3, located down-plunge
of the current MRE. Together, these highlight the scale of the mineralised system at BP33 and the potential for
continued growth beyond the current Resource base.
The Exploration Target is supported by historical drilling, trenching and exploration results. The potential quantity
and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a
Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
3 Refer to ASX announcement "Updated Finniss Lithium Project Ore Reserve and Mineral Resource Estimate" on 14 May 2025
corelithium.com.au
4
The current exploration drilling program at BP33 is targeting extensions to mineralisation identified in hole
NMRD085, which intersected 90.17m @ 1.80% Li2O from 568.83m outside the existing MRE. The first hole of this
program, NMRD100, has returned 34.08m @ 2.09% Li2O from 578.7m and 3.43m @ 2.44% Li2O from 616.54m,
confirming the continuity of high-grades intersected in NMRD085. NMRD100 did not test the previously reported
Exploration Target. An additional four holes are planned, designed to further test extensions to mineralisation
down-dip and along strike from NMRD085 and NMRD100.
Given the depth of the Exploration Target - extending to approximately 1,200m below surface - it is expected that
any future drill testing of this target would be undertaken from underground, once mining operations have
progressed to the relevant depth.
Figure 3: BP33 Resource and Exploration Target outline
corelithium.com.au
5
Figure 4: Overview of Finniss Lithium Operation showing BP33 location
This announcement has been approved for release by the Core Lithium Board
For further information, please contact:
Investor Enquiries
Paul Brown
Managing Director
Core Lithium Ltd
+61 8 8317 1700
info@corelithium.com.au
Media enquiries
Cameron Morse
Senior Managing Director
FTI Consulting
+61 433 886 871
cameron.morse@fticonsulting.com
corelithium.com.au
6
About Core
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards.
For further information about Core and its projects, visit www.corelithium.com.au.
Competent Person's Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Paul
Smith (BSc (Geoscience)), who is a full-time employee of Core Lithium Ltd and a member of the Australian
Institute of Geoscientists and is bound by and follows the Institute's codes and recommended practices. He has
sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration
and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Smith
consents to the inclusion in the report of the matters based on this information in the form and context in which it
appears.
The BP33 Mineral Resource Estimate was reported in Core Lithium's ASX announcement titled “Mineral Resource
at BP33 increased to 89% Measured and Indicated” dated 16 October 2023. The BP33 MRE of 10.5Mt @ 1.53%
Li2O is comprised of 2.85Mt @ 1.44% Li2O Measured MRE, 6.51Mt @ 1.55% Li2O Indicated MRE and 1.14Mt @
1.59% Li2O Inferred MRE. Core Lithium confirms that it is not aware of any new information or data that materially
affects the exploration results, exploration targets and Mineral Resource Estimate reported in those
announcements and confirms that all material assumptions and technical parameters underpinning the estimate
continue to apply and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original announcements.
Table 1: Summary of drill hole data and received assay results from exploration activities at BP33
(Diamond drilling)
Hole ID Prospect
Drill
Type
Easting
(m)
Northing
(m)
Dip Azimuth
Total
Depth
(m)
From (m) To (m)
Interval
(m)
Grade
(Li2O%)
NMRD100 BP33 DD 694691 8593274 -68 280 629.2 575.85 577.06 1.21 1.04
578.70 612.78 34.08 2.09
Incl 578.70 583.98 5.28 2.80
Incl 585.65 591.05 5.40 2.37
Incl 593.94 601.05 7.11 2.19
Incl 601.88 611.71 9.83 2.23
616.54 619.97 3.43 2.44
corelithium.com.au
7
Appendix 1 JORC Code, 2012 Edition-Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code Explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as downhole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken
to ensure sample presentively and
the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’
work has been done, this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
• Diamond core (DDH) drill techniques have
been employed for the Core Lithium Ltd
("Core" or "CXO") drilling. A list of the hole IDs
and positions for drilling discussed in the
release has been included.
• Drill core was collected directly into trays,
marked up by metre marks and secured as
the drilling progressed.
• DDH Core was transported to a local core
preparation facility where geological logging
and sample interval selection took place. If
sampled, core was cut into half longitudinally
along a consistent line between 0.3m and 1m
in length, ensuring no bias in the cutting
plane.
• DDH sampling of pegmatite for assaying is
done over the sub-1m intervals described
above. 1m-sampling continued into the
barren phyllite host rock.
Drilling
techniques
• Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc.).
• HQ DDH drilling was utilised. Core was
oriented using a HQ core orientation tool.
• All diamond holes utilised Mud Rotary pre-
collars to fresh rock (approx. 65m) with
diamond tails.
Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample
recovery and ensure the
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and grade
• Core recoveries were measured using
conventional procedures, utilising the driller's
markers and estimates of core loss.
• Core was reconstructed into continuous runs,
with recovered core marked up and measured
by the geologist or geo-technician, checking
against recorded depths on the core blocks.
• DDH core recovery is typically 100% in the
pegmatite zones and in fresh host-rock.
corelithium.com.au
8
Criteria JORC Code Explanation Commentary
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc.) photography.
• The total length and percentage of
the relevant intersections logged.
• Detailed geological logging was carried out
on all diamond drill holes.
• Logging recorded lithology, mineralogy,
mineralisation, weathering, colour, and other
sample features.
• DD core is stored in plastic core trays.
• All holes were logged in full.
• Pegmatite sections are also checked under a
single-beam UV light for spodumene
identification on an ad hoc basis. These only
provide indicative qualitative information.
• DDH core trays are photographed and stored
on the CXO server.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc. and
whether sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise presentively of samples.
• Measures taken to ensure that the
sampling is representative of the In
Situ material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are
appropriate to the grain size of the
material being sampled.
• Half Drill Core sample intervals were
constrained by geology, alteration or structural
boundaries, intervals varied between a
minimum of 0.3 metres to a maximum of 1 m.
The core is cut along a regular Ori line to
ensure no sampling bias.
• Due to the coarse-grained nature of the
spodumene mineralisation, no duplicates of
DD core were collected.
Quality of
assay data
and
laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc., the parameters
used in determining the analysis
include instrument make and model,
reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been
established.
• Sample preparation (crushing and pulverising)
occurs at Intertek's Darwin, NT laboratory. All
samples are crushed and pulverised.
• For lithium samples, a sub-sample of the pulp
is digested via a sodium peroxide fusion in a
Ni crucible and analysed at Intertek's Perth
laboratory via ICP-MS and ICP-OES methods
for the following elements: Li, Al, B, Ba, Be,
Ca, Cs, Fe, K, Mg, Mn, Nb, P, Rb, S, Sn, Sr,
Ta, W and As.
• Intertek utilise standard internal quality control
measures including the use of Certified
Lithium Standards and duplicates/repeats.
• CXO implemented quality control procedures
include appropriate certified Lithium ore
standards and blanks.
• There were no significant issues identified with
any of the QAQC data.
corelithium.com.au
9
Criteria JORC Code Explanation Commentary
Verification of
sampling and
assaying
• The verification of significant
intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification,
data storage (physical and
electronic) protocols.
• Discuss any adjustment to assay
data.
• Senior technical personnel have visually
inspected and verified the significant drill
intersections.
• All field data was initially entered into excel
spreadsheets (supported by lookup tables) at
site and imported into the centralised CXO
Access database.
• Hard copies of survey and sampling data are
stored in the local office and electronic data is
stored on the CXO server.
• Metallic Lithium percent was multiplied by a
conversion factor of 2.1527/10000 to report Li
ppm as Li2O%.
Location of
data points
• The accuracy and quality of surveys
used to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of topographic
control.
• Hand held GPS has been used to determine
the collar location. Core is in the process of
picking up all collars via DGPS. Collar position
audits are undertaken, and no issues have
arisen.
• The grid system is MGA_GDA94, zone 52 for
easting, northing and RL.
• All DD hole traces were surveyed by north
seeking gyro tool operated by the drillers.
• The local topographic surface is used to
generate the RL of collars when coordinates
are obtained via hand held GPS.
Data spacing
and
distribution
• Data spacing for reporting
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing has
been applied.
• The lithium mineralisation and geology at BP
33 show good continuity from hole to hole.
• The drill hole reporting is drilled at a sufficient
spacing to be included in future updates to
Mineral Resource and the classifications
contained in the JORC Code (2012 Edition).
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered
to have introduced a sampling bias,
this should be assessed and
reported if material.
• Drilling is oriented approximately perpendicular
to the interpreted strike of mineralisation
(pegmatite body) as mapped. Because of the
dip of the hole, drill intersections are apparent
thicknesses, and overall geological context is
needed to estimate true thicknesses.
• Estimates of true thickness are generally
between 50-90% of the drilled thickness and
depends on the prospect drilled.
• No sampling bias is believed to have been
introduced.
Sample
security
• The measures are taken to ensure
sample security.
• Sample security was managed by the CXO.
After preparation in the field or CXO’s
warehouse, samples were packed into
polyweave bags and transported by the
Company directly to the assay laboratory. The
assay laboratory audits the samples on arrival
and reports any discrepancies back to the
Company.
corelithium.com.au
10
Criteria JORC Code Explanation Commentary
Audits or
reviews
• The results of any audits or reviews
of sampling techniques and data.
• Ongoing QAQC and validation of the data has
been excellent, and no specific audits or
reviews are considered necessary.
Section 2 Reporting of Exploration Results
Criteria JORC Code Explanation Commentary
Mineral
Tenement and
Land Tenure
Status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at
the time of reporting along with any
known impediments to obtaining a
license to operate in the area.
• BP33 is located on ML32346, 100% owned by
CXO.
• The project area comprises predominantly
Vacant Crown land and to a lesser extent
Crown Leases (perpetual and term).
• The tenements are in good standing with the
NT DPIR Titles Division.
Exploration
Done by Other
Parties
• Acknowledgment and appraisal of
exploration by other parties.
• The history of mining in the Bynoe area dates
to 1886 when tin was discovered by Mr. C
Clark.
• By 1890 the Leviathan Mine and the Annie
Mine were discovered and worked
discontinuously until 1902.
• In 1903 the Hang Gong Wheel of Fortune was
identified.
• By 1909, activity was limited to Leviathan and
Bells Mona mines in the area with little activity
from 1907 to 1909.
• In the early 1980s, the Bynoe Pegmatite field
was reactivated during high tantalum prices
by Greenbushes Tin, which owned and
operated the Greenbushes Tin and Tantalite
(and later spodumene) Mine in WA.
Greenbushes Tin Ltd entered a JV with
Barbara Mining Corporation.
• Greenex (the exploration arm of
Greenbushes Tin Ltd) explored the Bynoe
Pegmatite field between 1980 and 1990 and
produced tin and tantalite from its Observation
Hill Treatment Plant between 1986 and 1988.
• They then tributed the project to a company
named Fieldcorp Pty Ltd who operated it
between 1991 and 1995.
• In 1996, Julia Corp drilled RC holes into
representative pegmatites in the field, but like
all their predecessors, did not assay for Li.
• Since 1996, the field remained dormant until
recently when exploration began on
ascertaining the lithium prospectivity of the
Bynoe pegmatites.
• The NT geological Survey undertook a
regional appraisal of the field, published in
corelithium.com.au
11
Criteria JORC Code Explanation Commentary
2004 (NTGS Report 16, Frater 2004).
• LTR drilled the first RC holes testing for lithium
potential at BP33, Hang Gong and Booths in
2016.
• CXO subsequently drilled BP33, Grants, Far
West, Central, Ah Hoy and several other
prospects in 2016.
• After purchasing the LTR tenements in 2017,
CXO drilled Lees, Booths, Carlton and Hang
Gong.
• Early in 2021, Core purchased a group of
small ML's from Outback Metals Pty Ltd within
the Finniss Project area. Since that time some
exploration activities have been undertaken
on them.
• Late in 2021, Core commenced development
of Grants Mineral Resource with first ore
mined and crushed late in 2022.
• In 2026, CXO commenced underground
development of the BP33 Mineral Resource.
Geology • Deposit type, geological setting and
style of mineralisation.
• The project area covers a swarm of complex
zoned rare element pegmatites, which
comprise the 70km long by 15km wide Bynoe
Pegmatite Field (NTGS Report 16).
• The Finniss pegmatites have intruded early
Proterozoic shales, siltstones and schists of
the Burrell Creek Formation which lies on the
northwest margin of the Pine Creek
Geosyncline. To the south and west are the
granitoid plutons and pegmatitic granite
stocks of the Litchfield Complex. The source
of the fluids that have formed the intruding
pegmatites is generally accepted as being the
Two Sisters Granite to the west of the belt,
and which probably underlies the entire area
at depths of 5-10 km.
• Fresh pegmatite at most deposits is
dominated by coarse-grained spodumene,
quartz, albite, microcline and muscovite.
Spodumene, a lithium bearing pyroxene
(LiAl(SiO3)2), is the predominant lithium
bearing phase and displays a diagnostic red-
pink UV fluorescence.
• Mineralisation is typically hosted within large,
massive, sub vertical pegmatite bodies (e.g.
Grants, BP33). It can also be present within
shallow to moderately dipping stacked
pegmatite bodies or sheets (e.g. Hang Gong).
Drill Hole
Information
• A summary of all information
material to the understanding of the
exploration results including a
tabulation of the following
information for all Material drill
holes:
• Easting and northing of the drill
hole collar
• A summary of material information for all drill
holes discussed in this release is contained
within the body of the report. This includes all
collar locations, hole depths, dip and azimuth
as well as current assay or intercept
information.
• Only drill holes with assays returned are
discussed and presented here.
corelithium.com.au
12
Criteria JORC Code Explanation Commentary
• elevation or RL (Reduced Level
– elevation above sea level in
meters) of the drill hole collar
• dip and azimuth of the hole
• down hole length and
interception depth
• hole length.
• If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• Further drilling on going within the region. This
drilling will be disclosed wen completed and
when assays have been returned.
Data
Aggregation
Methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
• Where aggregate intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
• The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
• Any sample compositing reported here is
calculated via length weighted averages of
the assayed intervals. Length weighted
averages are acceptable method because the
density of the rock (pegmatite) is constant.
• 0.3% Li2O was used as lower cut off grades
for compositing and reporting intersections
with allowance for including up to 3m of
consecutive drill material of below cut-off
grade (internal dilution).
• No metal equivalent values have been used
or reported.
Relationship
Between
Mineralisation
Widths and
Intercept
Lengths
• These relationships are particularly
important in the reporting of
Exploration Results.
• If the geometry of mineralisation
with respect to the drill hole angle is
known, its nature should be
reported.
• If it is not known and only the down
hole lengths are reported, there
should be a clear statement of this
effect (e.g. down hole length, true
width not known’).
• Historically, all holes have been drilled at
angles between 55 - 85° and approximately
perpendicular to the strike of the pegmatite.
• Some holes deviated in azimuth and therefore
are marginally oblique in a strike sense.
• Based on an assessment of drill sections, true
width typically represents about 50-90% of the
intercept width.
Diagrams • Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported. These should include but
not be limited to a plan view of drill
hole collar locations and
appropriate sectional views.
• Refer to any Figures and Tables in the
release.
Balanced
Reporting
• Where comprehensive reporting of
all Exploration Results is not
practicable, representative
reporting of both low and high
• Assay results for all DD drilling reported have
been included
corelithium.com.au
13
Criteria JORC Code Explanation Commentary
grades and/or widths should be
practiced avoiding misleading
reporting of Exploration Results.
Other
Substantive
Exploration
Data
• Other exploration data, if
meaningful and material, should be
reported including (but not limited
to): geological observations;
geophysical survey results;
geochemical survey results; bulk
samples – size and method of
treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
• All meaningful and material data has been
reported.
Further Work • The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
• Drilling at BP33 is ongoing with additional
holes designed to text for extensions to
mineralisation currently outside the existing
mineral resource.
• Exploration drilling is also ongoing at the
Blackbeard prospect.
Share your feedback
Discover