Core Lithium Half-year Report
Released
Released
Announcement PDF
Interim Consolidated Financial Statements
for the half year ended 31 December 2023
1
Contents
Directors’ Report
3
Auditor’s Independence Declaration
7
Financial Report
8
Statement of Profit or Loss and Other Comprehensive Income
8
Statement of Financial Position
9
Statement of Changes in Equity
10
Statement of Cash Flows
11
Notes to the Consolidated Financial Statements
12
Directors’ Declaration
26
Independent Auditor’s Review Report
27
This Report covers Core Lithium Ltd ("Core", the "Parent" or the
"Company") and its subsidiaries, collectively referred to as "the
Group".
The financial report is presented in Australian dollars.
Its registered office and principal place of business is:
Core Lithium Ltd
Level 9, 2 Mill Street Perth 6000
Western Australia
2
Directors’ Report
Your directors present their report together with the financial statements of the consolidated entity being Core
Lithium Ltd (“Core” or “the Company”) and its controlled entities (“the Group”) for the half year ended 31 December
2023 and the Independent Auditor’s Review Report therein.
Directors
The Directors of the Company who held office during the half year and up to the date of this report are stated
below. Directors were in office for this entire period unless otherwise stated.
Greg English
Heath Hellewell
Malcolm McComas
Andrea Hall
Non-Executive Chair
Non-Executive Director
Non-Executive Director
Non-Executive Director (resigned 12 March 2024)
Review of operations and financial results for the period
Finniss Operations
During the six months ending 31 December 2023 (HY24), a total of 49,530 tonnes (t) of spodumene concentrate
was produced at an average grade of 4.8%. This was produced with an average cash operating unit cost for HY24
of $1,926/t. There was significant progress made in both the mine and processing plant that led to improved
productivity and record production. Continuous recovery improvement was demonstrated during the period with
monthly recovery reaching as high as 63%. During HY24, there was a focus on building consistent ore supply to
the Run of Mine pad (ROM) with ore stockpile at 31 December 2023, totalling 289kt.
Despite the improvement in production, the market deteriorated in the HY24 period, with a significant fall in the
lithium price over the past 12 months down 85% to US$950/t at 31 December 2023.
The BP33 early works were suspended during December 2023. As a result of the significant fall in the lithium
price, post half year end, on 5 January 2024, Core announced the suspension of mining at the Grants open pit
operation. Consequently, activity has been reduced to processing existing ROM stockpiles, which are expected
to be depleted by mid-2024. The Group will continue to monitor the lithium market in considering a possible restart
of mining at the Grants open pit. Further detail on the impact of these matters is discussed below in the significant
changes to the state of affairs.
Sustainability
In HY24, Core continues to refine sustainability frameworks, systems, and protocols in line with leading practice
guidelines.
The focus on Critical Risk Management (CRM) continued during the period. The integration of CRM into
assessments of material safety risk events was finalised and ready for implementation. The health monitoring
program continued with a full year of monitoring data set to inform risk management activities and control
effectiveness programs.
Water storage and discharge infrastructure construction continued and was commissioned in preparation for the
upcoming wet season. An updated water management strategy was prepared to reflect the increased sizing of
water storage facilities and the improved linkage of facilities and operational efficiency. Telemetered water
monitoring stations have been installed at downstream sites to improve the data which informs our operational
water strategy.
3
Financial Overview
Summarised below is a reconciliation of the Group’s underlying performance, (non-lFRS measure) to the reported
Loss after income tax:
HY24
$000’s
Sales
134,796
Cash cost of sales
(72,458)
Non-cash inventory net realisable value adjustment (NRV)
(28,074)
Corporate expenses
(13,715)
Other operating cost
(4,287)
Onerous contract expenses
(27,582)
Foreign currency loss
(134)
EBITDA1
(11,454)
Impairment of non-financial assets
(119,647)
Impairment of capitalised exploration expense
(792)
Depreciation and Amortisation
(33,635)
EBIT1
(165,528)
Finance costs
(1,451)
Interest and other income
4,221
Operating Loss before income tax
(162,758)
Income tax expense
(4,862)
Loss after income tax
(167,620)
1.
This financial performance summary is a non-IFRS measure and is unaudited.
Financial Performance
The Group generated revenue for HY24 of $134.8 million from shipments of spodumene concentrate and fines.
The cash cost of sales of $72.5 million represents the mining, processing and site general and administration
costs. Other operating cost mainly relates to royalties that were payable to the Northern Territory Government of
$1.4 million and to Lithium Royalty Corporation of $2.0 million and demobilisation cost for the mining contractor
of $2.3 million.
The Group’s earnings before interest tax, depreciation and amortisation (EBITDA) were a loss of $11.5 million.
This EBITDA loss reflects the impact of non-cash NRV adjustments of $28.1 million and provision for onerous
contracts of $27.6 million. Before the one-off impact of onerous contract expenses, the EBITDA would be an
income of $16.1 million.
As a result of the decision to suspend mining at the Grants open pit and the decline in lithium prices, an impairment
loss of $119.6 million was recorded. Total depreciation and amortisation across the Group was $33.6 million. In
summary, the Group reported a net loss after tax of $167.6 million.
Financial Position
As at 31 December 2023, Core had cash of $124.8 million and inventory with a net realisable value of $33.6
million (a majority being the ore stockpiled in preparation for the wet season). The Group has derecognised its
deferred tax assets, which related to tax losses that were expected to be recouped against future taxable income.
Sales and Marketing
Core sold 54.1kt of spodumene concentrate in the HY24 period, at an average realised price (spodumene
concentrate 6% equivalent) of US$2,098/t1 and 46.3kt of lithium fines at an average realised price of US$106/t.
The pricing mechanism includes adjustments for grade and a price settlement period. Pricing periods used to
adjust provisional pricing are typically a two-month period, including the month of shipment, which is intended to
ensure final pricing is better aligned with the time of delivery of product to the end customer. Based on the current
lithium pricing, a repayment of $13.7 million has been recognised as a financial liability for the November and
December shipments.
Core is currently in discussions with its offtake partners regarding future delivery schedules and the potential
impact of the decision to suspend mining on the long-term offtake agreements.
1
This SC6 price is before grade adjustments and penalties associated with Core’s lower grade concentrate, which averaged 4.8% in the period.
4
Exploration and Studies
Core continued to work to grow the Finniss Lithium Project’s Mineral Resources and undertook extensive drilling
in the HY24 period. Total exploration expenditure for the HY24 period was $21.5 million, directed towards resource
definition drilling at BP33 and Carlton and extension and definition drilling of other known deposits at Lees-Booths,
Ah Hoy, Penfolds and Hang Gong. Geophysical and geochemical surveys were also undertaken to identify new
targets and were successful in identifying a number of anomalies which warrant further exploration attention.
While some of this work commenced prior to the onset of the wet season, this work has provided additional
exploration targets across the Finniss leases.
An updated Mineral Resource estimate for BP33 was announced on 16 October 2023 with an increase in the
proportion of the Measured and Indicated categories to 9.36Mt, 89% of the total Mineral Resource Estimate. Infill
drilling completed as part of the Resource’s Definition program has led to an increase in the average grade and
resource estimate at BP33 from 10.1Mt at 1.48% Li2O2 to 10.5Mt at 1.53% Li2O3. As announced, the BP33 early
works was suspended and all construction and infrastructure material delivered to site will be secured until a
decision is made to recommence the early works at BP33. Work continues on the BP33 updated feasibility study,
with BP33 Final Investment Decision (FID) deferred until market conditions improve.
Significant changes to the state of affairs
As detailed above, there has been a significant change in the operations at the Finniss Lithium Project.
Additionally, the Group announced the termination of the mining services agreement with Lucas Total Contract
Solutions (Lucas) by mutual agreement. 4 Operational activity has been reduced to processing existing ore
stockpiles with ~289kt on the ROM pad at 31 December 2023.
Core remains debt-free with a cash balance of $124.8 million at the end of the period. The Group has moved to
reduce costs and preserve cash. Core will strictly assess capital allocation with the aim of emerging from the
current market conditions in the best condition possible. The Group retains significant exploration potential, both
within the Finniss region and its broader tenement portfolio which includes the Shoobridge and Anningie Barrow
Creek lithium projects as well as the Napperby uranium project.
Key risks and uncertainties
As detailed above, subsequent to 31 December 2023 the nature of Core’s business has changed. In light of these
circumstances, the key risks that may impact Core’s financial and operating results in the future are presented
below:
Health and safety: managing inherent hazards to safeguard physical and psychological health, ensuring
activities are executed to minimise risks.
Operational delivery: with a focus on processing existing stockpiles, ensuring constant engagement with our
contractors, and detailed planning is required to mitigate operational risks. Ensuring timely delivery of products
to customers in a rapidly changing environment.
Financial resilience: as highlighted by the recent significant fall in the lithium prices, the Group will continue
to manage revenue uncertainty and currency risks to maintain financial stability in the face of market volatility.
Growth and development: the cessation of mining at the Grants open pit and the processing of stockpiles
are expected to finish in mid-2024. The Group will focus on growth strategies, acknowledging uncertainties in
mineral resources and reserves estimation and recognising the desire to retain a strong financial position
should prices improve.
Mining and processing risks and insurance risks: insurance is maintained to mitigate inherent operational
hazards, acknowledging potential impacts on financial performance.
Legal and regulatory compliance: monitoring legal requirements and implementing checks within contracts
ensures that the changing nature of operations complies with regulatory standards.
Social licence to operate: maintaining community relations by fulfilling promises and adapting to changing
societal expectations through regular communication.
Environment, including climate change: committing to environmental stewardship, considering climate
2
The BP33 Mineral Resource of announced on 6 March 2023 is comprised of Measured Resource 2.85Mt @ 1.46% Li2O, Indicated Resource 4.09Mt @ 1.53% Li2O and Inferred
Resource 3.17Mt @ 1.45% Li 2O.
3
The BP33 Mineral Resource of announced on 16 October 2023 is comprised of Measured Resource 2.85Mt @ 1.44% Li 2O, Indicated Resource 6.51Mt @ 1.55% Li2O and Inferred
Resource 1.14Mt @ 1.59% Li 2O. Core confirms that the Company is not aware of any new information or data that materially affects the Mineral Resource Estimates cross referenced
in this report and confirms that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
4
Refer to ASX announcement dated 28th February 2024.
5
change impacts, and mitigating risks to maintain operational integrity and future viability.
Anti-corruption and ethical misconduct: establishing processes and fostering a culture of ethical behaviour
mitigate risks of misconduct.
Cybersecurity: protocols and governance frameworks are in place to manage cyber risks across IT
infrastructure.
This half-year financial report includes a summary of the operating and financial risk management disclosures
required for an annual report. It should be read in conjunction with the Group’s most recent Annual Report,
available on the Company’s website. Readers are encouraged to carefully review and contemplate these risks
when assessing the information presented in this report.
Risk management
Core has a Risk and Sustainability Committee that is tasked, among other things, with consistently identifying and
assessing risks to the business. Details about this Committee and the Group’s 2023 Corporate Governance
Statement are available on our website at www.corelithium.com.au/about/corporate-governance.
Rounding of amounts
Amounts in this report and the accompanying financial report have been rounded to the nearest thousand dollars
($'000) unless otherwise stated under the option available to the Company under ASIC Corporations (Rounding
in Financial/Directors' Report) Instrument 2016/191. The Company is an entity to which the instrument applies.
Events arising since the end of the reporting date
On 5 January 2024, the Group announced that mining at Grants open pit and BP33 early works program had
been suspended due to the significant fall in the lithium price. As at 31 December 2023, the Group had ~289kt of
ore stockpiles and it is expected it will take approximately 6 months to process this material.
On 28 February 2024, the Group announced the mining services agreement with Lucas had been terminated by
mutual agreement.
On 12 March 2024, the Group announced the resignation of non-executive director Andrea Hall and Gareth
Manderson stepping down from the CEO role, with Doug Warden appointed interim CEO, and James Virgo
appointed interim CFO.
Subsequent to period end, the Group advised Primero that the operation and maintenance agreement for the
DMS plant would end once the processing of the remaining ROM stocks was completed.
No other matters or circumstances have arisen since the end of the half year which significantly affected or may
significantly affect the operations of the Group, the results of those operations or the state of affairs of the Group
in subsequent financial years.
Greg English
Non-Executive Chair
12 March 2024
6
Auditors Independence Declaration
Grant Thornton Audit Pty Ltd
Grant Thornton House
Level 3
170 Frome Street
Adelaide SA 5000
GPO Box 1270
Adelaide SA 5001
T +61 8 8372 6666
Auditor’s Independence Declaration
To the Directors of Core Lithium Limited
In accordance with the requirements of section 307C of the Corporations Act 2001, as lead auditor for the review
of Core Lithium Limited for the half-year ended 31 December 2023. I declare that, to the best of my knowledge
and belief, there have been:
a
no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to the
review; and
b
no contraventions of any applicable code of professional conduct in relation to the review.
GRANT THORNTON AUDIT PTY LTD
Chartered Accountants
J L Humphrey
Partner – Audit & Assurance
Adelaide, 12 March 2024
www.grantthornton.com.au
ACN-130 913 594
Grant Thornton Audit Pty Ltd ACN 130 913 594 a subsidiary or related entity of Grant Thornton Australia Limited ABN 41 127 556 389 ACN 127 556 389.
‘Grant Thornton’ refers to the braunder which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or refers
to one or more member firms, as the context requires. Grant Thornton Australia Limited is a member firm of Grant Thornton International Ltd (GTIL). GTIL
and the member firms are not a worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered by the member firms.
GTIL does not provide services to clients. GTIL and its member firms are not agents of, and do not obligate one another and are not liable for one another’s
acts or omissions. In the Australian context only, the use of the term ‘Grant Thornton’ may refer to Grant Thornton Australia Limited ABN 41 127
556 389 ACN 127 556 389 and its Australian subsidiaries and related entities. Liability limited by a scheme approved under Professional Standards
Legislation.
7
STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME
For the half year ended 31 December 2023
Notes
Revenue from contracts with customers
Cost of sales
3
31 December
2023
31 December
2022
$'000
134,796
$'000
-
(132,613)
-
Gross profit
2,183
-
Interest income
3,060
1,004
Other income
1,161
-
Operating expenses
4
(5,744)
-
Onerous contracts provision expense
13
(27,582)
-
General and administration expenses
5
(13,812)
(8,830)
Impairment of non-financial assets
9
(119,647)
-
Impairment of capitalised exploration expense
7
(792)
(1,049)
(1,451)
(329)
(134)
(29)
(162,758)
(9,233)
(4,862)
-
(167,620)
(9,233)
-
-
(167,620)
(9,233)
Basic loss per share
(8.16)
(0.52)
Diluted loss per share
(8.16)
(0.52)
Finance costs
Foreign currency loss
Loss before income tax expense
Income tax expense
Net loss for the period
Other comprehensive income
Total comprehensive loss for the period
10
Earnings per share from continuing operations
This statement should be read in conjunction with the notes to the financial statements.
8
STATEMENT OF FINANCIAL POSITION
As at 31 December 2023
31 December
2023
$'000
30 June 2023
Cash and cash equivalents
124,826
152,786
Trade and other receivables
10,197
6,745
570
160
33,595
28,851
2,052
3,191
171,240
191,733
11,922
11,802
7
74,323
53,572
Plant, equipment, and mine development assets
8
135,186
241,174
Deferred tax asset
10
-
4,862
Total non-current assets
221,431
311,410
TOTAL ASSETS
392,671
503,143
31,967
30,978
14,865
83,623
1,305
2,368
Notes
$'000
ASSETS
Current assets
Other financial assets
Inventories
6
Other assets
Total current assets
Non-current assets
Other assets
Exploration and evaluation assets
LIABILITIES
Current liabilities
Trade and other payables
Financial liabilities
11
Other liabilities
Lease liabilities
12
2,273
3,461
Provisions
13
11,274
569
61,684
120,999
Total current liabilities
Non-current liabilities
Lease liabilities
12
3,314
19,483
Provisions
13
32,069
7,739
Total non-current liabilities
35,383
27,222
TOTAL LIABILITIES
97,067
148,221
NET ASSETS
295,604
354,922
478,632
370,940
958
532
(183,986)
(16,550)
295,604
354,922
EQUITY
Issued capital
Reserves
Accumulated losses
TOTAL EQUITY
This statement should be read in conjunction with the notes to the financial statements.
9
14
STATEMENT OF CHANGES IN EQUITY
For the half year ended 31 December 2023
Issued
Accumulated
losses
$'000
Total
equity
$'000
(16,550)
354,922
Balance at 1 July 2023
Reserves
capital
$'000
$'000
370,940
532
Issue of shares - share placement
100,000
-
-
100,000
Issue of shares - Shares Purchase Plan (SPP)
11,368
-
-
11,368
Issue costs – net of tax
Performance rights issued to officers and employees
at fair value
Lapse of performance rights at fair value
(3,676)
-
-
(3,676)
-
610
-
610
-
(184)
184
-
Transactions with owners
478,632
958
(16,366)
463,224
Total profit or loss
-
-
(167,620)
(167,620)
Total other comprehensive income
-
-
-
-
478,632
958
(183,986)
295,604
Reserves
Accumulated
losses
$'000
Total
equity
$'000
454
(27,397)
238,725
2023
Comprehensive income:
Balance 31 December 2023
Issued
2022
capital
Balance at 1 July 2022
$'000
265,668
Issue of shares - share placement
100,000
-
-
100,000
Issue costs
Performance rights and options issued to officers
and employees at fair value
Fair value of performance rights and options lapsed
(3,781)
-
-
(3,781)
-
99
-
99
-
(38)
38
-
1,487
(68)
-
1,419
135
(135)
-
-
363,509
312
(27,359)
336,462
Total profit or loss
-
-
(9,233)
(9,233)
Total other comprehensive income
-
-
-
-
363,509
312
(36,592)
327,229
Exercise of options
Exercise of performance rights at fair value
Transactions with owners
$'000
Comprehensive income:
Balance 31 December 2022
This statement should be read in conjunction with the notes to the financial statements.
10
STATEMENT OF CASH FLOWS
For the half year ended 31 December 2023
31 December
2023
$'000
31 December
2022
$'000
Receipts from customers
67,750
-
Interest received
3,060
1,004
(125,048)
(13,408)
(549)
-
(54,787)
(12,404)
(53,839)
(84,181)
(22,495)
(9,951)
42
-
-
86
(530)
-
Net cash used in investing activities
(76,822)
(94,046)
Financing activities
Proceeds from the issue of share capital
111,368
100,000
-
1,737
Payments of share issue transaction costs
(3,675)
(3,781)
Payments of lease liabilities
(2,670)
(1,365)
Net cash from financing activities
105,023
96,591
Net change in cash and cash equivalents
(26,586)
(9,859)
Net foreign exchange difference
(1,374)
-
Cash and cash equivalents at the beginning of the period
152,786
135,198
Cash and cash equivalents at the end of the period
124,826
125,339
Operating activities
Payments to suppliers and employees
Interest paid
Net cash used in operating activities
Investing activities
Payments for plant, equipment, and mine development assets
Payments for capitalised exploration and evaluation
expenditure
Proceeds from disposal of plant and equipment
Government co-funding grants received
Payments for environmental and security bonds
Proceeds from exercise of options
This statement should be read in conjunction with the notes to the financial statements.
11
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2023
1 Statement of significant accounting policies
a) Reporting entity
Core Lithium Ltd (the “Company”) is a listed public company registered and domiciled in Australia.
These consolidated interim financial statements (“interim financial statements”) as at and for the 6
months ended 31 December 2023 comprise the Company and its subsidiaries (together referred
to as the “Group”).
The Group is an Australian hard-rock lithium mining company that owns and operates the Finniss
Lithium Project on the Cox Peninsula, 88km south-west of the Darwin Port in the Northern Territory.
b) General information and basis of preparation
The interim financial statements of the Group are for the six months ended 31 December 2023 and
are presented in Australian dollars ($) which is the functional currency of the Group. The amounts
contained in the financial report have been rounded to the nearest $1,000 (where rounding is
applicable) where noted ($000).These general purpose interim financial statements have been
prepared in accordance with the requirements of the Corporations Act 2001 (Cth) and AASB 134 Interim Financial Reporting.
They do not include all the information required in annual financial statements in accordance with
AASB and should be read in conjunction with the consolidated financial statements of the Group
for the year ended 30 June 2023 and any public announcements made by the Group during the
half year in accordance with the continuous disclosure requirements arising under the Australian
Securities Exchange Listing Rules and the Corporations Act 2001 (Cth). The Group is a for profit
entity for the purposes of preparing its financial statements.
The interim financial statements have been approved and authorised for issue by the board of
directors on 12 March 2024.
c) Critical accounting estimates and judgements
The Directors evaluate estimates and judgements incorporated into the interim financial report
based on historical knowledge and best available current information. Estimates assume a
reasonable expectation of future events and are based on current trends of economic data,
obtained both externally and within the Group.
d) Onerous contracts
If the Group has a contract that is onerous, the present obligation under the contract is recognised
and measured as a provision. However, before a separate provision for an onerous contract is
established, the Group recognises any impairment loss that has occurred on assets dedicated to
that contract.
An onerous contract is a contract under which the unavoidable costs (i.e. the costs that the Group
cannot avoid because it has the contract) of meeting the obligations under the contract exceed the
economic benefits expected to be received under it. The unavoidable costs under a contract reflect
the least net cost of exiting from the contract, which is the lower of the cost of fulfilling it and any
compensation or penalties arising from failure to fulfil it. The cost of fulfilling a contract comprises
the costs that relate directly to the contract (i.e. both incremental costs and an allocation of costs
directly related to contract activities).
12
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2023
2 Operating segments
Management has determined the operating segments based on internal reports about components of
the Group that are regularly reviewed by the CEO as Chief Operating Decision Maker (CODM), to
make strategic decisions. The Group has identified two reportable segments of its business:
Finniss Lithium Project mining, crushing and processing operations. Mining at Grants open pit
and BP33 early works program has been suspended due to the significant deterioration in the
lithium price. Processing existing stockpiles will continue for up to six months. The Group will
continue to monitor the lithium market in considering a possible restart of mining at the Grants
open pit.
Exploration: exploration and evaluation of primarily lithium mineralisation.
The CODM monitors performance in these areas separately. Unless stated otherwise, all amounts
reported to the CODM are determined in accordance with accounting policies that are consistent with
those adopted in the annual financial statements of the Group. Operating segment performance details
for the six-month periods ended 31 December 2023 and 31 December 2022 are set out below:
Segment results
December 2023 Segment results
Segment revenue
Cost of sales
Gross profit
Exploration and evaluation assets and impairment
Other operating expenses
Onerous and general contract expenses
Impairment of non-financial assets
Segment margin
Interest income
Other income
General and administration expense
Finance costs
Foreign currency loss
Loss before tax
December 2022 Segment results
Segment revenue
Cost of sales
Gross profit
Exploration and evaluation assets and impairment
Other operating expenses
Segment margin
Interest income
Finance costs
Other expenses
Loss before tax
13
Finniss
Lithium Project Exploration
$’000
$’000
134,796
(132,613)
2,183
(792)
(5,744)
(27,582)
(119,647)
(150,790)
(792)
Finniss
Lithium Project Exploration
$'000
$'000
(1,049)
(3,238)
(3,238)
(1,049)
Total
$'000
134,796
(132,613)
2,183
(792)
(5,744)
(27,582)
(119,647)
(151,582)
3,060
1,161
(13,812)
(1,451)
(134)
(162,758)
Total
$'000
(1,049)
(3,238)
(4,287)
1,004
(329)
(5,621)
(9,233)
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2023
2 Operating segments (cont.)
Operating segment assets are reconciled to total assets as follows:
31 December
30 June
2023
$’000
2023
$’000
Finniss Lithium Project
197,246
288,957
Exploration
64,141
54,370
Total segment assets
261,387
343,327
124,826
152,786
1,218
582
570
160
1,042
796
-
4,862
3,628
630
392,671
503,143
31 December
30 June
2023
$’000
2023
$’000
90,232
140,985
14
4,246
90,246
145,231
Trade and other payables
1,396
2,232
Financial liabilities
1,305
-
Lease liabilities
3,468
333
652
425
97,067
148,221
Segment assets
Unallocated assets:
Cash and cash equivalents
Other receivables
Other financial assets
Other assets
Deferred tax asset
Plant and equipment assets
Total assets
Operating segment liabilities are reconciled to total liabilities as follows:
Segment liabilities
Finniss Lithium Project
Exploration
Total segment liabilities
Unallocated liabilities:
Provisions
Total liabilities
14
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the half year ended 31 December 2023
3 Cost of sales
31 December
2023
$’000
68,908
31 December
2022
$’000
22,294
Processing costs
24,233
2,422
Port costs
8,808
643
(2,778)
(10,277)
Employee benefits expense
2,461
2,015
Depreciation and amortisation expense2
33,538
2,487
Mining cost deferral1
(2,557)
(19,584)
Total cost of sales
132,613
Mining costs1
Net inventory movement
1
2
-
Mining costs are shown as a gross expense with mining cost deferral representing costs associated with waste stripping that are
deferred to mine properties in the Statement of Financial Position and amortised over the life of mine.
Depreciation & amortisation reflects the amount charged to the profit & loss statement. There was an additional $11.2 million in
depreciation & amortisation which was included in inventory at balance date and will be charged to Cost of Sales when the
inventory is sold.
4 Operating expenses
31 December
2023
$’000
3,439
Royalties
1
31 December
2022
$’000
-
Demobilisation expense1
2,305
-
Total operating expenses
5,744
-
Demobilisation expense relates to the costs associated with the suspension of mining activit
Share your feedback