Equity Raising Presentation
Released
Released
Announcement PDF
ASX:CXO
EQUITY RAISING
PRESENTATION
28 August 2025
Not for release to US wire services or distribution in the United States
IMPORTANT AND CAUTIONARY NOTES
This presentation is dated 28 August 2025 and has been prepared by Core Lithium Ltd (Core or the
Company) in connection with an equity raising by Core comprising a non-underwritten placement of shares
in Core (New Shares) to institutional and sophisticated investors (Placement) in conjunction with a nonunderwritten share purchase plan (SPP) of New Shares (collectively, the Capital Raising).
This presentation does not constitute an offer to sell, or a solicitation of an offer to buy any securities in any
jurisdiction. The distribution of this presentation and the offer of securities is restricted in jurisdictions outside
Australia. See the section of this presentation captioned “International Offer Jurisdictions” for more
information. Any failure to comply with such restrictions could constitute a violation of applicable securities
laws.
Unless otherwise defined in these Important and Cautionary Notes, capitalised terms have the meanings
given to them elsewhere in this presentation.
Acceptance
By attending an investor presentation and/or by briefing, or accepting, accessing or reviewing this
presentation, you accept the terms, conditions and disclaimers herein.
This presentation is provided expressly on the basis that you will carry out your own independent inquiries
into the matters contained in the presentation and make your own independent decisions about the affairs,
financial position or prospects of the Company (having regard to the requirements of all relevant
jurisdictions).
An offer booklet in respect of the SPP will be made available to eligible shareholders in Australia and New
Zealand following its lodgement with ASX (SPP Booklet). Any eligible shareholder in Australia or New Zealand
who wishes to participate in the SPP should consider the SPP Booklet before deciding whether to apply for
New Shares under the SPP. Anyone who wishes to apply for New Shares under the SPP will need to apply in
accordance with the instructions contained in the SPP Booklet and the application form.
Disclaimer
This presentation provides a general overview of the Company and its strategy for information purposes and
is a summary only. This presentation does not purport to be all-inclusive or to contain all the information that
a prospective investor may require in connection with any potential investment in the Company or to evaluate
the prospects of the Company. None of the Company, any of its related bodies corporate or any of their
representatives assume any responsibility for, or makes any representation or warranty, express or implied,
with respect to the accuracy, reliability or completeness of the information contained in this presentation and
none of those parties have or assume any obligation to provide any additional information or to update this
presentation. The information in this presentation should be read in conjunction with Core’s other periodic
and continuous disclosure announcements lodged with the Australian Securities Exchange (ASX), which are
available at www.asx.com.au under the Company’s ticker code (ASX:CXO). Each recipient must make its own
independent assessment of the Company and should seek professional advice before acquiring any shares in
the Company.
The contents of this presentation is provided as at the date of this presentation (unless otherwise stated) and
the Company reserves the right to update, amend or supplement the information at any time in its absolute
discretion (without incurring any obligation to do so). No party other than the Company has authorised or
caused the issue, lodgement, submission, despatch or provision of this presentation, or takes any
responsibility for, or makes or purports to make any statements, representations or undertakings in this
presentation.
Except for any liability that cannot be excluded by law, and to the fullest extent permitted by law, the
Company, its respective affiliates and representatives, related bodies corporate, officers, employees, partners,
agents and advisers (each a Core Party) make no representation or warranty (express or implied) as to the
currency, accuracy, reliability, reasonableness or completeness of the information, opinions or conclusions in
this presentation and expressly disclaims all responsibility and liability for any loss or damage arising in
respect of your reliance on the information contained in this presentation (including your reliance on the
accuracy, completeness or reliability of that information), or any errors in or omissions from this presentation,
including any liability arising from negligence. No Core Party has or assumes any obligation to provide any
additional information or to update this presentation.
The Finniss Lithium Project is described in this presentation as being in a particular state of operational
readiness, based on a number of assumptions as detailed in the Restart Study (Study) released by the
Company on 14 May 2025 and potential investors should understand that mineral exploration, development
and mining are high-risk undertakings. There is no guarantee that the Finniss Lithium Project can be
economically exploited in the future and investors should have regard to the operational and development
risks set out in the ‘Key Risks’ section of this presentation.
Not a prospectus or disclosure document
Information in this presentation which is attributed to a third-party source has not been checked or verified
by the Company. This presentation is not a prospectus, disclosure document or other offer document under
the Corporations Act 2001 (Cth) (Corporations Act) or under any other law. This presentation will not be
lodged with the Australian Securities and Investments Commission (ASIC) or any other foreign regulator. It is
provided for information purposes and is not an invitation nor offer of shares or recommendation for
subscription, purchase or sale in any jurisdiction. Neither this presentation nor any of the information
contained herein will form the basis of any contract or commitment to sell, subscribe for or acquire securities
in the Company or any other financial product.
The Placement will be conducted under section 708A of the Corporations Act and will be made available to
certain persons who are “professional” or “sophisticated” investors as defined in subsections 708(8) and
708(11) of the Corporations Act.
Distribution outside Australia
Distribution or release of this presentation outside Australia may be restricted by law. This presentation may
not be distributed in any jurisdiction except in accordance with applicable legal requirements. Persons who
come into possession of this document should observe any such restrictions as any non-compliance could
contravene applicable securities laws. Please refer to the section of this presentation captioned “International
offer restrictions" for more information.
Not for release to US wire services or distribution in the United States
This presentation has been prepared for publication in Australia and may not be released to US wire services
or distributed in the United States. This presentation does not constitute an offer to sell, or a solicitation of an
offer to buy, securities in the United States or any other jurisdiction. Any securities described in this
presentation have not been, and will not be, registered under the US Securities Act of 1933 and may not be
offered or sold in the United States except in transactions exempt from, or not subject to, the registration
requirements of the US Securities Act and applicable US state securities laws.
2
IMPORTANT AND CAUTIONARY NOTES
Investment and other risks
legally and economically extract them.
There are a number of risks specific to the Company and of a general nature which may affect the future
operating and financial performance of the Company and the value of an investment in the Company,
including and not limited to the Company's capital requirements, the potential for shareholders to be diluted,
risks associated with the reporting of Mineral Resources and Ore Reserves estimates, budget risks,
development risk and operational risk. An investment in New Shares is subject to known and unknown risks,
some of which are beyond the control of the Company. The Company does not guarantee any particular rate
of return or the performance of the Company. Investors should have regard to the risk factors outlined in this
presentation under the section titled “Key Risks” when making their investment decision.
Competent Person Statements
Not investment or financial product advice
The information contained in this presentation is for information purposes only and does not constitute
investment advice or financial product advice (nor taxation, accounting or legal advice). Each recipient of this
presentation should make its own enquiries and investigations regarding all information in this presentation
including, but not limited to, the assumptions, uncertainties and contingencies which may affect future
operations of the Company and the impact that different future outcomes might have on the Company.
Information in this presentation is not intended to be relied upon as advice to investors or potential investors
for making an investment decision. The Company prepared this presentation without taking account of any
person’s individual investment objectives, financial situation or particular needs. Before making an investment
decision, prospective investors should consider the appropriateness of the information having regard to their
own investment objectives, financial situation and needs and seek legal, accounting and taxation advice
appropriate to their jurisdiction.
Each recipient of this presentation is solely responsible for forming their own opinions and conclusions on
such matters and the market and for making their own independent assessment of the information provided.
Any investment decision by a recipient must be made solely on the basis of their own enquiries. No reliance
may be placed for any purpose whatsoever on the information included in this presentation or on its accuracy
or completeness.
The Company is not licensed to provide investment or financial product advice in respect of its securities
(including New Shares). Cooling off rights do not apply to the acquisition of New Shares.
JORC Code
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in
Australia comply with the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral
Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while Ore Reserve and
Mineral Resource estimates of the Company in this presentation comply with the JORC Code (such JORC Codecompliant ore reserves and mineral resources being "Ore Reserves" and "Mineral Resources" respectively),
they may not comply with the relevant guidelines in other countries and, in particular, do not comply with (i)
National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities
Administrators (the "Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs
disclosures of mineral reserves in registration statements filed with the US Securities and Exchange
Commission. Information contained in this document describing mineral deposits may not be comparable to
similar information made public by companies subject to the reporting and disclosure requirements of
Canadian or US securities laws. You should not assume that quantities reported as “resources” will be
converted to reserves under the JORC Code or any other reporting regime or that the Company will be able to
This presentation includes estimates of Mineral Resources and Ore Reserves as well as production targets and
forecast financial information. Core has previously reported these estimates in ASX Announcements “Finniss
Mineral Resource Increased by 58%” on 11 April 2024, “Lithium Ore Reserve Updated” on 25 September 2024,
“Updated Finniss Lithium Project Ore Reserve and Mineral Resources” on 14 May 2025 and “Restart Study
Repositions Finniss Operations” on 14 May 2025.
Core confirms that it is not aware of any new information or data that materially affects the results and
exploration target included in the previous announcements (as may be cross referenced in the body of this
presentation) and that all material assumptions and technical parameters underpinning the Mineral
Resources, Ore Reserves, production target and forecast financial information derived from the production
target continue to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the original
announcements and that the information in the announcement relating to exploration results is based upon,
and fairly represents, the information and supporting documentation prepared by the named Competent
Persons.
Production Target
The Study (as defined above) includes a production target which contains approximately 12.9% of Inferred
Mineral Resources. An Inferred Mineral Resource has a lower level of confidence than an Ore Reserve or a
Measured and Indicated Mineral Resource, and there is no certainty that further exploration work will result
in the conversion of the Inferred mineralisation into an Ore Reserve or Measured or Indicated Mineral
Resource.
The Company confirms that it is not aware of any new information or data that materially affects the
production target information or the forecast financial information derived therefrom included in the Study.
The Company confirms that all material assumptions underpinning the production target or the forecast
financial information derived therefrom continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Study.
Currency
Unless otherwise stated, all cashflows are in Australian dollars, are undiscounted and are in real terms (not
subject to inflation/escalation factors).
Effect of rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this presentation
are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the
figures set out in this presentation.
3
IMPORTANT AND CAUTIONARY NOTES
Determination of eligibility
Investors acknowledge and agree that determination of eligibility of investors for the purposes of the Offer is
determined by reference to a number of matters, including the legal and regulatory requirements, logistical
and registry constraints and the discretion of one or more Core Parties. Each Core Party, its respective related
bodies corporate or any of their representatives disclaim any duty or liability (including without limitation, any
liability arising from fault or negligence on the part of any person) in respect of that determination and the
exercise or otherwise of that discretion, to the maximum extent permitted by law. Each Core Party may rely
on information provided by or on behalf of institutional investors in connection with managing and
conducting the Offer without independently verifying that information and each Core Party does not assume
responsibility for the currency, accuracy, reliability or completeness of that information.
Pro-forma financial information
Investors should be aware that this presentation contains pro-forma financial information and certain other
financial information and measures that are “non IFRS financial information” under Regulatory Guide 230:
‘Disclosing non IFRS financial information’ published by ASIC and are not recognised under Australian
Accounting Standards (AAS) and International Financial Reporting Standards (IFRS). The non IFRS financial
information financial measures do not have a standardised meaning prescribed by the applicable AAS or
IFRS, and therefore, may not be comparable to similarly titled measures presented by other entities, nor
should they be construed as an alternative to other financial measures determined in accordance with the
applicable AAS or IFRS. Although the Company believes the non-IFRS financial information and financial
measures provide useful information to users in measuring the financial performance and condition of the
Company, investors are cautioned not to place undue reliance on any non-IFRS financial information or
financial measures included in this presentation.
to be refined; future prices of lithium; possible variations of ore grade or recovery rates; failure of plant,
equipment or processes to operate as anticipated; accident, labour disputes and other risks of the mining
industry; and delays in obtaining governmental approvals or financing or in the completion of development or
construction activities. This list is not exhaustive of the factors that may affect forward-looking information.
These and other factors should be considered carefully, and readers should not place undue reliance on such
forward-looking information. The Company disclaims any intent or obligations to or revise any forwardlooking statements whether as a result of new information, estimates, or options, future events or results or
otherwise, unless required to do so by law. Statements regarding plans with respect to the Company’s mineral
properties may contain forward-looking statements in relation to future matters that can be only made where
the Company has a reasonable basis for making those statements.
Past Performance
Past performance information given in this presentation is given for illustrative purposes only and should not
be relied upon as (and is not) an indication of future performance.
Authorisation
This presentation has been authorised for release by the Board of Core Lithium Ltd.
This Presentation contains pro forma financial information reflecting the Capital Raising. The pro forma
financial information provided in this Presentation is for illustrative purposes only and is not represented as
being indicative of the Company's (or anyone else's) views on the Company's future financial position and/or
performance.
Forward‐looking Statements
This presentation contains forward-looking statements and comments about future matters. Generally, this
forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’,
‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’, ’should’,
’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions.
Persons reading this release are cautioned that such statements are only predictions, and that the Company’s
actual future results or performance may be materially different. Forward-looking information is subject to
known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level
of activity, performance or achievements to be materially different from those expressed or implied by such
forward-looking information. Forward-looking information is developed based on assumptions about such
risks, uncertainties and other factors set out herein, including but not limited to general business, economic,
competitive, political and social uncertainties; the actual results of current exploration, development and
construction activities; conclusions of economic evaluations; changes in project parameters as plans continue
4
OUR PURPOSE
Transformation of
Core into a
sustainable, lowcost supplier of
high-quality
spodumene
concentrate for
decades to come
5
FINNISS LITHIUM PROJECT OPPORTUNITY1
An established low cost, long life operational restart opportunity, located 88km from the Port of Darwin
Established DMS Plant
100% owned by Core
optimising and expanding
by 20% to 1.2Mtpa
with the majority of
offtake uncommitted
Average future annual
production
Low operating costs
205ktpa (SC6 eq.)
SC6 eq. excluding royalties
BP33 underground
Positive Restart Study
boxcut and decline
development to accelerate
supports project
advancement
Advance to FID
Strategic process
long-lead items and
operational readiness
strategic funding process
well underway
1.
A$690 – A$785/t FOB
Refer to ASX announcement "Finniss Repositioned as a Highly Attractive Low-Cost Operation with a 20-Year Life“ on 14 May 2025
6
COMPANY OVERVIEW
Experienced Management team in place
PAUL BROWN
ASX Code
CXO
Chief Executive Officer
Mining Engineer
Shares
2,143M
25+ years in the mining industry, with deep
expertise in Lithium. Demonstrated success in
operations, strategic growth, and capital markets
Share Price (26 August 2025)
A$0.120
Market Capitalisation
A$257M
Cash (30 June 2025)
A$23.5M
JAMES BRUCE
Chief Operating Officer
Mining Engineer and Finance
30+ years of global mining experience across
multiple commodities, with a strong
background in underground operations
JAMES VIRGO
Chief Financial Officer
Chartered Accountant
Nil
Debt
Finniss
Li
Shoobridge
Li Au
15+ years in mining finance, specialising in
capital markets, business development, and
investor relations
ANTHONY KIRKE
Project Director
Engineer
40+ years leading large-scale construction,
mining operations, and development projects
across diverse commodities
Lithium
Uranium
Base metals
NORTHERN
TERRITORY
WESTERN
AUSTRALIA
Perth
Head office
7
OVERVIEW OF EQUITY RAISING
Institutional Placement of A$50M and Share Purchase Plan of A$10M
• Core has received firm commitments to raise approximately A$50.0 million (before costs) in a two-tranche placement via
the issue of approximately 476.2 million fully paid ordinary shares (“New Shares”) at an issue price of A$0.105 per New
Share (“Offer Price”) in the Company (the “Placement”), comprising:
• an unconditional placement of approximately A$29.2 million through the issue of approximately 278.1 million New
Shares under the Company’s available placement capacity pursuant to ASX Listing Rules 7.1 (“Tranche 1”); and
Offer structure, size and ranking
• a conditional placement to raise approximately A$20.8 million through the issue of approximately 198.1 million
New Shares subject to and conditional upon the receipt of shareholder approval to be sought at a Shareholder
meeting, expected to be held in early-October (“Tranche 2”).
• In addition to the Placement, the Company intends to undertake a share purchase plan (“SPP”) to eligible shareholders in
Australia and New Zealand to raise up to A$10.0 million at the Offer Price.
• New Shares issued under the Placement and SPP will rank equally with existing shares on issue
• The Placement and SPP will not be underwritten
• The Offer Price of A$0.105 per share represents a 12.5% discount to the last traded price of A$0.120 per share on
Tuesday, 26 August 2025 and a 17.2% discount to the 5-day volume weighted average price of A$0.127 per share as at
Tuesday, 26 August 2025
Offer price
Use of proceeds
• Refer to Slide 9 for full details
Joint Lead Managers
• Argonaut Securities Pty Limited and Canaccord Genuity (Australia) Limited acted as joint lead managers and bookrunners
to the Placement.
• Eligible Core shareholders with a registered address in Australia or New Zealand as at the Record Date of Wednesday, 27
August 2025 will be invited to participate in a non-underwritten SPP
SPP details
• Up to A$30,000 per Eligible Shareholder to raise up to A$10.0 million at the Offer Price (with the ability to accept
oversubscriptions, subject to the ASX Listing Rules)
• Core reserves the right (in its absolute discretion) to scale back applications under the SPP or close the SPP early
1. The Placement and SPP timetable is indicative only and subject to variation. The Company reserves the right to alter the timetable at its discretion and without notice, subject to the ASX Listing Rules, the Corporations Act and
other applicable law. All times reference to Sydney, Australia time unless denoted otherwise.
8
SOURCE AND USE OF FUNDS
Providing the flexibility to enhance, de-risk and accelerate Finniss to FID
Cash balance and share capital
Cash
(A$M)
At 30 June 2025 (unaudited)
Shares on
issue (M)
Source of funds
Total (A$M)
Cash balance (22 August 2025)
9.4
23.5
Placement (before costs)
50.0
Settlement of crusher acquisition (July 2025)
(10.1)
SPP2 proceeds (before costs)
10.0
Other net expenditure
(4.0)
Total source of funds
69.4
At 22 August 2025 (unaudited)
9.4
2,143.0
Use of funds
Total (A$M)
Placement (before costs)
50.0
476.2
Long-lead items
5.8
Pro-forma (gross, incl. Placement)
59.4
2,619.2
BP33 box cut and decline development
25.0
Share purchase plan (SPP) (maximum)1
10.0
95.2
Operational readiness activities
9.2
Pro-forma (gross, incl. Placement and SPP)
69.4
2,714.4
General working capital and costs of Offer2
29.4
Total use of funds
69.4
•
De-risk and accelerate the advancement of Finniss to a positive Final Investment Decision (FID)
•
Strengthen balance sheet to enable further assessment of strategic funding options
•
Ordering of long-lead items and operational readiness activities which include additional technical services roles, approvals,
plus accelerated geotechnical, metallurgical and paste fill testwork to improve cost confidence and contingency estimates
•
Undertaking BP33 underground readiness via restart of box cut and decline development
1.
2.
SPP applications open on 4 September 2025 and close on 24 September 2025. Total proceeds will be determined at the conclusion of the SPP
Assumes full take-up of SPP of $10.0m. The SPP is not underwritten, and proceeds raised will be used for working capital.
9
INDICATIVE EQUITY RAISING TIMETABLE
Providing additional financial flexibility to accelerate and de-risk Finniss to FID
Placement
Date1
Trading halt lifted and announcement of completion of the Placement
Thursday, 28 August 2025
Settlement of New Shares under Tranche 1 of the Placement
Wednesday, 3 September 2025
Allotment, quotation and trading of New Shares under Tranche 1 of the Placement
Thursday, 4 September 2025
Shareholder meeting to approve Tranche 2 of the Placement
Early-October 2025
Settlement of New Shares under Tranche 2 of the Placement
Early-October 2025
Allotment, quotation and trading of New Shares under Tranche 2 of the Placement
Early-October 2025
Share Purchase Plan
Date1
Record date for eligibility to participate in the SPP
Wednesday, 27 August 2025
Dispatch SPP Offer Documents and SPP Offer open date
Thursday, 4 September 2025
SPP closing date
Wednesday, 24 September 2025
Announcement of SPP participation and results, followed by allotment of New Shares
1. The Placement and SPP timetable is indicative only and subject to variation. The Company reserves the right to alter the timetable
at its discretion and without notice, subject to the ASX Listing Rules, the Corporations Act and other applicable law. All times
reference to Sydney, Australia time unless denoted otherwise.
Monday, 29 September 2025
10
FINNISS LITHIUM PROJECT
Leveraging significant prior investment and a high-quality resource
• Located on Crown land with all major approvals in place
• Majority of tenure located within 50km of the process plant
• Modern DMS process plant with associated infrastructure in place
• Site is well maintained and remains restart ready
• Restart Study in May 2025 supports project advancement
100% ownership of all site
infrastructure and mining assets
Spodumene concentrate offtake
available supporting funding
optionality
Ore Reserve1: 10.7Mt at 1.29% Li2O (BP33, Grants and stockpiles)
Mineral Resource1: 48.5Mt at 1.26% Li2O (BP33, Grants and Carlton)
Exploration Target1: 10.9 – 16.5Mt at 1.5 - 1.7% Li2O (Blackbeard and BP33)
The Exploration Target is supported by historical drilling, trenching & exploration
results. The potential quantity & grade of the Exploration Target is conceptual in
nature. There has been insufficient exploration to estimate a Mineral Resource & it is
uncertain if further exploration will result in the estimation of a Mineral Resource.
1. Refer to ASX announcement “Updated Finniss Lithium Project Ore Reserve and Mineral
Resource Estimate“ on 14 May 2025
11
OUR ADVANTAGE
Enhanced metrics delivered through conventional and deliverable operational changes
Element
Key Outcomes
Metric
Mining Methodology
All underground
Production
1.2Mtpa
Concentrate production
205ktpa SC6 eq
Mine Life (years)
20
UG Mining Costs (A$/t)
63 – 72
Optimised mining costs exploiting large, continuous stopes
Processing Costs (A$/t)
40 – 46
Revised operating model with 100% infrastructure ownership
Unit Operating Costs (A$/t)
690 – 785
Highly competitive unit operating costs
Pre-Production Capex (A$M)
175 – 200
Improved capex profile across mining and processing
1.
Optimised mining across Grants, BP33 and Carlton
Optimised mine plan, simplifying flowsheet and increasing throughput
High-quality, coarse-grained concentrate
The Study underpinned by 17.3Mt of ore with upside
Refer to ASX announcement "Finniss Repositioned as a Highly Attractive Low-Cost Operation with a 20-Year Life“ on 14 May 2025
12
Underground mining at BP33 of one large, sub-vertical
mineralised pegmatite with 350m strike length and 40m true
width for at least 10 years deliver low mining costs of A$63 A$72/t of ore
BP33
Grants and Carlton deposits provide medium-term optionality
and flexibility in ore feed, supporting BP33 as the primary asset.
13
DRIVERS OF LOWER MINING COSTS
Bottom-up, all-in underground mining and stoping costs
BP33
Bulk stoping geometry — large, wide, continuous, high-grade stopes with
minimal internal dilution and vertical hanging wa
Share your feedback
Discover