September Quarterly Activities Report
Australian lithium miner Core Lithium Ltd (ASX: CXO) (Core or Company) is pleased to provide its quarterly activities report for
the quarter ended 30 September 2023.
Highlights
• Spodumene concentrate production of 20,692t (compared to 14,685t Q4FY23)
• Improvement in lithia recoveries evident through the quarter, averaging 50% (from 49% in the previous
quarter)
• An 8% increase in total material moved in Q1FY24 compared to Q4FY23 and record ore extraction in
September
• Stocks on the run of mine (ROM) pad at the end of the quarter were 164,796t, compared to 7,598t at
end of Q4FY23
• Lithium fines extraction of 29,197t and maiden shipment of 15,002t
• Spodumene concentrate shipments of 23,424t at an average grade of 5.2% (compared to 5,423t at 5.6%
Q4FY23), including:
o Final concentrate shipment of 13,100t into the Yahua prepayment agreement
o First 10,000t spodumene concentrate delivered into the Ganfeng offtake agreement
• BP33 early works have progressed well including excavation of the 288m box-cut, delivery of the steel
tunnel liners, excavation of water storage, sediment dams and site roads
• Raised $107.9 million (net of costs) following completion of institutional placement and share
purchase plan
• Cash balance at 30 September 2023 of $202.1 million
Subsequent activities
•
BP33 Mineral Resource Estimate Measured and Indicated categories increased to 89% following the
Resource upgrade to 10.5Mt @1.53% Li2O1
•
DMS plant recovery optimisation initiatives continue with positive results received in October
•
Fourth spodumene concentrate shipment of 10,155t and 15,049t of fines departs from the Darwin
Port
See ASX Release dated 16 October 2023 – Mineral Resource at BP33 increased to 89% Measured and Indicated. The BP33 Mineral Resource Estimate
(MRE) of 10.5Mt at 1.53% Li2O was first reported on 16 October 2023. Core Lithium confirms that the Company is not aware of any new information or data that
materially affects this Mineral Resource Estimate and confirms that all material assumptions and technical parameters underpinning the estimate continue to
apply and have not materially changed.
1
1
Commenting on the quarter, Core Chief Executive Officer Gareth Manderson said:
‘This was a quarter of good progress in our three areas of focus; safely ramping up and optimising our concentrate production
operations at Grants, progressing the BP33 Project and delivering our exploration plan. Mining and processing performance
improvement is tangible and I am very proud of the way the team are working thoroughly and at pace to achieve our
improvement objectives.
‘Increasing recoveries is one of the greatest levers we have to add value to our business. Recovery has increased to an
average 50% for the quarter. There has been a steady improvement over time and in October to date, we have seen average
recoveries of around 55%. Recovery improvement trials are continuing to work to lock in and improve upon these results and
ensure we continue to meet our customers’ specifications.
‘It is a hive of activity at BP33 where the team is working to achieve as much as they can in the dry season. The 288m long and
40m deep box cut excavation has progressed well and deliveries of the steelwork for the tunnel which covers the box-cut to
manage water ingress, were completed in October.
‘The results of the BP33 drilling program, announced in October, have led to 89% of the 10.5Mt resource now classified as
Measured and Indicated. This is a very positive step towards the development of the BP33 mine plan and is being incorporated
into the updated feasibility study, on track to be delivered in Q1 CY24. The underground mining method has been selected and
it has been encouraging to see strong interest from a number of specialist underground mining contractors.’
Sustainability
There was one recordable injury during the quarter when a driller’s offsider sustained a hand injury. A High Potential Incident
also occurred when a drill rod fell from height striking a driller offsider on the hand. Engineering controls have been
implemented which are designed to mitigate the hazards in both activities.
The Critical Risk Management program continues to be implemented in operations, the BP33 project and in exploration
activities. Our major fatality risks across these areas have been identified and actions set to prioritise the implementation of
controls.
Wet season and cyclone preparedness is underway. This includes the construction of new storage facilities and connecting
infrastructure to enable water to be stored and moved between storage ponds.
A second round of Core Lithium’s Community Grants program has been opened for applications.
Finniss Operations
The Finniss operation continues to ramp up with excellent progress evident in both the mine and processing plant. In the Grants
open pit, the focus is on increasing equipment availability and lifting productivity and in the DMS plant on higher throughput and
improved recoveries.
2
Table 1. Production, Sales and Costs
Q3 FY23
Q4 FY23
Q1 FY24
Tonnes
3,589
14,685
20,692
%
47
49
50
DSO Shipments
Tonnes
14,774
-
-
Spodumene Concentrate Shipments
Tonnes
-
5,423
23,424
%
n/a
5.4
5.2
Lithium fines extracted*
Tonnes
-
-
29,197
Lithium fines shipped
Tonnes
-
-
15,002
Cash operating unit cost
A$/t
2,386
1,691
1,889
Inventory and other (non-cash)
A$/t
(198)
(789)
(985)
C1 Cost**
A$/t FOB
2,188
902
904
C1 cost plus royalties
A$/t FOB
2,323
1,416
1,067
Production
Spodumene concentrate produced
Recovery rate
Sales
Concentrate grade shipped
Cost of production
*At quarter end there was 8,527t of concentrate and 11,929t of lithium fines at Darwin port.
**C1 operating costs (FOB Darwin excluding royalties) include mining, processing, transport, port charges, and site based general and administration costs and are
net of fines margin by-product credit of $232/t of concentrate in the September quarter (no fines sold in FY2023). It is calculated on an accruals basis and includes
inventory movements, and credits for capitalised deferred mine waste stripping.
Mining
Grants mine performance improved over the course of the quarter. A series of performance improvement initiatives adopted by
the mining team, resulted in an 8% increase in total material moved in Q1 FY24 compared to Q4 FY23. It is planned that ore
stocks will build prior to the wet season and be drawn down throughout the wet season months. As we move into the wet
season, the total material moved is scheduled to be lower as mining is sequenced to focus on the most accessible areas.
Blasting and excavator reliability issues experienced early in the quarter were also addressed leading to record ore extraction in
September.
A second wall movement monitoring radar was installed to improve prediction of wall movement and ensure preventative
measures are established proactively.
There has also been a concerted focus on wet season preparedness. Additional high volume water storage facilities have been
constructed, haul roads have been sheeted and new equipment installed for dewatering.
Stocks on the run of mine (ROM) pad at the end of the quarter were 164,796t, compared to 7,598t at 30 June 2023.
Processing
Spodumene concentrate production for the quarter was 20,692t at a grade of 5.0%. Shipments were made to customers at
differing grades according to required contractual specifications.
During the quarter the operation completed a series of trials to improve DMS plant performance and production outcomes.
These trials include optimising blast parameters in the pit to produce the desired ore feed size, adjusting screen size in the
crushing circuit, reagent dosing set-point and timing adjustments, optimising the ultra-fines circuit, adjustments to the roll
crusher and commissioning of a mica classifier.
3
The initial set of improvement actions and operating parameters identified by this work has seen improved recoveries for the
quarter averaging 50% versus 49% in the previous quarter. Process improvement work continued during October, with the DMS
plant being run at higher rates, initially at 80 tonnes per hour and now 90 tonnes per hour. The indicative average recovery
achieved in October to date is 55% at a spodumene concentrate grade of 4.5% to 4.8%. Work will continue in the coming
months to further enhance these outcomes and optimise recovery and spodumene concentrate grade.
Core has had successful discussions with both customers to broaden the specification for spodumene concentrate to include
acceptance of grades with a minimum of 4.5% Li2O. Agreement has been finalised with one of our customers. Commercial
arrangements are currently being finalised with the second customer for the FY24 period. These changes will support continued
operational improvement during the current financial year.
Production of a concentrate at these lower grades results in higher recoveries and improved lithium yield. In addition to the
improvement work outlined above, these new product specifications are expected to deliver lithia units and a net revenue
outcome that is within the range implied from the FY24 Guidance provided by the Company (see Guidance below).
Lithium fines
To address lower recoveries in the near-term, a lithium fines material which is rejected by the DMS plant is captured and sold as
a ~1% lithia fines product. During Q1, 29,197t of fines were extracted from the tailings facility and transported to the Port of
Darwin for shipment. 15,002t of lithium fines at a grade of 1.3% was shipped in the quarter. A second parcel of fines was
building during September and was loaded with the concentrate cargo shipped in early October.
Cost of Production and Cash Flow
C1 unit costs for the September quarter of $904/t were broadly in line with the previous quarter. As a result of the improved
mining performance and the resultant build up in ore on the ROM pad, $985/t in cash costs were deferred to inventory in the
quarter. This build in the ROM stockpile positions the Company well for the upcoming wet season. Before accounting for
inventory movements, the September quarter cash operating unit cost was $1,889/t being 11% higher than the previous quarter.
This increase was due to a lower strip ratio, resulting in a higher proportion of the waste stripping costs being expensed (rather
than capitalised).
Cash at bank at 30 September 2023 of $202.1 million included $107.9 million in net proceeds from an equity raise undertaken
in August. The operating cash outflow of $26.0 million reflects:
•
the timing of shipments, with 8,527t of concentrate at the port at 30 September, which was included in the early October
shipment; and
•
the repayment of $27.7 million to Yahua, in respect of a quotational period (QP) adjustment. The QP adjustment related to
a prepayment arrangement and resulted from the significant fall in the lithium spodumene price between the date of
prepayment and the end of the quotational period.
Excluded from the cashflows in the quarter are the cash receipts relating to the 13,100t shipment in July. These tonnes were
part of the Yahua prepayment arrangement, with the cash received in Q4FY23.
Capital expenditure during the quarter was $19.9 million, with $8.5 million allocated to the BP33 box cut, with the remainder
relating to Finniss sustaining capital. The Finniss sustaining capital included $3.3 million for water storage facilities, $2.4 million
for site establishments and $2.5 million for deferred stripping.
Guidance
The operation remains on track to meet production, unit cost and capex guidance for FY24. Although the Company did not
provide guidance on concentrate grade, with the evolution of the product strategy to a higher volume at a lower grade, the
overall lithia units are expected to be within the range implied by the original guidance of 80,000t to 90,000t at an assumed
grade of 5.5%. As mentioned above, the lower grade and associated discounts, are expected to be offset by the increased
4
tonnage, with the net revenue outcome expected to be within the range implied by the original Guidance2, subject to risks
around the wet season and DMS plant and open pit performance.
ROM stocks are expected to build through Q2FY24 and be drawn down during the wet season in Q3FY24. Lithia units sold are
likely to be in line with previous sales guidance.
Production guidance of 85,000t to 95,000t of a 1% lithium fines product is unchanged, but is subject to pricing. At current
relativities to spot this product remains profitable, but further declines in the lithium price could see its production paused for
potential sale in the future.
Sales and Marketing
In early July, a shipment of approximately 13,100t of spodumene concentrate was loaded for export to China. This shipment
represented the balance of the commissioning and first production tonnes (18,500t total) sold to Yahua under ‘additional sales
agreements’ announced in March 20233.
In early September, the inaugural 10,000t spodumene concentrate delivery was made into Core’s long-term offtake agreement
with Ganfeng. The average realised price for these two spodumene concentrate shipments was $2,560/t at delivered grades.
In addition to these shipments, Core sold its first parcel of 15,000t of lithium fines with a grade of 1.3% Li2O with the ship leaving
Darwin Port on 8 September.
Subsequent to quarter end, a shipment of 10,155t of concentrate and 15,049t of fines was made in October.
Exploration and studies
The majority of the $10.1 million in exploration and studies expenditure during the quarter was allocated to further definition and
extension of existing near-mine Mineral Resources, together with BP33 feasibility study costs.
Diamond drilling continued to test the southern depth extension of Grants to ascertain if the mine life could be extended.
At BP33, the Mineral Resource definition drilling was completed and the Mineral Resource model updated (see below).
Mineral Resource extension and definition drilling programs were also undertaken at the Carlton, Lees and Booths deposits.
Drilling was also undertaken at several greenfield targets.
Regional exploration at Finniss included ANT remote sensing in the northern part of the tenement holding and soil sampling was
undertaken in the south.
The remaining funds plan to be directed towards identifying and testing new targets via a combination of geochemistry,
geophysics and drilling at Finniss and Shoobridge, and geochemistry and geophysics at Anningie-Barrow Creek.
Work to advance studies for Carlton and other regional prospects was ongoing.
BP33 Underground Project
The BP33 Underground Project is the potential second mine and long-life, cornerstone asset at Finniss. During the quarter,
Core commenced a $45-$50 million early works program and, in parallel, progressed an updated feasibility study targeting a
Final Investment Decision for the Project in Q1CY244.
The early works program includes a covered box cut, site access roads, ROM pad establishment, contractors’ facilities,
temporary services, site drainage and associated water storage and water management infrastructure.
2
3
4
This comparison is based on the current spodumene concentrate (6%) spot price of $2,250/t and an AUD:USD exchange rate of 65 cents.
See ASX announcement dated 11 July 2023
See ASX announcement dated 19 May 2023
5
In September, excavation of the 288m long box cut commenced. Box cut excavation has progressed well during the quarter
allowing work on the concrete and steel footings for the arches to commence in October, subsequent to the quarter. The box cut
tunnel liner has been custom designed and manufactured in a specialist plant in South Korea5 and the last steel arches were
delivered in October. In October, a concrete batch plant (with coolers) was installed for the box cut tunnel liner installation and
other future concrete requirements. The box cut will provide portal access from which the decline to the BP33 ore body can be
developed as a part of the next phase of capital works.
Subject to a potential early wet season and any unexpected geotechnical and groundwater impacts, the early works activities
are expected to be completed by the end of Q1CY24 to support progression of the decline subject to board approval. The
contract for the early works civil construction is being executed by Northern Australian Civil (NAC), a Darwin-based contractor
with prior box-cut development experience.
The updated feasibility study aims to capture the impact of the significantly larger BP33 Resource, which has more than
doubled in CY23 to 10.5Mt @ 1.53% Li2O6. Core has engaged a range of mining consultants with experience in both lithium
and underground mining to develop the study. The analysis includes detailed metallurgical test work, geotechnical analysis,
mine sequencing options, cost estimates and ground water management analysis.
The metallurgical test work program is 50% complete, process flowsheet design is underway and the backfill test work is
advanced.
The regional groundwater model is currently being updated to include recent groundwater data and geotechnical logging.
Preparations for the decline approvals were completed during the quarter and the approval request submitted subsequent to
quarter end.
Long-hole open stoping has been selected as the preferred mining method and expressions of interest for the selection process
have commenced with potential underground mining contractors.
An additional program of geotechnical and Mineral Resource infill drilling was completed. The mining block model is being
updated using the results of this work and the upgraded Mineral Resource will form the basis of the case presented for an
investment decision.
BP33 Mineral Resource Estimate upgrade
Subsequent to end of the quarter, Core reported that Resource definition drilling at BP33 in 2023 led to an increase in the
proportion of measured and indicated categories and an increase in Mineral Resource volume and grade from 10.1Mt @ 1.48%
Li2O7 to 10.5Mt @ 1.53% Li2O1 (Table 2, 3 Figure 1).
Results were received from four drillholes targeting infill positions, with the aim of increasing the proportion of Indicated Mineral
Resources within the existing BP33 orebody. The drilling results were in line with expectations, confirming the continuity in
grade and thickness of the modelled mineralisation domains. The BP33 mineralisation remains open down plunge.
Importantly, there is now 9.36Mt of the Mineral Resource, at 1.52% Li2O, up from 6.94Mt at 1.50% Li2O, within the Measured
and Indicated categories. This represents 89% of the total current Mineral Resource Estimate and a 35% increase on the
previous estimate for the Indicated and Measured Mineral Resource categories.
This BP33 Mineral Resource Estimate represents the final update that will inform the mine design used for the updated
feasibility study that is currently underway.
Core will provide further detail on the capital estimate for BP33 alongside a summary of the Feasibility Study results, which is
due in Q1CY24.
5
6
7
See ASX announcement dated 6 September 2023
See ASX announcement dated 6 March 2023
See ASX announcement dated 16 October 2023
6
Table 2. BP33 Mineral Resource Estimate summary October 2023
BP33 Mineral Resource Estimate
Oct 2023 – 0.5% Li2O cut-off
Resource
Category
Tonnes (Mt)
Li2O %
Li2O
Contained metal (kt)
Measured
2.85
1.44
41
Indicated
6.51
1.55
101
Inferred
1.14
1.59
18
Total
10.5
1.53
160
Note: Totals within this table are subject to rounding.
Table 3. BP33 Mineral Resource Estimate summary February 2023
BP33 Mineral Resource Estimate
Feb 2023 – 0.5% Li2O cut-off
Resource
Category
Tonnes (Mt)
Li2O %
Li2O
Contained metal (kt)
Measured
2.85
1.46
42
Indicated
4.09
1.53
63
Inferred
3.17
1.45
46
Total
10.1
1.48
151
Note: Totals within this table are subject to rounding.
7
Figure 1. Long sectional view of BP33 resource block model.
Carlton Project
The Carlton Project, located 2km from the processing plant at Finniss, has been identified as a potential future mine. In earlySeptember, results were received and announced8 for the ~7,500m diamond drilling (DD) and reverse circulation (RC) program
comprising six DD holes and 16 RC holes that commenced in April.
Drilling has provided further definition of the northern boundary of mineralisation as well as confirming the down-plunge
continuity of the spodumene-bearing pegmatite mineralisation. The drilling was within expectations of the geological model,
extending the previously known mineralisation at depth.
RC drilling also targeted a shallow sub horizontal mineralised pegmatite sill at the southern end of the main pegmatite body
(see Figure 1). It provided further definition and extended the sill towards the south. Mineralisation remains open at depth, and
ongoing drilling will be incorporated in an updated Mineral Resource and Ore Reserve Estimate.
To incorporate these results and data, Core is completing a feasibility study which is expected to be completed by the end of
CY24.
8 ASX Release 6 September 2023 Development Projects Update and BP33 and Carlton
8
Corporate
Executive appointments and registered address change
In mid-July, Core announced the appointments of Pierre Malan as Executive General Manager, Development and Exploration
and Paul Benjamin as Executive General Manager Commercial and Marketing. The appointments of Mr Malan and Mr
Benjamin culminate a 10-month recruitment process to equip Core’s executive leadership team with the operational,
commercial and development capabilities to maximise value from Core’s asset base, pursue growth initiatives and guide the
transition from developer to miner and operator.
The Company changed its registered office and principal administrative office to Level 9, 2 Mill Street, Perth, WA 6000.
$107.9 million raised through placement and share purchase plan
In mid-August, Core announced a fully underwritten institutional placement to raise $100 million before costs and offered
existing eligible shareholders the opportunity to participate in a share purchase plan (SPP) to raise up to an additional $20
million before costs.
The placement was completed on 17 August and was supported by existing and new domestic and offshore institutional
investors. The placement of 250 million new shares was done at $0.40 per new share. After costs, $96.7 million was raised from
the placement.
On 28 August, Core launched a share purchase plan (SPP) to provide eligible shareholders with the opportunity to acquire up to
$30,000 worth of Core shares. Core raised approximately $11.4 million from the issue of 28.4 million shares at $0.40 per new
share under the SPP.
In conjunction with Core’s cash at hand at the time of the raising, the $107.9 million raised from the placement and SPP were
allocated for the BP33 early works program, plant optimisation works and sustaining capital, an expanded exploration program
and studies, and for corporate purposes and working capital.
Other disclosures
As at 30 September 2023, Core had the following capital structure:
•
2,136,935,544 ordinary shares; and
•
2,416,549 unquoted performance rights.
Core’s Appendix 5B includes amounts in item 6.1. The amounts in item 6.1 represent director fees paid to entities nominated by
relevant directors.
9
Tenements
Tenement number
Tenement name
Interest at the end of
Quarter
Changes during Quarter
South Australia
EL 6574
Fitton
100%
None
EL 6038
Mt Freeling
100%
None
EL 6111
Yerelina
100%
None
EL 6445
Wyatt Bore
100%
None
EL 26848
Walanbanba
100%
None
EL 28029
White Range East
100%
None
EL 28136
Blueys
100%
None
EL 29347
Yambla
100%
None
EL 29389
Mt George
100%
None
EL 29580
Jervois East
100%
None
EL 29581
Jervois West
100%
None
EL 29698
Finniss
100%
None
EL 29699
Bynoe
100%
None
EL 30012
Bynoe
100%
None
EL 30015
Bynoe
100%
None
EL 30793
McLeish
100%
None
EL 31058
Barrow Creek
100%
None
EL 31126
Zola
100%
None
EL 31127
Ringwood
100%
None
EL 31139
Anningie West
100%
None
EL 31140
Anningie South
100%
None
EL 31145
Barrow Creek North
100%
None
EL 31146
Barrow Creek South
100%
None
EL 31271
Bynoe
100%
None
EL 31279
Sand Palms
100%
None
EL 31407
Shoobridge
100%
None
EL 31449
Napperby
100%
None
EL 31886
Adelaide River
100%
None
EL 32205
Finniss Range
100%
None
EL 32392
Ivy
100%
None
EL 32396
Murray Creek
100%
None
EMP 28651
Observation Hill (Extractive
Lease)
100%
None
Northern Territory
10
Tenement number
Tenement name
Interest at the end of
Quarter
Changes during Quarter
ML 29912
Saffums
100%
None
ML 29914
Labelle
100%
None
ML 29985
Angers North
100%
None
ML 31654
Annie/Old Crusher
100%
None
ML 31726
Grants Mineral Lease
100%
None
ML 32074
Observation Hill
(Ancillary Lease)
100%
None
ML 32278
Grants Dam
(Ancillary Lease)
100%
None
ML 32346
BP33 Mineral Lease
100%
None
MLN16
Bynoe
100%
None
MLN813
Bilatos
100%
None
MLN1148
Centurian
100%
None
Northern Territory
11
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Core Lithium Ltd
ABN
Quarter ended (“current quarter”)
80 146 287 809
30 September 2023
Current quarter
$A’000
Year to date
(3 months)
$A’000
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
21,679
21,679
1.2
Payments for
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
(43,391)
(43,391)
(d) staff costs
(3,343)
(3,343)
(e) administration and corporate costs
(2,256)
(2,256)
-
-
1.3
Dividends received (see note 3)
1.4
Interest received
1,545
1,545
1.5
Interest and other costs of finance paid
(176)
(176)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
(25)
(25)
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(25,967)
(25,967)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(2,946)
(2,946)
(c) property, plant and equipment
12
Current quarter
$A’000
Year to date
(3 months)
$A’000
Consolidated statement of cash flows
(d) exploration & evaluation
(10,106)
(10,106)
-
-
(16,994)
(16,994)
(a) entities
-
-
(b) tenements
-
-
(5)
(5)
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (Net proceeds / (payments) for
Security bond)
(530)
(530)
2.5a
Other (Government grant co-funding
received)
-
-
2.6
Net cash from / (used in) investing
activities
(30,581)
(30,581)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
111,368
111,368
(e) investments
(f)
2.2
other non-current assets - mine
development
Proceeds from the disposal of:
(c) property, plant and equipment
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(3,513)
(3,513)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Payments of lease liabilities)
(1,342)
(1,342)
3.10
Net cash from / (used in) financing
activities
106,513
106,513
13
Current quarter
$A’000
Year to date
(3 months)
$A’000
Consolidated statement of cash flows
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
152,786
152,786
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(25,967)
(25,967)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(30,581)
(30,581)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
106,513
106,513
4.5
Effect of movement in exchange rates on
cash held
(612)
(612)
4.6
Cash and cash equivalents at end of
period
202,139
202,139
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
202,139
152,786
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
202,139
152,786
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
111
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
14
7.
Financing facilities
Note: the term “facility’ includes all
forms of financing arrangements
available to the entity.
Add notes as necessary for an
understanding of the sources of finance
available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, matu