25 September 2024
ASX: CXO Announcement
Lithium Ore Reserve Update
Summary
•
Significant 223% growth in the BP33 Ore Reserve to 8.7Mt @ 1.38% Li2O provides a strong
foundation for restart studies currently underway
•
Grants Open Pit Update: Reduced to 0.6Mt at 1.40% Li2O, reflecting mining depletion and
operational adjustments
•
Updated modifying factors, including cost and lithium market assumptions, have resulted in
no Ore Reserves reported for several smaller deposits, including Carlton and Hang Gong
•
Finniss Ore Reserves now 9.3Mt @ 1.38% Li2O which align with the restart study areas of
focus (BP33 and Grants) and, based on the Ore Reserve assumptions, underpin a simpler
project with a notional operating life of 9.5 years at the rate of the existing 1Mtpa Finniss
process infrastructure
Core Lithium Ltd (ASX: CXO) (Core or Company) is providing an update to the Ore Reserves at its wholly owned
Finniss Lithium Project (Finniss or Project) in the Northern Territory. Finniss is located within the Bynoe Pegmatite
Field and is ~88km by road from the Darwin Port (Figure 1).
The reported Finniss Ore Reserve Estimate update is the culmination of drilling and study work undertaken
throughout 2023 and 2024. The Ore Reserve Estimate and related assumptions were developed by independent
consultant OreWin with assistance from Core.
Commenting on the updated Ore Reserve, Core CEO Paul Brown said:
"The updated Ore Reserve for our lithium assets around Finniss in the Northern Territory represents the next step
in the reset of our future operating strategy. This estimate reflects the changes in lithium market conditions since
our last Ore Reserves update and is consolidated around the high-grade BP33 deposit. The Ore Reserve for
BP33 has more than doubled, underpinning a projected life of over nine years at the currently installed processing
capacity.
The box cut and site establishment of BP33 were well underway before we paused operations earlier this year,
with excavation of the final bench of the box cut almost complete. Our team is maintaining the site in good order
so development can resume in the future, should it be supported by our restart studies and prevailing lithium
market conditions.
The overall 9.3Mt Ore Reserve, which includes a small contribution from the Grants open pit, is based on our
Measured and Indicated Mineral Resource of approximately 28 million tonnes. This represents a subset of the
Group Mineral Resource of 48.2 million tonnes, containing more than 600,000 tonnes of Li2O metal. Our current
drilling activities are targeting further resource growth and the discovery of new deposits of a similar scale to
BP33. This new Ore Reserve supports our strategy for a simpler, lower-cost, and more sustainable operating
platform for Core Lithium. Restart studies are progressing to develop the execution plan."
corelithium.com.au
Figure 1 Location of Grants and BP33 relative to Core’s existing processing infrastructure at Finniss
Tenements and Ownership
The Finniss Lithium Project covers an area of over 500km2. It is made up of a number of Exploration Licences (ELs)
and Mining Leases (MLs) including: EL29698, EL29699, EL30012, EL30015, EL31126, EL31127, EL31271,
EL31279, EL32205, ML29912, ML29914, ML29985, ML31654, ML31726, ML32074, ML32278, ML32346, MLN16,
MLN813 and MLN1148. All ELs and MLs are 100% owned by Core Lithium.
corelithium.com.au
2
Mineral Resources
Project Mineral Resources are shown in Table 1.
Table 1 Finniss Project Mineral Resources
Resource Category
Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Measured
6.3
1.41
89
Indicated
21.6
1.30
280
Inferred
20.3
1.18
239
Total
48.2
1.26
608
Ore Reserves
The overall Project Ore Reserve has decreased by 13.5% with a 11.1% decrease in contained metal (incorporating
depletion). The BP33 Ore Reserve has increased by 223% from 3.9Mt to 8.7Mt as a result of the updated BP33
Mineral Resource1. Grants Open Pit has reduced from 2.1Mt to 0.6Mt through depletion and pit redesign.
Proved and Probable Ore Reserves were estimated for the Grants Open Pit and BP33 underground deposits.
Measured Mineral Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were
converted to Probable Ore Reserves with the application of modifying factors. No Probable Ore Reserves have
been derived from Measured Mineral Resources. The effective date of the Ore Reserves is 30 June 2024.
Table 2 Ore Reserve Estimate including contained metal
Deposit
Category
Ore Tonnes (Mt)
Li2O (%)
Contained Li2O (kt)
Grants Open Pit
Proved
0.53
1.40
7.4
Probable
0.04
1.48
0.6
Total
0.57
1.40
8.0
Proved
2.43
1.33
32.4
Probable
6.25
1.40
87.2
Total
8.68
1.38
119.6
Proved
2.96
1.34
39.8
Probable
6.29
1.40
87.8
Total
9.25
1.38
127.6
BP33 Underground
Total
1.
2.
3.
4.
5.
6.
7.
8.
9.
Effective date of the Ore Reserves is 30 June 2024.
Ore Reserves are the total for the Grants and BP33 Mines.
The long-term Spodumene price used for calculating the financial analysis is US$1,450/t. The analysis has been
calculated with assumptions for crushing, processing and treatment charges, deductions and payment terms,
concentrate transport, metallurgical recoveries, and royalties.
The breakeven cut-off for underground mining at BP33 Underground is 0.80% Li 2O.
The marginal cut-off grade for the Grants Open Pit is 0.50% Li2O.
Measured Mineral Resources were used to estimate Proved Ore Reserves; Indicated Mineral Resources were used to
estimate Probable Ore Reserves.
Tonnage and grade estimates include dilution and recovery allowances.
The Ore Reserves reported above are not additive to the Mineral Resources.
Totals within this table are subject to rounding.
Refer to ASX release, “BP33 Mineral Resource Upgrade”, dated 16 October 2023. The BP33 Mineral Resource (MRE) of 10.5Mt @ 1.53%
Li2O is comprised of 2.85Mt @ 1.44% Li2O Measured MRE, 6.51Mt @ 1.55% Li2O Indicated MRE and 1.14Mt @ 1.59% Li2O Inferred MRE.
Refer to ASX release, “Significant Increase to Finniss Resources and Reserves”, dated 12 July 2022. The BP33 Ore Reserve Estimate
(ORE) of 3.9Mt @ 1.4% Li2O is comprised of 1.7Mt @ 1.4% Li2O Proved ORE and 2.2Mt @ 1.4% Li2O Probable ORE. The Grant open pit
ORE of 2.1Mt @ 1.4% Li2O is comprised of 1.8Mt @ 1.5% Li2O Proved ORE and 0.3Mt @ 1.4% Li2O Probable ORE.
1
corelithium.com.au
3
The Ore Reserves associated with Carlton, Hang Gong and Grants Underground have been removed from
reporting. They require further study work to ensure the shift in market conditions, cost environment, and learnings
from the Grants operation and BP33 project development are considered appropriately.
Further commentary on the updated Ore Reserve Estimate is provided in the supplementary section below,
followed by the required Table 1.
This announcement has been approved for release by the Core Lithium Board.
For further information, please contact:
Investor Enquiries
Media enquiries
Paul Brown
Michael Vaughan
CEO
Executive Director
Core Lithium Ltd
Fivemark Partners
+61 8 8317 1700
+61 422 602 720
info@corelithium.com.au
michael.vaughan@fivemark.com.au
About Core Lithium
Core Lithium Ltd (ASX: CXO) (Core or Company) is an Australian hard-rock lithium company that owns the
Finniss Lithium Operation on the Cox Peninsula, south-west and 88km by sealed road from the Darwin Port,
Northern Territory. Core's vision is to generate sustained value for shareholders from critical minerals exploration
and mining projects underpinned by strong environmental, safety and social standards. For further information
about Core and its projects, visit www.corelithium.com.au
Important Information
This announcement may reference forecasts, estimates, assumptions and other forward-looking statements.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it cannot assure that they will be achieved. They may be affected by various variables and changes
in underlying assumptions subject to risk factors associated with the nature of the business, which could cause
results to differ materially from those expressed in this announcement. The Company cautions against reliance
on any forward-looking statements in this announcement.
corelithium.com.au
4
Competent Person Statements
The Mineral Resources and Ore Reserves underpinning the production target and forecast financial information
in this announcement have been prepared by competent persons in accordance with the requirements of the
JORC code.
The information in this release that relates to the Estimation and Reporting of Mineral Resources has been
compiled by Dr Graeme McDonald. Dr McDonald is the Resource Manager for Core Lithium Ltd. Dr McDonald is
a member of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. He
has sufficient experience with the style of mineralisation, deposit type under consideration and to the activities
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code). Dr McDonald
consents to the inclusion in this report of the contained technical information relating to the Mineral Resource
Estimation in the form and context in which it appears.
The information in this release that relates to the Estimation and Reporting of Ore Reserves is based on, and
fairly represents, information and supporting documents compiled by Mr Curtis Smith employed as Principal
Mining Engineer by OreWin Pty Ltd. and is a Member of the Australasian Institute of Mining and Metallurgy. Curtis
Smith is a Competent Person as defined by the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”, having more than five years’ experience that is relevant to the
style of mineralisation and type of deposit and activity described in the Feasibility Study. Mr Curtis Smith consents
to the inclusion in the Public Report of the matters based on their information in the form and context in which it
appears.
Core confirms that it is not aware of any new information or data that materially affects the results included in this
announcement as cross referenced in the body of this announcement and that all technical parameters
underpinning the Mineral Resources and Ore Reserves continue to apply and have not materially changed except
as reported within this release. The announcement references the previously report Mineral Resource update
“Finniss Mineral Resource Increased by 58%” on 11 April 2024. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the original
announcements related to previously reported Ore Reserves and Mineral Resources.
corelithium.com.au
5
SUPPORTING INFORMATION
Ore Reserves for the Finniss Project include the Grants open pit and BP33 underground deposit. The following
is a summary of the Grants and BP33 combined case assumptions that underpin the FY24 Ore Reserves.
MINERAL RESOURCE
Proved and Probable Ore Reserves were estimated for the Grants Open Pit and BP33 underground deposits.
Measured Mineral Resources were converted to Proved Ore Reserves and Indicated Mineral Resources were
converted to Probable Ore Reserves with the application of modifying factors. No Probable Ore Reserves have
been derived from Measured Mineral Resources. The effective date of the Ore Reserves is 30 June 2024.
GEOTECHNICAL
The geotechnical information that has been used to support the open pit and underground mine designs used to
constrain the Ore Reserve estimate has come from additional geotechnical work completed during 2023 and
2024. The geotechnical model was developed utilising the extensive resource database, feasibility-level
geotechnical data and the geotechnical data derived from recent field and laboratory investigations.
MINING
Initial ore will be sourced from mining the existing Grants open pit This will be supplemented by ore from BP33
as underground production ramps up. Based on deposit geometry and historical experience, open pit mining is
still considered appropriate for the Grants deposit. After review the Grants pit has been redesigned with a steeper,
shorter-term slope that maximises ore extraction. The updated pit design is shown in Figure 2.
Figure 2.
Grants Pit Design Long Section
The BP33 deposit will be mined by long hole open stoping with paste backfill. The orebody width, vertical
orientation, and competent host rock ground conditions support this as a suitable mining method. The 2023 BP33
Resource Model and Underground Mine Design are outlined in Figures 3 and 4 below. The annual mine
production schedule for Grants and BP33 is shown in Figure 5.
corelithium.com.au
6
Figure 3 & 4. BP33 Resource Model and Underground Mine Design
Figure 5. Annual Mine Ore Production and Grade
corelithium.com.au
7
PROCESSING
The process design selection for the Ore Reserves case was based on metallurgical test work, analysis and
modelling completed during FY24. For the Ore Reserves case, an overall plant recovery of 83.2% using hybrid
DMS and flotation process flowsheets is achieved to produce a 5.0% Li2O concentrate at approximately 220kt per
annum. Feed is provided to the backfill plant using flotation tails to produce flowable paste for BP33 mine fill.
The process design concept is based on the existing Grants processing facility capacity, namely a 1 million tonnes
per annum (dry, undiluted) process plant feed to produce coarse and fine spodumene concentrate. It is comprised
of the existing Grants crushing circuit and DMS plant with additions for flotation with key elements listed below:
•
•
•
•
•
•
•
Three stage conventional crushing circuit
Mica Removal via Up-flow Classification
Two stage DMC Circuit (Fines and Ultra-fines)
Milling and Classification circuit
Magnetic Separation
Spodumene Flotation
Dewatering and Filtration
Annual ore processing and concentrate production for the Ore Reserves case is shown below in Figure 6.
Concentrate is transported to the Darwin Port where it is shipped to customers.
Figure 6. Annual Ore Processed and Spodumene Concentrate Production
corelithium.com.au
8
INFRASTRUCTURE
Infrastructure and services to support the Grants open pit mining and processing and the initial underground mine
development at BP33 were in place at the time of suspension of operations in 2024. Principal infrastructure items
to be put in place to support the Finniss Project restart have been considered in the capital estimate and
development schedule:
•
•
•
•
•
•
•
•
Flotation and associated modifications to the existing process plant
Backfill paste plant to support BP33 underground mining
Mine haul road from BP33 to Grants process plant
BP33 box cut, portal and decline
BP33 ventilation system
BP33 dewatering system
BP33 site buildings
TSF facility expansion (lift)
COSTS
Mining costs are to a Feasibility Study level. Costs have been calculated for a 1.0Mtpa mining rate for BP33
underground deposit. The capital and operating costs were estimated by OreWin Pty Ltd. and derived from
quotations from experienced contractors, current contracts, other suppliers, and current project costs.
Finniss has an initial project capital cost of A$282 M, that includes the Grants open pit restart capital, BP33 mining
and infrastructure capital and processing upgrade capital and capitalised operating cost prior to restart. Owners
Costs and G&A costs were prepared by Core and benchmarked against similar operations.
Finniss operating unit costs:
•
•
•
•
Grants Open Pit Mining: A$64.21 /t Ore.
BP33 Underground Mining: A$120.05 /t Ore.
Finniss Processing and Tailings: A$69.45 /t Ore.
Finniss G&A: A$11.48 /t Ore.
ORE RESERVES
This is an update to the previously reported Ore Reserve on 12 July 2022. Updated modifying factors, including
cost and lithium market assumptions, have resulted in no Ore Reserves reported for several smaller deposits,
including Carlton and Hang Gong Proved and Probable Ore Reserves were estimated for the Grants Open Pit
and BP33 underground deposits.
For Grants Open Pit and BP33 Underground, Measured Mineral Resources were converted to Proved Ore
Reserves and Indicated Mineral Resources were converted to Probable Ore Reserves with the application of
modifying factors. The effective date of the Ore Reserves is 30 June 2024.
REVENUE
Consensus pricing forecasts and project benchmarking was sourced and reviewed by OreWin in real terms for a
6.0% spodumene concentrate. A factor of 83.33% was used to derive the price for a 5.0% spodumene
concentrate. Revenue was calculated as the in-situ value after allowances have been made for:
•
•
•
•
•
Recovery to concentrate.
Concentrate transport.
Taxes and Royalties.
Lithium concentrate recovery is a constant 83.2% and occurs at all feed grades.
Gross revenue assumes 100% of Spodumene 5.0% Payable.
corelithium.com.au
9
APPROVALS
The Grants Mine was operating with all required approvals when works were suspended during 2024. At the time
of suspension, approvals were in place for the development of the BP33 Project and an amendment was being
sought to allow mining, ore transport and processing of underground ore from the BP33 deposit. Core expects
the regulatory approvals will be in place when required for the restart.
corelithium.com.au
10
The JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
•
•
•
•
Drilling
techniques
Drill sample
recovery
•
•
•
•
Nature and quality of sampling
(e.g. cut channels, random
chips, or specific specialised
industry standard
measurement tools appropriate
to the minerals under
investigation, such as down
hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material
to the Public Report.
In cases where ‘industry
standard’ work has been done
this would be relatively simple
(e.g. ‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may
be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (e.g.
submarine nodules) may
warrant disclosure of detailed
information.
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g.
core diameter, triple or
standard tube, depth of
diamond tails, face-sampling
bit or other type, whether core
is oriented and if so, by what
method, etc).
Method of recording and
assessing core and chip
sample recoveries and results
assessed.
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
•
•
•
•
•
•
•
•
•
•
•
Drilling geology, assays and resource estimation results reported
herein relate to reverse circulation (RC) and diamond drillhole
(DDH) drilling employed by Core Lithium Ltd (CXO) and
Liontown Resources Ltd (LTR) at BP33, over the period late
2016 to mid 2023 (refer to “Drill hole information” section below).
RC drill spoils over all programs were collected into two subsamples:1 metre split sample homogenised and cone split at the
cyclone into 12x18 inch calico bags. Weighing 2-5 kg, or 15% of
the original sample. 20-40 kg primary sample, which for CXO’s
drilling was collected in 600x900mm green plastic bags and
retained until assays had been returned and deemed reliable for
reporting purposes. In the case of LTR’s drilling, this primary
sample was laid out directly on the ground in rows, without using
a green bag.
RC sampling of pegmatite for CXO assaying was done on a 1
metre basis. Sampling continued into the barren wall-zone
adjacent to the pegmatite for up to 4m.
LTR’s RC samples were homogenised by riffle splitting prior to
sampling and then assayed as 2m composites (collected via a
scoop from the sample piles) with 2-3kg submitted for assay. If a
composite sample returned a significant result (typically >0.5%
Li2O) then the original individual metre intervals were also
submitted for assay.
Drill core was collected directly into trays, marked up by metre
marks and secured as the drilling progressed. Geological
logging and sample interval selection took place soon after.
DDH core was transported to a local core preparation facility
where geological logging and sample interval selection took
place. Core was cut into half longitudinally along a consistent
line between 0.3m and 1m in length, ensuring no bias in the
cutting plane.
DDH sampling of pegmatite for assays is done over the sub-1m
intervals described above. 1m-sampling continued into the
barren phyllite host rock.
RC Drilling was carried out with 5 to 5.5 inch face-sampling bit.
DDH drilling used a triple tube HQ technique. Core was oriented
using a Reflex HQ core orientation tool.
Diamond Core Drilling (DDH) was undertaken using standard
HQ core assembly (triple tube), drilling muds or water as
required, and a wireline setup. Holes were either cored from
surface or precollared by mud rotary down to rigid bedrock
(~60m) or by RC down to a depth just above the target
pegmatite.
RC drill recoveries were visually estimated from volume of
sample recovered. The majority of sample recoveries reported
were dry and above 90% of expected.
RC samples were visually checked for recovery, moisture and
contamination and notes made in the logs.
The rigs splitter was emptied between 1m samples. A gate
mechanism on the cyclone was used to prevent inter-mingling
between metre intervals. The cyclone and splitter were also
regularly cleaned by opening the doors, visually checking, and if
build-up of material was noted, the equipment cleaned with
corelithium.com.au
11
Criteria
JORC Code explanation
may have occurred due to
preferential loss/gain of
fine/coarse material.
Commentary
•
•
•
•
Logging
•
•
•
Whether core and chip
samples have been
geologically and geotechnically
logged to a level of detail to
support appropriate Mineral
Resource estimation, mining
studies and metallurgical
studies.
Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc)
photography.
The total length and
percentage of the relevant
intersections logged.
•
•
•
•
•
•
•
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
If core, whether cut or sawn
and whether quarter, half or all
core taken.
If non-core, whether riffled,
tube sampled, rotary split, etc
and whether sampled wet or
dry.
For all sample types, the
nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
Measures taken to ensure that
the sampling is representative
of the in situ material collected,
including for instance results
for field duplicate/second-half
sampling.
Whether sample sizes are
appropriate to the grain size of
the material being sampled.
•
•
•
•
•
•
•
•
•
•
•
either compressed air or high-pressure water.
Drill collars are sealed to prevent sample loss and holes are
normally drilled dry to prevent poor recoveries and
contamination caused by water ingress. Wet intervals are noted
in case of unusual results.
DDH core recoveries were measured using conventional
procedures utilising the driller’s markers and estimates of core
loss, followed by mark up and measuring of recovered core by
the geologist or geotechnician.
DDH core recovery is 100% in the pegmatite zones and in fresh
host-rock.
Studies have shown that there is no sample bias due to
preferential loss/gain of the fine or coarse material.
Detailed geological logging was carried out on all RC and DDH
drill holes. The geological data is suitable for inclusion in a
Mineral Resource Estimate (MRE).
Logging recorded lithology, mineralogy, mineralisation,
weathering, colour, and other sample features.
RC chips are stored in plastic RC chip trays.
DDH core is stored in plastic core trays.
All holes were logged in full, including RC precollars. Mud rotary
precollars were only logged if weathered pegmatite was
expected.
Pegmatite sections are also checked under a UV light for
spodumene identification on an ad hoc basis. This provides
indicative qualitative information.
RC chip trays and DDH core trays are photographed and stored
on the CXO server.
Geotechnical logging was carried out on the oriented DDH core.
Selected holes were also logged using downhole tools,
collecting a variety of information for geotechnical purposes.
The majority of the mineralised samples were collected dry, as
noted in the drill logs and database.
The field sample preparation for CXO drilling involved collection
of RC samples from the cone splitter on the drill rig into a calico
bag for dispatch to the laboratory.
LTR samples were collected as 1m riffle split samples from the
rig into calico bags. Composite samples were obtained via a
scoop from the primary piles on the ground.
The sample sizes are considered more than adequate to ensure
that there are no particle size effects relating to the grain size of
the mineralisation.
Quarter or Half Drill Core sample intervals were constrained by
geology, alteration or structural boundaries, intervals varied
between a minimum of 0.3 metres to a maximum of 1 m. The
core is cut along a regular Ori line to ensure no sampling bias.
A field duplicate sample regime is used to monitor sampling
methodology and homogeneity of RC drilling at Finniss. The
typical procedure was to collect Duplicates via a spear of the
green RC bag, having collected the Original in a calico bag.
Throughout 2022, all duplicates were collected as original splits
directly from the cyclone.
The duplicates cover a wide range of Lithium values.
Results of duplicate analysis show an acceptable degree of
correlation given the heterogeneous nature of the pegmatite and
the two methodologies used to derive the laboratory sample.
Sample Preparation
CXO drilling
Prior to 2022, sample prep occurred at North Australian
Laboratories (“NAL”), Pine Creek (NT).
Some DDH sample prep also occurred at Nagrom Laboratory in
Perth (WA).
Since 2022, sample prep occurred at Intertek (NTEL) In Darwin.
corelithium.com.au
12
Criteria
JORC Code explanation
Commentary
•
•
•
DDH samples are crushed to a nominal size to fit into mills,
approximately -2mm. RC samples do not require any crushing,
as they are largely pulp already.
A 1-2 kg riffle-split of RC Samples are then prepared by
pulverising to 95% passing -100 um.
In 2017, CXO’s samples were pulverised in a Kegormill. In mid2017, Steel Ring Mills were installed at NAL to reduce the iron
contamination that was recognised in the 2017 Drilling program.
LTR drilling
Sample prep occurred at ALS in Perth (WA).
RC Samples were rifle split to a max of 3kg and then prepared
by pulverising to 85% passing -75 um. This took place in an LM5
ring mill.
CXO drilling
• Prior to 2022, sample analysis for RC and routine DDH samples
occurred at North Australian Laboratories, Pine Creek, NT.
• Since 2022, sample analysis occurred at Intertek (NTEL) In
Darwin.
• At NAL, a 0.3 g sub-sample of the pulp is digested in a standard
4 acid mixture and analysed via ICP-MS and ICP-OES methods
for the following elements: Li, Cs, Rb, Sr, Nb, Sn, Ta, U, As, K, P,
S and Fe. The lower and upper detection range for Li by this
method is 1 ppm to 5000 ppm.
• A 3000 ppm Li trigger was set to process that sample via a
fusion method. The fusion method was - a 0.3 g sub-sample is
fused with 1g of Sodium Peroxide Fusion flux and then digested
in 10% hydrochloric acid. ICP-OES is used for the following
elements: Li, P and Fe. The lower and upper detection range for
Li by this method are 10 ppm to 20,000 ppm.
• Since 2022, all samples have been processed at Intertek
(NTEL) in Darwin via a Sodium Peroxide Fusion method in a Ni
crucible with an ICPMS/OES finish for the following elements: Li,
Al, B, Ba, Be, Ca, Cs, Fe, K, Mg, Mn, Nb, P, Rb, S, Sn, Sr, Ta,
W, and As.
• Selected drillholes were also assayed for a full suite of
elements, including REEs and gold.
• A barren flush is inserted between samples at the laboratory.
• Laboratories utilise standard internal quality control measures
including Certified Lithium Standards and duplicates/repeats.
• Approximate CXO-implemented quality control procedures
include:
• One in 20 certified Lithium ore standards were used for this
drilling.
• One in 20 duplicates were used for the RC drilling program.
• One in 20 blanks were inserted for this drilling.
• CXO runs regular Umpire analysis and has found excellent
agreement. Generally, a small under-reporting at NAL with
respect to Umpire Lab implies that assay data used for the MRE
are slightly conservative.
• There were no significant issues identified with any of the QAQC
data.
LTR drilling
• A sub-sample of the pulp was assayed by sodium peroxide
fusion ICPMS using method codes ME-ICP89 (K, Li, P) and MEMS91 (Cs, Nb, Rb, Sn, Ta) at ALS in Perth.
•
•
Quality of
assay data
and
laboratory
tests
•
•
•
Verification
of sampling
and
assaying
•
•
•
The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and whether
the technique is considered
partial or total.
For geophysical tools,
sp
Share your feedback
Discover