Quarterly Report and Production Guidance/Cashflow Report
Released
Released
Announcement PDF
ASX: CXO Announcement
24 July 2023
Quarterly Activities Report for the
Three Months Ended 30 June 2023
Australian lithium miner Core Lithium Limited (ASX: CXO) (Core or the Company) is pleased to present its
Quarterly Activities Report for the quarter ended 30 June 2023.
Quarterly Highlights
•
No significant safety incidents.
•
Quarterly spodumene production of 14,685t (FY23: 18,274t) at a C1 unit cost of $902/t (FY23: $1,230/t).
•
Spodumene concentrate between 5.35% and 5.6% (on specification). Lithia recoveries ~49% with work
underway on improvement initiatives.
•
Maiden 5,500t spodumene concentrate shipment in April and second 13,100t shipment in early July.
•
$45-$50 million approved for BP33 underground mine early works.
•
Revised BP33 feasibility study underway including incorporation of the increased resource.
•
Total Finniss Mineral Resource increased 62% to 30.6Mt @1.31% Li2O.
•
$25 million exploration program underway.
•
Cash balance as at 30 June 2023 of $152.7 million and no debt.
•
Andrea Hall appointed as Non-Executive Director and executive team complete following the appointments
of Pierre Malan as EGM, Development and Exploration and Paul Benjamin as EGM, Commercial and
Marketing (announced subsequent to the quarter).
Production and cost guidance
This report includes Core’s maiden production and cost guidance following 14 weeks of plant operations on
a campaign basis. Core’s guidance for FY24 is for spodumene sales of 90,000 to 100,000 tonnes and
spodumene production of 80,000 to 90,000 tonnes (this is lower than study estimates due mainly to lower
recoveries, mine plan adjustments and mining rates), at a C1 cost of $1,165 to $1,250 per tonne.
With respect to the outlook for FY25, Core expects monthly mining and processing rates to be above FY24
levels whilst the Company continues mining in the Grants open pit. However, overall production in FY25 is
expected to be below FY24 due to a currently anticipated three-month gap in ore supply from the mine and
processing plant capacity constraints result in a ROM pad stockpile building at the conclusion of FY25. More
detail is provided on page 4.
Commenting on the quarter, Core Chief Executive Officer Gareth Manderson said:
“This quarter marks an important new phase in the life of our emerging operating and development
company. We have now been through our first quarter with periods of integrated mining and processing
operations and have successfully produced, transported, and sold our first cargoes of spodumene
concentrate. Since joining Core in August 2022, the team has successfully brought the Finniss operation
into production on time and within two years of commencing construction. In parallel, we have continued
to explore and grow our mineral resources as we work to determine the true potential of the Finniss
mineralised district.
Our operation remains in its start-up phase. In aggregate the team has achieved a combined 14 weeks of
plant operations on a campaign basis since first concentrate was produced and access to the pit,
uninterrupted by rain events, was achieved in mid-April. Using this early operating experience, we have
undertaken a thorough budgeting and forecasting process and provided production and cost guidance for
FY2024 and an early view of the 2025 production outlook. Production forecasts are lower than what was
anticipated in the July 2021 Definitive Feasibility Study and cost expectations are higher. Following this
review, we are working through a suite of improvement projects to drive Finniss operating performance to
deliver higher mining rates, improve lithia recoveries and commercialise the fines products.
As is common during the project start-up phase, we are continuing to better understand the Finniss ore
processing characteristics and mine performance with several key learnings being implemented. Grants
remains the starter operation which is delivering near-term cash flow to fund our growth. BP33 is the next
mine to be developed and the more significant operation which underpins the business.
The revised feasibility study for BP33 is being advanced by the management team and this project remains
on track for a Final Investment Decision in 1Q 2024 to capitalise on strong lithium markets, with early works
approved to ensure the overall timeline can be maintained. Additionally, we have expanded our FY24
exploration budget to A$25 million given our track record of resource growth and due to the broad range of
exciting greenfield and brownfield prospects identified in the mineralised district.
We welcomed experienced company director Andrea Hall to the Board in May 2023 and completed
recruitment of an experienced executive leadership team. With the team now in place, we are well
positioned to deliver improved operational performance and sound commercial outcomes. Core’s lithium
remains in strong demand as the world continues to decarbonise and we have the right team to deliver
sustainable value for shareholders.”
Safety and Sustainability
There was one recordable injury during the quarter, a minor hand laceration and no other significant safety
incidents. Core implemented the Critical Risk Management (CRM) program which has been adopted widely
across industry in recent years. The program prioritises the identification of fatality risk and implementing
and verifying critical prevention controls. CRM was also rolled out to our contractors. An occupational
health monitoring program has been established and will inform our control processes for potential health
exposure hazards including dust, noise and silica. An agreement for medical evacuation services was
entered into with Care Flight.
Recipients of the inaugural Community Grants Program were chosen and 12 community groups from across
the greater Darwin region were awarded funds. These included sporting, educational and other community
initiatives. Engagement with the local Kenbi Rangers in management activities including prescribed burns
for fuel reduction is ongoing. The emergency response team undertook training as part of these burns.
2
Finniss Operations
Mining
Mining commenced at the Grants open pit in September 2022 and the first parcel of Direct Shipping Ore
(DSO) was produced in December 2022. As previously announced, this was followed by a period of three
months where mining ceased due to wet season conditions and water filling the pit. As previously
announced, safe access to the pit was achieved in late March, with mining activity commencing shortly
afterwards.
Mining performance remained below expected levels during the quarter due in part to further inclement
weather in April. Upgraded dewatering equipment installed in the pit ahead of the rainfall events in April,
albeit less severe, enabled the successful discharge of water and allowed mining to continue during the
month.
Mining through weathered material continued during the quarter with harder host rock expected to be
encountered in the coming months. Mining conditions in this weathered material has led to adjustments
being made to the mine design and plan, including shallower angled walls in the pit. Wall stability
monitoring continues with the addition of drilling horizontal bores to depressurise walls and contribute to
wall stability. Work continues to focus on improving mining rates as ramp-up continues. Access to ore at
the base of the pit has improved now that the wet season has ended.
A review of the recent wet season has resulted in $11 million in capital invested to date to improve water
management infrastructure.
Processing
The plant had its second quarter in operation following construction completion and first concentrate
produced in February 2023. The operation remains in the ramp up phase. Given reduced ore availability
following the mining interruption in Q3 FY23, the plant was run largely on a campaign basis when ore was
available. The plant has run for a collective total of just 14 weeks, but this has provided the first opportunity
to performance test and trial processing parameters.
Spodumene concentrate produced was on specification and ranged in grade between 5.35% and 5.6%.
However, as is not uncommon during the start-up phase, recoveries have been lower than the original test
work predicted, averaging 49% for the quarter. Work is underway to better understand the lower than
expected recoveries which appear to be as a result of a greater proportion of fines than anticipated. Core is
working on several project improvement initiatives discussed further below.
As at 30 June there was 7,598 tonnes of stockpile on the ROM pad.
Improvement projects and fines sales
A range of trials and improvement projects to increase lithia recoveries and plant utilisation have been
developed with some commencing during the quarter.
To help address the lower recoveries in the near-term, the potential for lithium fines to become a saleable
by-product has been identified. This material is generated during ore crushing and the processing of ore by
the DMS plant. An initial parcel of the fines material is to be transported to the Port of Darwin for anticipated
sale in Q1 FY24 (see also guidance section below).
Other near-term projects designed to minimise fines and increase recoveries include: adjusting screen sizing
before the crusher (underway), reagent (FeSi) volume and timing adjustments, further metallurgical test3
work to inform optimal ore size distribution created in the crushing process and the commissioning of a mica
classifier.
Longer lead-time improvement options may include the installation of fines processing circuit. This may
include options such as a filter press or belt press to recover fines before deposition in the storage facility
and/or the installation of a floatation plant. These options will be evaluated in FY24.
Table 1. Quarterly Operating Performance
Production
Spodumene concentrate produced
Recovery
Sales
DSO Shipments
Spodumene Concentrate Shipments
Concentrate grade shipped
Cost of production
C1 Cost
C1 cost plus royalties
Deferred stripping costs (non-cash)
Q3 FY23
Q4 FY23
Tonnes
%
3,589
47.4
14,685
48.6
Tonnes
Tonnes
%
14,774
n/a
5,423
5.35%
A$/t FOB
A$/t FOB
A$/t
2,188
2,323
902
1,416
(5,594)
(1,176)
FY23 unit costs
The Q4 C1 unit costs of $902/t reflect the continuing ramp up phase of the Finniss project and a significant
non-cash deferral of waste stripping costs ($1,176/t) associated with the Grants open pit. These non-cash
costs will be depreciated over the remaining life of Grants. The unit costs for the six months ended 30 June
2023 were $1,230/t.
Table 2. FY24 Guidance
FY2024
Production (subject to weather conditions)
Production (tonnes)
Sales (tonnes)
Sale of fines (tonnes)*
Costs and Capital expenditure
C1 costs (A$/t)**
Site sustaining capital
Deferred Stripping
Growth expenditure
BP33 Early Works***
Exploration and study expenditure****
80,000-90,000
90,000-100,000
85,000-95,000
A$1,165-1,250
$20-$25m
$45-$50m
$45-$50m
$35-$40m
*Treated as a by-product credit to C1 costs.
**Unit operating costs (FOB Darwin excluding royalties) include mining, processing, transport, port charges, and site based general
and administration costs and are net of fines margin by-product credit. It is calculated on an accruals basis and includes inventory
movements, and credits for capitalised deferred mine waste stripping.
***If the BP33 project is approved in Q1 FY24 there will also be additional project execution expenditure in FY24.
****Includes Finniss District and greenfields expenditure and study costs
4
FY24 production and cost guidance
Core’s production guidance for the 12 months ending 30 June 2024 (FY24) is between 80,000 tonnes and
90,000 tonnes (FY23: 18,274 tonnes) of spodumene concentrate at a C1 cost of between $1,165-$1,250 per
tonne (FY23:$1,230/t). This assumes reduced ore mining in the wet season months between December and
March.
The main drivers of the lower production compared to the 2021 DFS estimates are lower lithia recoveries, a
revised mine plan which has seen the layback of the pit walls (discussed in the operations section above)
and more conservative mining assumptions, following the Company’s experience in the recent wet season.
The Company also intends to recover and sell fines material, see (Fines Material) section below.
FY25 production outlook
Whilst at this stage definitive guidance for FY25 cannot be provided, Core expects monthly mining and
processing rates to be above FY24 levels whilst the Company continues mining in the Grants open pit.
However, overall production in FY25 is expected to be below FY24, due to a three-month gap in ore
feedstock supply from the mine and processing plant capacity constraints, which result in a ROM pad
stockpile building at the conclusion of FY25.
Core is evaluating options to optimise its production outlook which includes increasing the ROM pad
stockpile over time such that the processing plant can have more reliable ore feedstock after considering
mine scheduling and the wet season, increasing the DMS plant throughput and/or DSO sales to bring
forward revenue into FY25.
The FY25 production outlook currently assumes no ore from BP33 in 2025. Core is currently in advanced
stages of preparing a revised BP33 Feasibility Study which is due in 1Q 2025, this study work includes
additional study work on how to optimise the transition between Grants open pit and BP33 underground,
including the assessment of the potential to recover ore currently not in the Grants mine plan.
Non-cash adjustments
In FY24, the Grants open pit strip ratio remains high at 23:1. This will allow access to ore in FY25 at a lower
stripping ratio of 9:1. Consequently, a significant portion of the costs associated with this stripping activity
will not be recognised as an expense in FY24 (non-cash deferred stripping costs of $45-50m). Instead, they
will be recorded as non-cash expenses when the ore is extracted in subsequent years. Mining cash costs are
expected to be lower in FY25.
Royalties
Not included in the cost guidance above are the cash outflows for the Northern Territory (NT) royalty.
Under the NT royalty regime, Core must pay royalties to the government based on the net value of
resources extracted. Core pays a royalty to the NT Government each financial year based on a non-IFRS
profit-based formula. The royalty payable is calculated as 20% of the net value from production in the year.
The net value is calculated by subtracting from revenue certain operating costs, applicable capital cost
deductions, eligible exploration expenditure and accumulated losses from prior years. It is expected that in
FY24 the effective royalty rate resulting from this calculation will be between 8-10% of gross revenue. The
Northern Territory government has commenced a consultation process with industry, to evaluate the
merits of an Ad Valorem based royalty system.
There is also a 2.5% (of gross revenue) royalty payable to Lithium Royalty Corp (LRC).
5
Fines material
The Company expects FY24 to include the potential to produce and sell approximately 85,000-95,000t of
fines at a grade of approximately 1% Li2O. The Company does not expect to incur any incremental mining or
processing costs associated with the fines production. Additional operating costs for material movement,
storage, haulage to port, ship loading and shipping will be incurred. NT and LRC Royalties are also payable
on Fines sales. The Company is in the advanced stages of negotiating the sale of an initial parcel of fines for
shipment in Q1 of this financial year with pricing linked to the battery grade lithium carbonate price
adjusted for grade and value-in-use.
Based on current market prices, the margin from the forecast Fines sales for FY24, is expected to reduce C1
operating costs by approximately A$180-220/t of spodumene concentrate as a credit.
Exploration and Studies
The majority of the exploration expenditure will be allocated to further definition and extension of existing
Mineral Resources. The remaining funds will be directed towards identifying and testing new targets via a
combination of geochemistry, geophysics and drilling at Finniss and Shoobridge, and geochemistry and
geophysics at Anningie-Barrow Creek. There will also be expenditure to advance studies for BP33, Carlton,
Lees Booth and Hang Gong.
Capital Expenditure
Finniss sustaining capital is forecast to be $20-25 million. This includes water management civil work, port
storage building upgrade, ROM extension and haul roads.
Sales and marketing
Late in the March quarter, Core announced it had entered into additional agreements with Yahua for the
sale of a 3,500-tonne parcel and a 15,000-tonne parcel of Finniss lithium concentrate for approximately
18,500 tonnes1 in addition to the long-term offtake agreement for 300,000 tonnes of concentrate over four
years2.
In mid-May, the ship, St Andrew, was loaded with the first spodumene concentrate produced from the
Grants open pit. A cargo of approximately 5,500 tonnes of on-specification 5.6% Li2O spodumene
concentrate was sold to long-term customer Yahua3. This included the 3,500 tonnes along with an
additional ~2,000 tonnes which was part of the 15,000t parcel Yahua elected to have delivered early.
Subsequent to the end of the quarter a second shipment was loaded for export to Zhangjiagang in China.
This shipment of approximately 13,100 tonnes of spodumene concentrate was the balance of the 18,500
tonnes of commissioning and first production tonnes sold to Sichuan Yahua (Yahua) under ‘additional sales
agreements’ announced in March 20234.
1
See ASX announcement dated 23 March 2023
See ASX announcement dated 1 April 2019
3
See ASX announcement dated 5 May 2023
4
See ASX announcement dated 11 July 2023
2
6
Exploration and Development
BP33
On 11 May 2023, Core reported that the Northern Territory Government had approved the Mine
Management Plan (MMP) for the BP33 underground project5 – the second proposed mine at the Finniss
Lithium Operation.
BP33 is located within trucking distance of the Grants open pit, crusher and DMS plant (approximately 5km
away) and has a current Mineral Resource of 10.1Mt @ 1.48% Li2O6. The Grants open pit has provided an
attractive near-term entry point to lithium production, with the BP33 underground mine being the more
substantial mining operation and likely cornerstone of the business.
Core has commenced preparations for early works activities. The Company has also submitted the required
management plans and associated detailed designs required under the conditions of Mining Authorisation
and the Environmental Approval and are working with the Northern Territory Government to secure their
acceptance and allow commencement of the excavation of the box-cut.
On 19 May 2023, the Core Board approved an updated early works budget of $45-$50 million7. The
program includes the development of a covered box-cut, improved access works and associated surface
works for water management. This approach allows a detailed feasibility study to be completed in parallel
and enable mine decline development to begin soon after a positive FID.
Subject to potential early wet season, modelled geotechnical and groundwater impacts, the early works
activities are expected to be complete by end of Q1 CY24. The contract for the early works civil
construction was awarded to Northern Australian Civil (NAC), a Darwin-based contractor with prior box-cut
development experience.
This early works project will facilitate the next phase of capital works, including decline development, early
stope development, ventilation infrastructure, water management and power infrastructure to commence
immediately on receipt of a positive FID and board approval.
Core will provide further detail on the capital estimate for BP33 alongside its revised Feasibility Study which
is due in 1Q 2024. The updated study work captures the impact of the significantly larger BP33 Resource,
which has more than doubled since March 2023 to 10.1Mt @ 1.48% Li2O. The study work has had input
from a range of mining consultants with experience in both lithium and underground mining. The analysis
includes detailed metallurgical test work, geotechnical analysis, mine sequencing options, cost estimates
and ground water management analysis.
Other studies
Work has commenced on other studies to review and update mine sequencing in the Finniss district using
updated resource modelling. This includes reviews of the Grants underground, Carlton deposit, with concept
studies planned for Lees-Booths and alternative Hang Gong options after the current resource drilling
campaign.
5
See ASX announcement dated 11 May 2023
See ASX announcement dated 6 March 2023
7
See ASX announcement dated 19 May 2023
6
7
Exploration and Mineral Resources
On 18 April, Core reported a 62% increase to the total Finniss Mineral Resource Estimate (MRE) to 30.6Mt @
1.31% Li2O (Table 3). This updated Mineral Resource incorporated all results from the highly successful 2022
drilling campaign – the largest undertaken in Core’s history8.
The Measured and Indicated Resource categories have increased by 46% to 19.4Mt @ 1.37% Li2O.
Approximately 63% of the MRE is in the higher confidence Measured and Indicated categories (Table 3),
with excellent conversion of Inferred to Indicated.
Table 3. Finniss Lithium Operation Mineral Resource Estimate summary
Mineral Resource Estimate for the Finniss Lithium Operation
April 2023 - 0.5% Li2O cut-off9
Resource Category
Tonnes (Mt)
Li2O %
Li2O Contained Metal
(kt)
Measured
Indicated
6.98
1.45
101
12.4
1.33
165
Inferred
11.3
1.21
137
Total
30.6
1.31
403
Note: Totals within this table are subject to rounding.
Finniss Lithium Operation Mineral Resource Estimate growth
Mineral Resource Estimate for the Finniss Lithium Operation10
July 2022 - 0.5% Li2O cut-off
Resource Category
Tonnes (Mt)
Li2O %
% Change from 2022 to
2023
Measured
Indicated
5.60
1.46
25%
7.69
1.35
61%
Inferred
5.57
1.12
103%
Total
18.9
1.32
62%
Core has now commenced its 2023 drilling campaign targeting near-mine deposits within trucking distance
of the plant11. The $25 million exploration budget is the largest in the Company’s history.
During the quarter there was 9,581m of mine development and exploration drilling undertaken at BP33,
Carlton, Hang Gong and Lees and 1,529m testing new prospects. At the end of the quarter there were three
diamond drill rigs and one RC rig in operation with two more to be mobilised to site in the current quarter.
A reconnaissance visit was made to the Barrow Creek tenements and stakeholder engagement is ongoing.
Field work at the Anningie, Barrow Creek and Shoobridge tenements are planned for the current quarter.
8
See ASX announcement dated 18 April 2023
See ASX announcement dated 18 April 2023
10
See ASX announcement dated 12 July 2022
11
See ASX announcement dated 18 April 2023
9
8
Corporate and Financial
On 18 May 2023, the Core Lithium Board appointed Andrea Hall as a Non-executive Director. Ms Hall is an
experienced Non-executive Director and is currently a member of the board of ASX listed Evolution Mining
Limited (EVN) and mining services firm Perenti Group Ltd (PRN). Further, she sits on the board of the
Fremantle Dockers and the Insurance Commission of Western Australia12.
Subsequent to the quarter, Core Lithium appointed Pierre Malan as Executive General Manager (EGM),
Development and Exploration and Paul Benjamin as EGM, Commercial and Marketing. The appointments of
Mr Malan and Mr Benjamin were the final hires in a 10-month process to build an executive team with the
internal, commercial and development capabilities necessary for Core to pursue growth initiatives while it
transitions from developer to miner and operator. The structure and roles now established in the executive
team provide a lens into the strategy and value levers available to Core; sustainability, operational delivery,
commercial delivery, and exploration and development.
The evolution of Core Lithium’s Board and leadership team also aligns with the Company’s decision to
relocate its head office to Perth, the corporate centre of Australia’s lithium industry. Subsequent to the
quarter, Core announced it had secured its new head office at Level 9, 2 Mill Street, Perth13.
During the quarter, Core spent $28.1 million on plant, equipment and mine development activities, and $3.9
million on exploration. This expenditure primarily represented activities at Finniss and is disclosed in
Appendix 5B. As at 30 June 2023, Core had cash and equivalents of $152.7 million.
In April 2023, Core received a payment of US$14.1 million (A$22 million) for 90% of the 3,500-tonne parcel,
and a pre-payment of US$61.4m million (A$92 million) for 80% of the 15,000-tonne parcel.
Prepayment for 80% of the second parcel of $15,000t was received in April 202314. The balance of the second
parcel (3,100t) was shipped in July and will be finally settled and adjusted at the end of the pricing period in
August. If the current spodumene price prevails until the end of the pricing period, a repayment to Yahua of
approximately US$15m is expected. This is due to differences in the provisional and final quotational periods
for the pricing of the parcel and the decline in the market price for spodumene concentrate over that period.
Core’s Appendix 5B includes amounts in item 6.1. The amounts in item 6.1 represent director fees paid to
entities nominated by relevant directors and managing director costs.
As at 30 June 2023, Core had the following capital structure:
• 1,858,516,794 ordinary shares; and
• 3,122,451 unquoted performance rights.
Core Lithium confirms that the Company is not aware of any new information or data that materially affects
the Mineral Resource Estimates cross referenced in this report and confirms that all material assumptions
and technical parameters underpinning the estimates continue to apply and have not materially changed.
The BP33 Mineral Resource Estimate is comprised as Measured Mineral Resource 2.85Mt @ 1.46% Li2O /
Indicated Mineral Resource 4.09Mt @ 1.53% Li2O / Inferred Mineral Resource 3.17MT @ 1.45% Li2O.
12
See ASX announcement dated 18 May 2023
See ASX announcement dated 6 July 2023
14
See ASX announcement dated 5 April 2023
13
9
Table 4. Tenements
Tenement name
Interest at the end of
Quarter
Changes during Quarter
EL 6574
Fitton
100%
None
EL 6038
Mt Freeling
100%
None
EL 6111
Yerelina
100%
None
EL 6445
Wyatt Bore
100%
None
EL 26848
Walanbanba
100%
None
EL 28029
White Range East
100%
None
EL 28136
Blueys
100%
None
EL 29347
Yambla
100%
None
EL 29389
Mt George
100%
None
EL 29580
Jervois East
100%
None
EL 29581
Jervois West
100%
None
EL 29698
Finniss
100%
None
EL 29699
Bynoe
100%
None
EL 30012
Bynoe
100%
None
EL 30015
Bynoe
100%
None
EL 30669
Ross River
100%
None
EL 30793
McLeish
100%
None
EL 31058
Barrow Creek
100%
None
EL 31126
Zola
100%
None
EL 31127
Ringwood
100%
None
EL 31139
Anningie West
100%
None
EL 31140
Anningie South
100%
None
EL 31145
Barrow Creek North
100%
None
EL 31146
Barrow Creek South
100%
None
EL 31271
Bynoe
100%
None
EL 31279
Sand Palms
100%
None
EL 31407
Shoobridge
100%
None
EL 31449
Napperby
100%
None
EL 31886
Adelaide River
100%
None
EL 32205
Finniss Range
100%
None
EL 32392
Ivy
100%
None
EL 32396
Murray Creek
100%
None
EMP 28651
Observation Hill (Extractive
Lease)
100%
None
Tenement number
South Australia
Northern Territory
10
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Core Lithium Ltd
ABN
Quarter ended (“current quarter”)
80 146 287 809
30 June 2023
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(12 months)
$A’000
114,063
134,212
-
-
-
-
production
(15,428)
(28,629)
(d) staff costs
(1,872)
(6,082)
(e)
(2,379)
(10,684)
-
-
(a)
exploration & evaluation
(b) development
(c)
administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1,438
3,032
1.5
Interest and other costs of finance paid
(1,085)
(1,085)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
94,737
90,764
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
entities
-
-
(b) tenements
-
-
(2,648)
(48,113)
(3,878)
(15,810)
-
-
(a)
(c)
property, plant and equipment
(d) exploration & evaluation
(e)
investments
11
Consolidated statement of cash flows
(f)
2.2
other non-current assets - mine
development
Current quarter
$A’000
Year to date
(12 months)
$A’000
(25,408)
(101,863)
entities
-
-
(b) tenements
-
-
(c)
-
-
(d) investments
-
-
(e)
-
-
Proceeds from the disposal of:
(a)
property, plant and equipment
other non-current assets
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (Net proceeds / (payments) for Security
bond)
(7,258)
(7,258)
2.5a
Other (Government grant co-funding received)
86
172
2.6
Net cash from / (used in) investing activities
(39,106)
(172,872)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
100,000
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
5,464
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(4)
(3,812)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Share your feedback
Discover