Drilling intercepts mineralised breccia zone at Yerelina
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX : CXO
12th October 2015
Drilling intercepts mineralised breccia zone at Yerelina Zinc Project
HIGHLIGHTS
Diamond drilling has intersected a 9.8m wide mineralised breccia zone
at Great Gladstone Prospect
Base metal sulphides observed in breccia and veining as sphalerite
(zinc) along with galena (lead)
The mineralised zone is also mapped as a gossan outcrop at surface
and occurs within a fault zone interpreted to be up to 1.5km long
The current Yerelina drilling program has now been completed as
planned, with assays expected in 4‐6 weeks
50% of drilling costs will be funded by SA Government through the
PACE discovery drilling initiative
Diamond drilling has intersected a mineralised breccia zone over a 9.8m section at the Great
Gladstone Prospect. Great Gladstone is located within Core Exploration Ltd’s (ASX:CXO) Yerelina Zinc
Project which covers a total area of approximately 1,000km2 in northern South Australia.
The 9.8m section of mineralised breccias and veining was intersected by diamond drill hole YRDH003
from a depth of 144m downhole. Base metal sulphide mineralisation was observed within an intense
breccia zone. The breccia consists of rotated slate clasts in a predominantly siderite‐carbonate‐
quartz matrix with a polyphase banded breccia/vein overprinting of sphalerite and silica along with
ribbons of galena mineralisation (Figures 1‐4).
The mineralised zone intersected in YRDH003 is located down dip of outcropping mineralised
gossans. Surface channel sampling of these gossans at Great Gladstone returned significant zinc,
lead and silver assays (refer ASX Announcement 2nd June 2015). The gossans are interpreted as the
mineralised surface expression of a fault zone thought to be up to 1.5km long (Figure 5).
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Figure 1. Diamond drill core from the 9.8m zone of intense brecciation with mineralisation and veining intersected by
YRDH003 at Great Gladstone Prospect
Next Steps
Core’s diamond drilling program at Yerelina comprises a total of five angled diamond core holes
totalling approximately 1037m at a number of prospects (Table 1).
The drill core from these recently completed drillholes is currently being transported from site to
Adelaide, where the core will be cut, sampled and submitted for laboratory assay. Assay results are
expected in approximately 4‐6 weeks.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Figure 2. YRDH003 150.2m ‐ Mineralised Breccia (slate, siderite‐calcite‐quartz‐sphalerite‐galena)
Figure 3. YRDH003 153.4m – Mineralised polyphase vein with sphalerite and siderite
Yerelina Project Background
The Yerelina project area is highly prospective for base metal and silver mineralisation as evidenced
by previously identified, high grade mineralisation and historic mine workings within repeated
structures over an 8km by 3km area.
Core’s analysis of modern satellite imagery and the Company’s detailed heli‐borne magnetic and
radiometric survey data have identified that these mineralised structures are potentially part of a
large scale system of repeated north/south regional faults (Figure 5).
The Adelaide Geosyncline has long been considered prospective for sedimentary basin hosted (MVT)
base metal mineralisation styles. Core believes that the mineralisation at Yerelina may represent a
surface exposure of part of one of these large regional mineralisation styles.
The drill core from the current program will provide valuable information to help unlock and target
the interpreted MVT‐style “engine room” that is driving the observed surface mineralisation over
this large area (Figure 5).
Core has also been awarded a grant of up to $75,000 for drilling as part of the SA Government’s
PACE Discovery Drilling 2015 program.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Figure 4. Drill hole trace and interpreted geological cross section, YRDH003 Great Gladstone Prospect, Yerelina Project
South Australia.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Figure 5. Great Gladstone location, magnetic image and surface mineralised structures in plan view with block model of
conceptual geological targets (depth not to scale).
Hole_ID
Easting
Northing
RL
DIP
TAZ
Total Depth
Completion
YRDH001
328171
6672700
403.4
‐60
111.5
150.6
10/09/2015
YRDH002
330078
6673496
395.6
‐60
126
348.3
24/09/2015
YRDH003
330082
6673506
397
‐50
90
210.3
19/09/2015
YRDH004
330083
6673506
397
‐50
36.5
249.6
28/09/2015
YRDH005
335154
6671835
479
‐50
84.5
78.1
01/10/2015
Total Metres Drilled:
1037m
Table 1: Summary of Yerelina Drilling
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
For further information please contact:
Stephen Biggins
Managing Director
Core Exploration Ltd
info@coreexploration.com.au
John Field
Field Public Relations
08 8234 9555
john@fieldpr.com.au
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
by Stephen Biggins (BSc(Hons)Geol, MBA) as Managing Director of Core Exploration Ltd who is a member of the
Australasian Institute of Mining and Metallurgy and is bound by and follows the Institute’s codes and recommended
practices. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Biggins consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
This report also includes exploration information that was prepared and first disclosed by Core under the JORC Code 2004. It
has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially
changed since it was last reported. The information in all previous announcements has been compiled by Mr Stephen
Biggins as the Competent Person and who provided his consent for all previous announcements. The information that was
reported in announcements previously released under JORC Code 2004 is the announcement dated 19/03/2013 titled “High
Grade Lead‐Zinc‐Silver Assays from S.A. Project”
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Yerelina – October 2015– JORC 2012
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Geological logging by observation of NQ2 core from diamond drilling
Structural logging from oriented core drillholes orientated using
electric downhole camera
Core orientated using a Coretel system
Structural measurements established from measured alpha betas
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
Drilling
techniques
Drill sample
recovery
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘RC drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drill type (eg core, RC, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed.
The drill core from these recently completed drillholes is currently
being transported from site to Adelaide, where the core will be cut,
sampled and submitted for laboratory assay. Assay results are
expected in approximately 4-6 weeks.
NQ2 core
Core orientated using electric downhole camera (refer Table1)
Visual geological, recovery and structural logging data
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
JORC Code explanation
Commentary
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
A visual estimate of recovery over was recorded. Generally good
recovery - no bias expected
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Drill core are qualitatively logged and photographed
Qualitative logging of Core includes lithology, colour, mineralogy,
description, marker horizons, weathering, texture, alteration and
mineralization
Quantitative logging of orientated core includes structural alpha beta
angles
Total length of the hole logged
Geological observation only
The drill core from these recently completed drillholes is currently
being transported from site to Adelaide, where the core will be cut,
sampled and submitted for laboratory assay. Assay results are
expected in approximately 4-6 weeks.level being attributed to this
initial sampling.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Commentary
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
Geological observation only
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
The drill core from these recently completed drillholes is currently
being transported from site to Adelaide, where the core will be cut,
sampled and submitted for laboratory assay. Assay results are
expected in approximately 4-6 weeks.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
the use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
The drill core from these recently completed drillholes is currently
being transported from site to Adelaide, where the core will be cut,
sampled and submitted for laboratory assay. Assay results are
expected in approximately 4-6 weeks.
Discuss any adjustment to assay data.
Location of
Geological observations and primary data is captured by Core
geologists directly into an in-house referential and integrated
database system designed and managed by the Exploration
Manager. All assay data is cross-validated within the database by
various integrity scripts and externally using MapInfo drill hole
validation checks including interval integrity checks.
Accuracy and quality of surveys used to locate drill holes (collar and
All coordinates are recorded in GDA 94 MGA Zone 53.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
JORC Code explanation
Commentary
data points
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Collar location undertaken by Core Exploration staff using a handheld Garmin GPS this tool has an accuracy of approximately 3m.
Topographic control uses the DTM generated by the airborne helimag survey conducted over the area by Core in 2013
Downhole surveys were undertaken using an electronic survey
camera system
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling techniques and data.
Initial geological observations only of core
Geological observations only
Refer Figure 4. for interpreted geological and structural orientations
The drill core from these recently completed drillholes is currently
being transported from site to secure site in Adelaide, where the core
will be cut, sampled and submitted for laboratory assay. Assay
results are expected in approximately 4-6 weeks.
No audits or reviews have been undertaken
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Yerelina is contained within EL 5015 that is 100% held by Sturt
Exploration Pty Ltd a wholly owned subsidiary of Core Exploration
Ltd.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration by other parties.
Geology
Deposit type, geological setting and style of mineralisation.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
Core Exploration manages EL 5015.
EL 5015 is located on Mt Freeling Station.
All drilling was undertaken outside of Heritage, Conservation or
National Parks on EL 5015.
Modern exploration is very limited in the Yerelina area however
extensive historical workings dating back to 1908 are evident as a
number of shafts and drives
The mineralisation style targeted is sediment hosted base metal
mineralisation within an antiformal structure of Tapley Hill Formation
Refer Table 1.
If the exclusion of this information is justified on the basis that the
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
Data
aggregation
methods
JORC Code explanation
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Commentary
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
Preliminary geological observations of core only
Drilling intersects the mineralised zone at an angle (refer Figure 4).
Estimated true width of the mineralised breccia zone is
approximately 75 % of intersected width.
Refer figures and table in announcement
Drill core either side of the breccia zone is shown in Figure 6 and drill
trace in Figure 4.
Exploration activity is very limited at Yerelina however CXO collected
heli-magnetic and radiometric data in 2012, undertook previous rockchip sampling of anomalous gossans / historical mullock piles and
submitted a limited number of samples for petrology. Two other
recent drill holes at Great Gladstone are interpreted to not reach
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Criteria
JORC Code explanation
Commentary
Further work
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
target.
Subject to Board approval further drilling may be undertaken
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
A 26 Gray Ct, Adelaide SA 5000 | T (08) 7324 2987 | E info@coreexploration.com.au
www.coreexploration.com.au
Share your feedback
Discover